-
Data release - as updated : Tallaringa North and Tallaringa South (part of the Coober Pedy Project). Joint annual reports to licences' joint expiry/full surrender, for the period 24/5/2012 to 23/5/2019.
Three areas centred ~120 km west south-west of Coober Pedy and lying in the northern part of the Gawler Craton, one located within the Mabel Creek Domain and the other two being adjacent and further to the south, within the Christie Domain next to a...-
Document
Published: 19 Jun 2019
-
EL 6458 6783 Joint Annual Technical Report to period ending 08/11/2024
This report represents the Final Technical Report for EL 6458 and EL 6783. Originally Tri-Star was targeting coal resources within the Anderson Range Project. This focus shifted in 2021 to uranium conducive to insitu leaching, as well as metalliferous...-
Document
Published: 22 Nov 2024
-
RB 2008/00015 South Australian mineral resource production statistics for the 6 month [period] ended [30] June 2008.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2008, and compares the data with that returned for the previous six...-
Document
Published: 19 May 2008
-
RB 2008/00005 South Australian mineral resource production statistics for the 6 month [period] ended [31] December 2007.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2008, and compares the data with that returned for the previous six...-
Document
Published: 01 Jan 2008
-
RB 2009/00009 South Australian mineral resource production statistics for the 6 month [period] ended [31] December 2008.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 31 December 2008, and compares the data with that returned for the previous six...-
Document
Published: 11 May 2009
-
RB 2016/00006 South Australian mineral resources production statistics for the six month ending 31 December 2015.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 31 December 2015, and compares the data with that returned for the previous six...-
Document
Published: 01 Dec 2015
-
RB 2015/00020 South Australian mineral resources production statistics for the six month ending 31 December 2014.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 31 December 2014, and compares the data with that returned for the previous six...-
Document
Published: 01 Dec 2014
-
RB 2016/00003 South Australian mineral resource production statistics for the six month ended 30 June 2015.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2015, and compares the data with that returned for the previous six...-
Document
Published: 01 Mar 2016
-
RB 2016/00033 South Australian mineral resource production statistics for the six month ended 30 June 2016.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2016, and compares the data with that returned for the previous six...-
Document
Published: 01 Dec 2016
-
RB 90/00001 Explanatory Notes for the KIMBA 1:250 000 geological map.
The KIMBA 1:250 000 geological map sheet (hereafter referred to as KIMBA) lies in central Eyre Peninsula, extending between latitudes 33° to 34° S and longitudes 135° to 136°30'E (Fig 1). The principal towns are Kimba and Cleve, with smaller towns at...-
Document
Published: 01 Dec 1989
-
Lake Torrens South - Port Augusta area (part of the Torrens Project). First partial relinquishment report for the period 23/9/2002 to 22/9/2003.
Iron-oxide copper-gold mineralisation of either Moonta-Wallaroo or Olympic Dam style was the target of exploration in an area lying immediately north of Port Augusta. A review of historic exploration data and an evaluation of new and historic...-
Document
Published: 08 Oct 2003
-
Mulgathing and Jumbuck areas (part of the Gawler Project Central Tenement Block). Data release at licences' joint partial surrender: project joint venture - specific annual reports for the period 1/7/2009 to 22/9/2010.
As part of the ongoing Challenger Area Joint Venture with Southern Gold intended to complete brownfields exploration near the mine and to expedite greenfields exploration of the Christie Domain for Archaean metamorphic/hydrothermal gold, work carried...-
Document
Published: 05 Jan 2011
-
Bulgunnia Station (part of the Titan Base-Precious Metals Project). First annual report, plus final report to licence full surrender, for the period 10/4/2015 to 18/10/2016.
An area centred ~120 km south-west of Coober Pedy has been explored for possible economic buried gold and base metals mineralisation that may have formed within Proterozoic and older basement rocks. Mostly these are covered by the younger Jurassic...-
Document
Published: 15 Nov 2016
-
Mulgathing (part of the Woomera Iron Ore Project). Annual reports and final report to licence expiry/full surrender, for the period 22/6/2012 to 21/6/2016.
An area centred about 100 km north-west of Tarcoola has been explored principally for buried economic iron ore formed within Paleoproterozoic BIF strata and also for iron oxide - associated copper-gold (IOCG) mineralisation, while the central portion...-
Document
Published: 29 Jul 2016
-
Paragon Bore. Annual reports to licence expiry/full surrender, for the period 17/11/2016 to 16/11/2018.
A small area located ~80 km west-northwest of Coober Pedy, containing the known Paragon Bore BIF iron deposit and strike continuations of its host bedrock unit, was taken up to evaluate the probable iron resource to JORC-compliant Inferred and...-
Document
Published: 15 Jan 2019
-
Mount Christie. Annual reports to licence expiry/renewal, for the period 24/2/1995 to 23/2/2000.
Interest in an area near Mount Christie Siding was stimulated by the 1993 MESA Barton Bedrock Drilling Programme, which detected anomalous gold, chromium, base metals and platinoid metals in layered ultramafics. Initially, tenement-wide calcrete...-
Document
Published: 10 Aug 2000
-
Matt Whim. First partial surrender report, for the period 16/11/2009 to 15/11/2012.
The potential for stratabound BIF-hosted iron ore, and for economic alluvial gold and possible epithermal/hydrothermal copper mineralisation, is being investigated within an area located approximately 70 km north-east of Orroroo. Within the now...-
Document
Published: 20 Jun 2013
-
Gilles Downs (part of the West Middleback Project). First partial surrender report, for the period 8/7/2005 to 7/7/2008.
Three small areas totalling 150 square km have been relinquished from the western extremities of the two sub-blocks forming the subject licence. The only work conducted on this ground was the acquisition for the licensee during February 2007 of parts...-
Document
Published: 20 May 2008
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 2006
-
Blowout, Campfire Bore, Mulgathing, Jumbuck, Mobella and Sandstone (the Gawler Project Central Tenements Area). Joint venture operators' separate joint annual reports for the period 1/7/2010 to 30/6/2017.
Work targeting Archaean to Proterozoic iron ore in BIF that was carried out by the Iron Road JV partners during 2010-2011 comprised studies of the geological setting and physical characteristics of magnetite iron mineralisation delineated by Stage I...-
Document
Published: 30 Nov 2018