North Fowlers Bay - Chundaria. Annual reports and progress reports for the periods 15/9/1993 to 14/9/1998, and 28/10/1998 to 12/3/1999.
North Ltd's Barton Project commenced in 1990 across a number of licences progressively taken out over the western Gawler Craton, which eventually came to include EL 1865. Initial exploration for heavy mineral sand in the Barton-Ooldea area, 100-200...-
Document
Published: 06 May 1999
-
Calca and Poochera (the Streaky Bay Project). Data release made in lieu of submitting a first partial relinquishment report : joint annual reports for the period 22/10/2001 to 13/2/2005.
A multipart licence project area located approximately 100-150 km south-east of Ceduna is being targeted for possible Voiseys Bay type nickel, copper, cobalt and platinum group metal deposits within mafic to ultramafic basement rocks buried beneath...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-33 - north-eastern Gawler Craton - Douglas Creek gravity anomaly Mesoproterozoic basement IOCG mineral prospect. Project interim and final reports.
The north-eastern margin of the Gawler Craton is prospective for Mesoproterozoic iron oxide - associated copper-gold (IOCG) style mineralisation, but the considerable depth to crystalline basement, combined with the presence of an artesian Mesozoic...-
Document
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2005 to 6/11/2010. [ Index Part 2 of 2 ].
During the first year of renewed tenure under EL 3445, the work done consisted of performing diamond and RC drilling programmes which were partly funded by PIRSA's PACE Initiative as Theme 2, Year 2 and 3 approved Drilling Collaboration Projects. The...-
Document
-
Mount Gunson Project. Cattlegrid mine : ore grade control mining / milling management reports and data for the period July 1975 to August 1983.
There is no abstract created for this record-
Document
-
Area within Tallaringa Conservation Park. Biennial reports and final report to licence full surrender, for the period 25/10/196 to December 2001.
Proterozoic and Archaean rocks of the Gawler Craton were the target hosts for gold and base metal mineralisation in the area of the eastern Tallaringa Conservation Park, west of Coober Pedy. Following an assessment of geological and geophysical data,...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Ardrossan, Minlaton and Ardrossan coast areas (the Pine Point Project). Joint annual reports for the period 2/8/2008 to 1/8/2014.
Rex Mineral’s ('Rex') primary objective in the Pine Point Project area is to determine the potential for economic basement-hosted iron oxide - associated copper-gold mineralisation such as that found at Olympic Dam, Prominent Hill, Ernest Henry and...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
Cattlegrid copper mine. Mineragraphy of ore processing mill feed and product samples, as submitted for examination on a monthly basis over the period October 1974 to May 1983.
The included mineralogical reports and explanatory prior company correspondence give the results of, and rationale behind, a lengthy programme of mill product sampling and sample description for weekly to monthly process monitoring throughflow samples...-
Document
Published: 13 May 1983
-
Olympic Dam operations. Environmental management programme annual report. 01/03/90 - 28/02/91.
Reports on monitoring of: - air and solid waste pollution; - drill pad rehabilitation; - meteorology, vegetation, flora, fauna and soil salinity; - mine ground water drainage; - artesian water drawdown at Wellfield A in the Great Artesian Basin;...-
Document
-
Olympic Dam operations. Wellfield A area. Production history and aquifer response for the period July, 1989 to June, 1990.
Data relating to work carried out, water production and aquifer response from the Wellfield A area in the Great Artesian Basin is presented.-
Document
Published: 01 Jan 1990
-
Data release - as updated [made at SA Director of Mines' discretion] : Nullarbor, Yalata North and Yalata East (the Western Gawler Craton Project). Joint annual reports for the period 24/10/2012 to 2/4/2018.
A cluster of adjoining licence sub-blocks taken up in the Yalata region are being explored for possible buried Thompson Belt style magmatic copper-nickel mineralisation which could be associated with large strike-slip fault structures transecting the...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby Downs, Acropolis South, Parakylia, Roxby Downs North, Hidden Swamp and Roxby Downs (the Theseus Project). Joint annual reports for the period 4/5/2012 to 30/6/2018.
Brownfields exploration for possible buried economic Mesoproterozoic basement-hosted IOCG type mineralisation, so far undertaken by BHP Billiton ('BHPB') within six semi-contiguous licences together covering an area extending from 40 km south to 68 km...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Boolooroo Goldfield and Kate Hill. Joint annual reports for the period 2/1/2009 to 8/2/2019.
Two adjoining licence areas located ~ 40 km north-east of Leigh Creek township, in the ranges lying immediately east of the Telford coal basin, are being explored for possible economic occurrences of marble rock which are believed to hold enormous...-
Document
-
Peake and Denison Project [Part]. Data release upon the surrender of licence. Annual report (15/4/1999) submitted until the commencement of the BHP Billiton - Rio Tinto JV combined reporting. Plus the JV final report on this licence, to 15/4/2003.
Exploration carried out over a south-eastern flanking portion of the Peake and Denison Inliers has targeted possible large-scale Proterozoic ironstone-hosted Cu-Au deposits within a highly magnetic, multiply deformed and metamorphosed buried basement...-
Document
-
Douglas Creek (part of the Peake and Denison IOCG Project). Annual reports and final report to licence full surrender, for the period 21/9/2000 to 30/4/2010.
Rio Tinto Exploration Pty Ltd (Rio Tinto) took up the subject tenement at Douglas Creek, located ~ 20 km east of the central Peake and Denison Ranges, to explore the Palaeoproterozoic and Mesoproterozoic metamorphic basement rock sequence that it...-
Document
-
Data release [made at SA Director of Mines' discretion] : Andamooka (part of the Stuart Shelf Project). Progress reports to licence expiry/renewal, for the period 2/5/1975 to 1/5/1977. [ Index Part 2 of 2 ].
(Abstract continued) During the fifth quarter of WMC's tenure of EL 190, a programme of stepout appraisal diamond drilling was continued, to assess the size of the copper-uranium occurrence discovered by hole RD1 (previously called RDD1 by WMC)....-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : the Adelaide Hills Project. Joint annual reports for the period 16/5/2005 to 31/12/2013.
The Adelaide Hills Project consists of 3419 square km of land covered by eight contiguous exploration licences, ELs 3057, 3064, 3141, 3215, 3239, 3277, 3425 and 3534, which are owned by or joint ventured to Flinders Diamonds Limited (FDL). By an...-
Document