Lake Phillipson area. Progress and technical reports for the periods 23/11/1978 to 22/11/1980, and 12/2/1981 to 11/5/1982. [forms Part 2 of a SADME - compiled Lake Phillipson coal deposit data package released in December 1994].
The licensee's 1981 coal search programme at Lake Phillipson had the following objectives: - delineation of the total extent of the coal measures; - resolution of seam stratigraphy and correlation of seams between the Main and West Areas; -...-
Document
-
Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
RB 77/00077 Coober Pedy town water supply. Groundwater prospects and completion report. Stuart Range bores 7-10.
Groundwater of salinity lower than 5000 mg/l was found to occur north of Coober Pedy at a distance of 20-30 km. Four holes (cumulative depth 274 m) were drilled and encountered water of salinity 4000-9000 mg/l. A production well will commence in the...-
Document
Published: 01 Jan 1977
-
RB 82/00059 Marla town water supply investigation - Completion report SA.
Extra drilling and testing of 13 wells (523 metres) has revealed a 2 aquifer system.-
Document
Published: 01 Sep 1982
-
RB 78/00030 Coober Pedy town water supply groundwater investigations report no. 2 - EWS Department.
The proposed town water well SR11 (60 metres) 22 km NE of Coober Pedy was drilled and tested. Water quality is acceptable.-
Document
Published: 01 Jan 1978
-
RB 80/00035 Stuart Highway, Pimba to Baker Well section. Drilling for construction water.
Of 16 wells drilled, only 6 have an adequate supply of saline groundwater for construction use. On the western part of the section, 4 wells into the deeper fractured rock aquifer were dry. Subsequently another 8 randomly sited wells were drilled into...-
Document
Published: 01 Mar 1980
-
RB 79/00066 Sampling and measurement of mound springs, Great Artesian Basin, South Australia. Progress report no. 3, WARRINA, OODNADATTA, BILLAKALINA, CURDIMURKA sheets.
This report virtually completes a systematic survey of mound springs around the south-western edge of the Great Artesian Basin in South Australia. There are as yet about 20 springs left unsampled, mostly on BILLAKALINA, in the Francis Swamp and...-
Document
Published: 01 Jan 1979
-
RB 77/00059 Coober Pedy town water supply. Completion report. Stuart Range bores 5 and 6.
Two production water wells were drilled during March-May, 1974. The wells are located about 1 km apart within the Coober Pedy town area, and both draw upon the Cadna-Owie Formation. Salinity is uniformly high in both holes, at 16,600 - 16,700 mg/l....-
Document
Published: 01 Jan 1977
-
RB 89/00066 GAB field survey - 1986/1987.
Data collected from 116 flowing and 24 non-flowing wells included shut in pressure, temperature, flow rate, pH, headworks condition and full chemical analyses of water samples. An observation network is to monitor controlled flowing wells every 2 years.-
Document
Published: 01 Aug 1989
-
RB 89/00031 Palynological analysis of Early Cretaceous sediments east of the Peake and Denison Ranges.
Samples of calcareous concretions, mudstone, siltstone and sandstone were assigned an Aptian age.-
Document
Published: 01 May 1989
-
RB 96/00021 Palynological dating and correlation of Mesozoic sediments from the ABMINGA 1:250 000 sheet, SA.
Palynological evidence indicates that all 13 submitted drill core sedimentary rock samples, excepting one (taken at 138.2 metres depth in hole A68-1), are late Aptian to earliest Albian in age. The sediments were deposited in environments ranging...-
Document
Published: 01 May 1996
-
Mundowdna, Wilpoorinna and Dalarinna Hill (part of the Marree Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 20/3/2009.
Three areas located along the southern margin of the Eromanga Basin, east and south-east of Marree and adjacent to the Strzelecki Track, have been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones, as it...-
Document
-
Olympic Dam Project : operator's reports on hydrogeological investigations, Great Artesian Basin wellfields, for the period 1995-2004.
There is no abstract created for this record-
Document
-
Wintinna Coalfield hydrogeological study.
This report presents a description of the hydrogeology of the Wintinna coal deposit proposed mine site area, and of the investigative work performed to acquire specific data on aquifer properties and groundwater behaviour. Two production bores were...-
Document
Published: 14 Sep 1983
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 1906
-
ELs 4678 - 4689 (the Oodnadatta Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 22/2/2011 to 9/9/2014.
The Oodnadatta Project consisted originally of twelve exploration licenses covering 7125 square km in far northern South Australia, this mainly being ground situated to the south and south-east of Oodnadatta. Uranium Equities Limited (UEQ) believed...-
Document
Published: 28 Oct 1914
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Dewatering investigations, Lake Phillipson area, South Australia.
An initial investigation programme aimed at obtaining hydraulic data from part of the Lake Phillipson Permian coal field been successfully completed. The initial area under consideration for mining is of approximately 130 hectares within the Western...-
Document