-
Data release - as updated [made at SA Director of Mines' discretion] : Johns Outstation / Giffen Well. Annual reports for the period 8/10/2007 to 7/10/2018.
To date, land access restrictions imposed by the Commonwealth Department of Defence have prevented any field work from occurring on the subject tenement, taken up to cover the Giffen Well magnetite iron ore deposit and adjacent inferred prospective...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Hawks Nest. Annual reports to licence expiry/renewal, for the period 12/3/2004 to 7/4/2009.
During licence Year 6, in November 2005, Mt Gibson Iron Limited (MGI) undertook a brief exploration campaign at Hawks Nest, acting under the terms of an access and option agreement which it had made with Felix Resources Limited, a company seeking to...-
Document
-
Indooroopilly, Muckanippie and Commonwealth Hill. Data release made in lieu of submitting a joint partial surrender report for ELs 5799, 6166 and 6348: all project licences' joint annual reports for the period 21/3/2015 to 30/6/2019.
An agglomeration of exploration licences which partly surrounds the Challenger gold deposit at distances of between 35 and 80 km is being explored for similar type economic lode gold mineralisation that may exist in buried Archaean bedrock relatively...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports to licence expiry/renewal, for the period 2/6/2003 to 1/6/2008.
Exploration Licence 3089 is located in the central Gawler Craton and is centred near the township of Tarcoola. Continuation of tenure over the same area, from former ELs 1827 and 2510, was renewed by Gravity Capital Ltd on 2/6/2003, and full licence...-
Document
-
RB 2010/00001 Investigation of partial leach soil surveys at the Tunkillia gold prospect, South Australia.
Geochemical soil samples were taken along two traverses over shear-hosted gold mineralisation in Area '223' at the Tunkillia gold prospect, located 550 km north-west of Adelaide. The objective was to assess the effectiveness of near-surface soil...-
Document
Published: 01 Nov 2009
-
RB 2020/00018 Gawler Craton Airborne Geophysical Survey Region 9B, Kingoonya – Enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Jul 2020
- ZIP,
-
Data release - as updated [made at SA Director of Mines' discretion] : Deception Hill, Lake Everard West, Yellabinna, Cooritta Hill and Lake Everard (the Tunkillia Project). Joint annual reports for the period 1/1/2012 to 31/12/2018.
In 2012, the first year after the project's acquisition, TGL spent A$6.4M on gold exploration and on doing mining feasibility studies. The work program was mainly an ongoing evaluation of development opportunities for the Area 223 gold resource. Some...-
Document
Published: 29 Jan 2019
-
Hicks Hill. Annual reports plus final report to licence expiry/full surrender, for the period 9/12/2009 to 8/12/2014.
A previously discovered (SADM, 1950s) partly outcropping body of magnetite-rich Palaeoproterozoic BIF rock (jaspilite), located ~46 km east of Tarcoola, has been investigated afresh for its current economic potential as an iron ore resource. Similar...-
Document
Published: 20 Apr 2015
-
Warrior. Annual reports to licence expiry/full surrender, for the period 7/11/1994 to 13/8/2001.
Following initial assessment of available data, exploration for copper, gold and base metals in an area 60 km west of Tarcoola concentrated on regional calcrete sampling. Analysis for gold and a suite of base metals indicated several areas of...-
Document
Published: 26 Jun 2001
-
RB 2015/00029 What lies beneath the western Gawler Craton? [Eucla-Gawler Seismic Survey line] 13GA-EG1E Seismic and Magnetotelluric Workshop 2015. Extended abstracts [of technical presentations].
This compilation of written and associated oral papers that were presented for the “What lies beneath the western Gawler Craton? 13GA-EG1E Seismic and Magnetotelluric Workshop 2015” is an important step in building our geological understanding of one...-
Document
Published: 01 Dec 2015
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 2018
-
Woomera Project. Joint annual reports for the period 29/9/2008 to 15/6/2017. Includes information status for EL 6085 at licence expiry, for period 16/06/2017 to 01/01/2023: no work performed.
No field work was performed on the three subject licences during the period 2008-2010 inclusive. During 2010, Dominion Gold Operations undertook a desktop evaluation of the possible iron ore potential of the licences. During 2011, the licensee...-
Document
Published: 01 Jan 2023
-
RB 2007/00015 Geochronology of the Gawler Craton, South Australia.
Geochronology enables us to determine the age of rocks and minerals. The variety of isotopic geochronological techniques give complementary information on, for example, the timing of igneous or metamorphic crystallisation, as is often the case for the...-
Document
Published: 01 Sep 2007
-
RB 2019/00008 Gawler Craton Airborne Geophysical Survey Region 9A, Childara – Enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Apr 2019
- ZIP,