-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [ Index Part 2 of 2 ].
During the 2006 reporting period for renewed Mount Woods EL 3518 (i.e. for licence Year 6), Goldstream conducted ongoing exploration that included campaigns of diamond, RC, RAB and AC drilling, plus, in relation to the possible iron ore / copper-gold...-
Document
-
West Lake Torrens (part of the Murdie Project). Final report for geophysical, drilling and logistics program, Project ADI RD01-120 [part of Accelerated Discovery Initiative Round 1, 2021].
ADI funding was granted by DEM to Kelaray to conduct approved geophysical surveys and exploratory drilling and apply logistical support within its Murdie Project, for a combined expenditure of up to A$320,000. At the outset of the project, Kelaray...-
Document
-
Lake Torrens South, Beda Arm and Carrapateena Arm (latterly the Lake Torrens Joint Venture Project). Annual reports (singular and combined) to licences' respective expiry/renewal, for the period 21/2/1996 to 7/1/2008.
Economic Olympic Dam style iron oxide - associated copper-gold (IOCG) mineralisation has been the target of exploration carried out in three adjoining areas which together extend for about 55 to 170 km north of Port Augusta, covering southern Lake...-
Document
-
[Structural geology and tectonics research]. Applying the modified stress / strain ellipsoid to the Adelaide Geosyncline / Nackara Arc.
This report describes a case study aiming to explain the structural styles of tectonic features present in the Adelaide Fold Belt and its marginal zones, through analysing the observable products of interactions via relative motions between identified...-
Document
-
Structural studies of the Tarcoola gold deposit.
An investigation of tectonic controls of gold mineralisation in quartz veins at Tarcoola recommended the further study of : - brecciated zones (in which reefs and veins exhibit an increased gold concentration) to establish their structural...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-02, Titan mineral prospect. Project interim and final reports.
Titan prospect is located within Exploration Licence 3209, and lies 30 km north of the Olympic Dam mine. The prospect was first drilled by Western Mining Corp. in 1976 with diamond drillhole BD 1, and in 1981 with a second hole, BD 2. Both holes hit...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : the Adelaide Hills Project. Joint annual reports for the period 16/5/2005 to 31/12/2013.
The Adelaide Hills Project consists of 3419 square km of land covered by eight contiguous exploration licences, ELs 3057, 3064, 3141, 3215, 3239, 3277, 3425 and 3534, which are owned by or joint ventured to Flinders Diamonds Limited (FDL). By an...-
Document
-
Data release [made at SA Director of Mines' discretion] : Minlaton, Ardrossan and Ardrossan Coastal Area (the Moonta South Project). Annual and combined annual reports to licences' renewal, for the period 19/4/2002 to 1/8/2008.
Two exploration licences covering most of Yorke Peninsula south of Maitland were taken up by Avoca Resources to allow it to determine the region's potential for having economic basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mosely Nobs (part of the East Eyre Peninsula Project). Annual reports for the period 5/7/2006 to 4/7/2016.
A licence area now consisting of two separate small blocks located about 60 km west of Whyalla was taken up, along with other ground in the region, because it is thought to have potential for the discovery of uranium associated with Olympic Dam style...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Deception Hill, Lake Everard West, Yellabinna, Cooritta Hill and Lake Everard (the Tunkillia Project). Joint annual reports for the period 1/1/2012 to 31/12/2018.
In 2012, the first year after the project's acquisition, TGL spent A$6.4M on gold exploration and on doing mining feasibility studies. The work program was mainly an ongoing evaluation of development opportunities for the Area 223 gold resource. Some...-
Document
Published: 29 Jan 2019
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 2018
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-49, Bird-In-Hand Mine Deeps Project gold mineral prospects. Project final report.
At the historic Bird-In-Hand mining claim, where previous mine exploration drilling beneath the old workings by current licence operator Maximus Resources had delineated an inferred remaining gold resource of 53,000 ounces over the depth extent from...-
Document
-
The Hummocks. Annual reports and final report to licence full surrender, for the period 30/6/2009 to 17/8/2017.
EL 4278 was Southern Uranium's first mineral exploration foray into the northern Yorke Peninsula. The subject tenement was pegged in January 2009 in order to secure ground surrounding the northern reaches of the Pine Point Fault. This particular...-
Document
Published: 31 Aug 2017
-
Phar Lap Outstation. Combined first annual/final report at licence full surrender, for the period 17/7/2018 to 22/11/2019.
An area centred ~228 km south-southeast of Coober Pedy has been explored for possible buried IOCG type mineralisation, which could have formed in Mesoproterozoic basement rocks in a position which it was thought had not been properly tested by past...-
Document
Published: 12 Sep 2019
-
Data release - as updated : Muckanippie. Annual reports to licence expiry/full surrender, for the period 20/10/2005 to 23/2/2019.
EL 3438 Muckanippie is located in the northern Gawler Craton, on the western margin of the Gawler Range Volcanics Domain, and is centred approximately 60 km north-west of Tarcoola. Basement outcrop on the licence area is sparse, with a thin cover of...-
Document
Published: 25 Feb 2019
-
Lake Callabonna. Partial surrender reports at licence expiry/renewal, for the period 6/12/2013 to 24/08/2023.
Ten separate small portions of EL 5360 together covering 249 square km have recently been relinquished due to their perceived diminished prospectivity for IOCG mineralisation. The only work done on these sub-blocks has consisted of part of a ground...-
Document
Published: 09 Dec 2015
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-24 - Nankivel Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources Limited (IVR) is continuing to explore its contiguous tenement package in the Southern Gawler Ranges for economic precious and base metals, following its discovery of the Paris silver deposit in 2011. A prospective region called...-
Document
Published: 20 Jun 2017
-
Oak Dam North-east, Lake Torrens, Glenside, Winjabbie and Trimmer Inlet; plus Shore Hill and Red Swamp (initially the UXA Stuart Shelf South JV Project; then OZ Minerals' Stuart Shelf Project). Joint annual reports for the period 1/11/2010 to 6/1/2017.
In continued exploration for possible economic buried Olympic Dam or Prominent Hill type IOCG style mineralisation that may exist within Proterozoic bedrock, joint venture operator Straits Resources undertook the following work on the project...-
Document
Published: 06 Mar 2018
-
Data release - as updated : Maitland (the Yorke Peninsula Copper Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/8/2008 to 24/8/2017.
An area of the western Yorke Peninsula, comprising three separate sub-blocks, was taken up to explore for possible economic buried IOCG-U deposits similar to those at Hillside (located 25 km to the east of sub-block 'B'), Olympic Dam, Prominent Hill...-
Document
Published: 18 Oct 2017
-
Anna Creek. Annual reports plus final report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2014.
A small area centred ~20 km north-west of William Creek has been explored for possible economic buried IOCG mineralisation, which could have formed in Mesoproterozoic basement rocks that in the surrounding region exhibit several large coincident...-
Document
Published: 26 Sep 2014