-
Yarrana Hill, Dunn Hill, Wallala Hill and Mount Centre (the Ceduna heavy minerals Project). Joint progress reports and joint final report to licences' joint expiry/full surrender, for the period 21/12/1989 to 20/6/1991.
TARGET: Possible Tertiary marine placer deposits of heavy mineral sands (ilmenite, rutile, zircon) on the south-eastern margin of the Eucla Basin in the Nunjikompita - Hiltaba area, 100 km east of Ceduna. EXPLORATION: A consultants' photogeological...-
Document
Published: 16 Oct 1991
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1976 to 9/6/1978.
There is no abstract created for this record-
Document
-
RB 90/00059 Palaeoproterozoic St Peter Suite of the western Gawler Craton.
A suite of intrusives (St Peter Suite - new name) along western Eyre Peninsula displays a wide range in composition, texture and relationships. The features are typical for mingling and mixing of felsic and mafic magmas, with U-Pb geochronology...-
Document
Published: 01 Oct 1990
-
RB 90/00060 Palaeoproterozoic Nuyts Volcanics of the western Gawler Craton.
U-Pb zircon geochronology of the Nuyts Volcanics yielded an age of 1627 +/- 2 Ma, supporting a previous dating of 1631 +/- 3 Ma. The major and trace element compositions, as well as the presence of a tectonic fabric, suggest that the Nuyts Volcanics...-
Document
Published: 01 Oct 1990
-
Data release - as updated : Cultana (latterly part of the Spencer Project). Annual reports to licence expiry/full surrender, for the period 19/4/2006 to 12/9/2017.
An area located 30 km south of Port Augusta and covering more than 792 square km east of the main highway between Port Augusta and Whyalla, which falls entirely within part of the Cultana Army Training Area held by the Australian Commonwealth...-
Document
Published: 06 Oct 1917
-
Wynbring [part of the Barton Project]. Annual reports and final report to licence expiry/full surrender, for the period 13/6/1995 To 12/6/2000.
Calcrete sampling over aeromagnetic targets within the Fowler Shear Zone was undertaken to locate evidence of possible Cu-Au mineralisation, developed during emplacement of Hiltaba Suite granites south and south-west of Wynbring. Weakly anomalous Au...-
Dataset
Published: 16 Aug 1900
-
Regolith map of South Australia (1st edition).
This regolith map of South Australia consists of three main data components: regolith materials and landforms, regolith material induration (ferruginous, calcareous, siliceous, gypsiferous, mixed and undifferentiated) and surface lag. It was compiled...-
Map
Published: 01 Dec 1912
-
RB 2016/00012 Magmatic processes of the St Peter Suite, Gawler Craton: New U-Pb geochronological data and field observations.
The St Peter Suite has been previously interpreted to have formed in a subduction-related setting; however, there are limited data with which to assess this interpretation. This report comprises two parts. The first is a summary of Sensitive High...-
Document
Published: 01 Oct 2016
-
RB 2013/00013 Zircon and monazite geochronology via SHRIMP and LA-ICPMS for the northern Gawler Craton, from 2009 GOMA Drilling.
The 2010 GOMA basement drilling program formed part of a collaborative ARC Linkage Project LP0882000 " Unearthing the marginal terrains of the South Australian Craton: Keystone of Proterozoic Australia " arranged between Primary Industries and...-
Document
Published: 01 Dec 2013
-
RB 2015/00025 Zircon U-Pb geochronology from selected Paleoproterozoic igneous rocks of the Gawler Craton by laser ablation-inductively coupled plasma mass spectrometry.
This technical report presents laser ablation-inductively coupled plasma mass spectrometry (LA-ICPMS) U-Pb zircon geochronology data for 15 rock samples derived from locations spread across the Gawler Craton. The purpose of the subject dating project...-
Document
Published: 01 Sep 2015
-
RB 2007/00021 Compilation of SHRIMP U-Pb geochronological data for the Gawler Craton, South Australia, 2007.
This Report Book contains zircon U-Pb geochronological data obtained between December 2006 and June 2007, for rock samples derived from the Gawler Craton of South Australia. The geochronological study was undertaken as part of the National Geoscience...-
Document
Published: 01 Nov 2007
-
RB 2006/00020 Compilation of SHRIMP U-Pb geochronological data for the Gawler Craton, South Australia, 2006
This report book contains zircon - derived U-Pb geochronological data, which was obtained between January 2005 and April 2006, for basement rock samples taken from the Gawler Craton of South Australia. The data has been generated as part of the...-
Document
Published: 01 Nov 2006
-
EL 6604 Surrender Report to period ending 10/06/2024
During the reporting period to 10/06/2024, exploration activities completed by the company included a literature review, historic drill core sampling, a review of available geophysical data and a gravity survey. During the literature review company...-
Document
Published: 10 Jun 2024
- ZIP,
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-11 - Lambina Station, northern Gawler Craton, Proterozoic sediment-hosted stratiform base metal prospect. Drilling project final report.
A small licence area centred ~70 km east of Marla has been taken up to explore for possible economic buried sedex style base metal deposits or IOCG style mineralisation which may exist there, hosted by largely unknown Proterozoic basement rocks,...-
Document
Published: 20 Nov 1915
-
RB 2008/00003 The Corunna Conglomerate, Gawler Craton: a review of the sedimentology and new U-Pb zircon geochronology.
The Corunna Conglomerate is a sequence of unmetamorphosed fluvial to shallow marine sediments, comprising conglomerates, sandstones and siltstones, which were deposited in active fault grabens in the eastern Gawler Craton. It is found on the...-
Document
Published: 01 Apr 2008
-
Emmie Bluff IOCG Mineral System 3D Model (3D pdf version).
The eastern Gawler Craton hosts the giant Olympic Dam iron oxide - associated copper-gold (IOCG) deposit, as well as several other world class IOCG deposits (i.e. Prominent Hill and Carrapateena). The region is covered by a thick sequence of...-
Model
- PDF,
- ZIP
-
EL 6603 Surrender Report to period ending 10/06/2024
During the reporting period to 10/06/2024, exploration activities completed by the company included a literature review, historic drill core sampling, a review of available geophysical data and a gravity survey. During the literature review company...-
Document
Published: 30 Jun 2024
- PDF,
- ZIP
-
RB 2023/00045 Cobalt: Critical mineral potential of South Australia.
Critical minerals are a collection of metal and non-metal commodities considered essential for economic and industrial development, and for which there are significant concerns around future supply due to resource scarcity or geopolitical factors. The...-
Document
Published: 01 Jul 2024
-
RB 2011/00003 PACE Geochronology: Results of collaborative geochronology projects [performed during] 2009-2010.
This report book presents the results of seven geochronology research projects completed during 2009 and 2010 as a new part of the ongoing PACE Initiative geoscientific data gathering activity underwritten by the South Australian Government. It has...-
Document
Published: 01 Apr 2011
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017