-
RB 79/00088 Wilkinson 1. Well completion report.
Wilkinson 1 stratigraphic well was drilled by the SA Department of Mines and Energy in mid-1978, about 250 km south-west of Coober Pedy, in the Tallaringa Trough. Here a thick section of Cambrian claystones, limestones and evaporites, at least 594 m...-
Document
Published: 01 Oct 1979
-
Arkaroola. First partial surrender report at licence expiry/renewal, for the period 5/12/2001 to 4/12/2011.
An area on northern Arkaroola Station, which has since 26/4/2012 has been legally quarantined from mineral exploration operations under the South Australian Mining Act, was considered by its former titleholders to be prospective for an array of...-
Document
-
Douglas Creek (part of the Peake and Denison IOCG Project). Annual reports and final report to licence full surrender, for the period 21/9/2000 to 30/4/2010.
Rio Tinto Exploration Pty Ltd (Rio Tinto) took up the subject tenement at Douglas Creek, located ~ 20 km east of the central Peake and Denison Ranges, to explore the Palaeoproterozoic and Mesoproterozoic metamorphic basement rock sequence that it...-
Document
-
Garford [Outstation], Indooroopilly Outstation and Half Moon Lake (the Challenger West Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 30/4/2003 to 13/10/2010.
The three licences comprising the Challenger West Project were taken up principally to explore for economic gold, which could possibly occur in strike extensions of known gold lodes formed within Archaean basement rocks that constitute the Challenger...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kottata Well, Eldale, Tootla and Broadacres (also part of the Yaninee Project). First annual report for EL 3135, plus subsequent joint annual reports, for the period 29/9/2003 to 5/6/2009.
An area located on central western Eyre Peninsula between Minnipa and Port Kenny was taken up to explore the Precambrian basement rocks, which are poorly exposed there, for possible economic buried iron oxide - associated copper-gold (IOCG) deposits....-
Document
-
Combined report on the full surrender of Sheringa EL 688 and partial surrenders for McLachlan EL 670 and Tuckey EL 687, Polda Basin, South Australia, 17th May 1982.
Relinquishment of parts of the licenses held in the Lock, Tuckey and Tooligie area was made following drilling (31 holes totalling 2 960 metres) to investigate lignite occurrence in the Polda Basin. Possible reserves of Jurassic and Eocene coals in...-
Document
Published: 01 Jan 1982
-
Data release - as updated [made at SA Director of Mines’ discretion] : Rounsevell Hill, Yellabinna and Mulgathing Homestead (the Ambrosia Project). Joint annual reports for the period 24/5/2005 to 1/6/2015.
Some large areas of vacant ground located in the south and west of Mulgathing Station that lie adjacent to the Bulgunnia Fault Zone were taken up by Monax Mining initially to explore primarily for Olympic Dam type IOCG-U mineralisation and also for...-
Document
Published: 06 Oct 2015
-
Data release - as updated [made at SA Director of Mines’ discretion] : Arkaroola. Annual reports for the period 5/12/2008 to 3/12/2015.
During the 2008-2009 licence year, most of the new work done consisted of appraisal rotary mud drilling at Four Mile East (112 holes for 24,460 m) and Four Mile West (113 holes for 19,120 m), with the addition of one NQ diamond cored hole (AKC093) for...-
Document
Published: 20 Jan 2016