-
Wallaroo and Moonta mines and smelters, Yorke's [sic] Peninsula, South Australia. History, nature and methods.
A detailed account of the large scale copper mining and processing operations occurring in the 'Copper Triangle' region of South Australia in the few years following the end of the First World War. The included metrics and pictorial coverage of many...-
Document
Published: 01 Jan 1921
-
Yumali. Progress reports to licence expiry/renewal, for the period 7/6/1978 to 18/10/1983.
Base metal exploration activities undertaken by Thiess Brothers in the Yumali - Coomandook area investigated several coincident regional gravity and aeromagnetic anomalies arising from concealed Palaeozoic basement rocks. These anomalies are part of a...-
Document
Published: 14 Nov 1983
-
RB 51/00127;Amdel 00078 Mobile gold treatment plant design and cost estimate.
This report covers the design and equipment recommended for the construction of a mobile treatment plant to replace the existing South Australian Government State Batteries. The capacity of the equipment included in the design is approximately 50 tons...-
Document
Published: 01 Nov 1960
-
RB 57/00041;Amdel 00265 Mobile crushing and sampling plant.
Further to the design and cost estimate for a mobile gold treatment plant, the South Australian Government Department of Mines requested a design and cost estimate for a mobile crushing and sampling plant. The plant is to be capable of reducing 6-9...-
Document
Published: 01 Jul 1963
-
RB 84/00078 Gold production from Peterborough State Battery for the period 1/1/1956 to 31/12/1983. Historical report no. 2.
Gold recovery is variable. From 1956 - 1983, total of 2 719.97 tonnes of ore were treated and 35 841 grams of gold bullion recovered. Total ore crushed since operations began in 1897 is 14 808.45 tonnes. Total gold bullion recovered is 349 868 grams....-
Document
Published: 01 Nov 1984
-
RB 79/00150 Evaluation of gold tailings and slimes, Government Stamp Battery, Peterborough.
Tonnages and gold content of tailings and slimes stockpiled at the Government Stamp Battery at Peterborough were calculated from hand auger drilling and mining return records. The amount of recoverable gold was determined by mineralogical and...-
Document
Published: 01 Jan 1980
-
RB 89/00079 Mongolata Gold Battery. Historical review and summary of ore treated and gold recovered, 1923-1954.
From commencement of crushing operations in March 1933 until its closure in March 1954, the South Australian State Government battery at Mongolata Goldfield crushed a total of 7600 tonnes of ore for a recovery of 318.25 kg of gold bullion via onsite...-
Document
Published: 01 Jul 1989
-
RB 98/00010 Regolith studies related to the Challenger gold deposit, Gawler Craton, South Australia. Geochemistry and stratigraphy of the Challenger gold deposit - Volume 1: text, and Volume 2: appendices.
The Challenger gold deposit lies in the northern Gawler Craton, South Australia, 750 km NW of Adelaide, and 140 km NW of Tarcoola. A 1.5 km traverse (the regolith line) was chosen for the study of geochemical dispersion and regolith stratigraphy...-
Document
Published: 01 Mar 1998
-
RB 98/00008 Geochemical studies of the regolith at the Mount Gunson copper deposits, Stuart Shelf, South Australia.
The principal objective of the Cooperative Research Centre for Landscape Evolution and Mineral Exploration (CRC LEME) Shields Program and the Primary Industry and Resources of South Australia (PIRSA) Regolith Terranes Group in South Australia is to...-
Document
Published: 01 Feb 1998
-
[ Report on drilling ] Evaluation of the East Lagoon orebody, Mount Gunson, South Australia.
This report presents the results of ore definition drilling derived from 60 percussion and diamond drill holes put down over the central and southern parts of the East Lagoon orebody, and gives the methodology for calculating currently mineable ore...-
Document
-
Outalpa Hill. Data release made upon the full surrender of a subsequent licence : progress reports to licence expiry, for the period 15/7/1988 to 8/8/1994.
Exploration for possible economic gold occurrences in an area surrounding Outalpa Hill in the Olary Ranges, 25 km north of Manna Hill township, has been conducted initially by a private prospecting syndicate with the assistance of industry...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [ Index Part 2 of 2 ].
During the 2006 reporting period for renewed Mount Woods EL 3518 (i.e. for licence Year 6), Goldstream conducted ongoing exploration that included campaigns of diamond, RC, RAB and AC drilling, plus, in relation to the possible iron ore / copper-gold...-
Document
-
South Eagle. Data release made at transfer of licence ownership : annual reports for the period 17/9/1997 to 16/9/2000.
The majority of mineral exploration undertaken in the South Eagle area, centred 40 km north-east of Olary, has targeted stratabound Pb-Zn-Ag, stratabound massive sulphide Cu-Zn-Co-Mn, and Cu-Au mineralisation that may have formed in Proterozoic rocks...-
Document
-
Chimpering Rock Hole, Lake Tallacootra, Pybung and Chundaria (the BARTON base and precious metals project). Annual reports for the periods 25/7/1992 to 24/7/1994, and 30/12/1994 to 29/12/1996.
In 1993 the SA Government flew a regional aeromagnetic survey over the western Gawler Craton as part of the South Australian Exploration Initiative, which prompted North Ltd to change direction with its BARTON area exploration programme, to address...-
Document
Published: 13 Mar 1997
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Paragon Bore. Progress reports and final report to licence expiry/full surrender, for the period 27/5/1980 to 3/2/1984.
Drilling of 1 rotary mud and 4 diamond holes (total 1447.2 m, including 602 m of rotary mud precollars) on the Mabel Creek gravity high, initially searching for Olympic Dam type Cu-U-Au mineralisation, found that several large coincident gravity and...-
Document
-
Data release at first partial surrender on 20/8/1989 : report on investigations into the platinoid potential of the Black Hill Norite, EL 1419, Sedan, SA.
TARGET: Possible primary magmatic platinoid and/or other precious metals deposited at or near the base of expected cumulate layered rock sequences within the Black Hill Norite. EXPLORATION: After making preliminary regional geophysical and drillhole...-
Document
-
Nyllow Hill. First partial surrender report for the period 2/9/1988 to 1/9/1989.
The licence was taken out to assess the untested potential for finding platinum group metal occurrences associated with two known ultramafic intrusive plugs outcropping in the Lincoln Uplands, 40 km north-northeast of Port Lincoln. Incidental...-
Document
-
Midgerie, Barton South and Mount Christie. Joint first partial surrender report, for the period 13/4/1981 to 29/9/1991.
TARGET: Diamonds in the Tallacootra - Barton - Wynbring region; precious and base metals (explored for by joint venture partners). EXPLORATION: Diamonds : Evaluation of targets generated by interpretation of an airborne magnetic-radiometric-VLF-EM...-
Document