-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnerships DPY9-43 - Brownlow and DPY9-47 - Bower. Drilling projects' joint interim and final reports.
Copper and gold mineralisation associated with felsic, intermediate and mafic igneous intrusive rocks which have intruded Adelaidean and Cambrian metasediments in the Nackara Arc region has been the target of exploratory drilling conducted with the...-
Document
-
Quondong. Progress reports and final report to licence expiry/full surrender, for the period 16/2/1979 to 15/2/1980. s and final reports to licence expiry for the period 16/2/1979 to 15/2/1980.
An open hole rotary mud drilling programme of 42 holes for 4939 m was used to evaluate the licence area for economic Tertiary fluvial sandstone - type uranium mineralisation, after previous and current explorers had identified buried uraniferous...-
Document
-
RB 74/00183 Re-assessment of aquifer data at Wanbi Research Station, with predicted effects of proposed withdrawals near Alawoona, Hd Mindarie section 32.
The Transmissivity of the Murray-Glenelg Group Limestone aquifer at Wanbi, 150km east of Adelaide, is 200 metres3/day/m. A specific yield of 2.5 x 10-3 can be used for predicting the maximum effects of withdrawals, but is not considered a reliable...-
Document
Published: 01 Jan 1974
-
RB 2003/00013 North-western Murray Basin geological synthesis, South Australia.
The Murray Basin is an intracratonic basin filled with Cainozoic fluvial to shallow marine sediments. Deposition in the Eocene and early Oligocene was characterised by floodplain and swamp deposits, emplaced with occasional interbeds of shelly clays...-
Document
Published: 01 Aug 2003
-
RB 2003/00009 Northern Murray Basin drilling and interpretations, 2001.
Stratigraphic drilling has been undertaken by PIRSA in the South Australian portion of the northern Murray Basin to investigate the stratigraphy and sedimentology of the Cainozoic sedimentary sequences, as well as the heavy mineral sand potential of...-
Document
Published: 01 Aug 2003
-
SAMDE IS S11 - Groundwater in the Murray Mallee, February 1991
There is no abstract created for this record-
Document
-
RB 2000/00038 Qualco Sunlands groundwater control scheme - Stage 1: Aquifer testing for inter-aquifer leakage.
Aquifer testing at two sites in the Qualco Sunlands Irrigation Area showed there is no detectable leakage between the Loxton Sands perched aquifer and the underlying Murray Group Limestone aquifer, provided that representative readings were obtained...-
Document
Published: 01 Sep 2000
-
RB 2000/00004 Mallee region groundwater modelling - Report no. 1.
A five-layer finite difference groundwater flow model (MODFLOW) was developed for the Mallee Region to determine the impacts of irrigation on water levels and salinities. The model was calibrated for steady-state conditions over the entire modelled...-
Document
Published: 01 Feb 2000
-
RB 2000/00037 Qualco Sunlands groundwater control scheme - Stage 2: QS9 drilling and well testing completion report.
The contract drilling of three production wells, three combined interflow/production wells, three interflow wells, one observation well and seven drainage wells was carried out by Thompson Drilling Company as part of Stage 2 of the Qualco Sunlands...-
Document
Published: 01 Sep 2000
-
SA/Vic Border Groundwater Review Committee - Five-year technical review, 1996 - 2000.
The Groundwater (Border Agreement) Act of 1985 provides the legislative framework for the joint management of the groundwater resources along the South Australia/Victoria State border. The Act established a 40 km wide Designated Area along the...-
Document
-
Marne River Catchment - Groundwater assessment.
The Marne River is a main tributary catchment for the River Murray, which generates ephemeral flows in wet years. Concerns have been expressed at the construction of large dams in the headwaters of the catchment, about their impacts on streamflow,...-
Document
-
Northwestern Murray Basin - stratigraphy, sedimentology and geomorphology.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Murray Basin Project. Joint annual reports, plus individual licence final reports at their respective full surrender, for the period 19/12/1997 to 30/6/2018.
Previous investigations of the Late Tertiary Murray Basin shallow marine littoral zone clastic sedimentary sequence (Loxton and Parilla sands) for heavy mineral sand (HM) placer accumulations have discovered numerous occurrences of economic to...-
Document
-
ExpNotes OLARY: Explanatory Notes OLARY
There is no abstract created for this record-
Document