-
Data release - as updated [made at SA Director of Mines' discretion] : Cockburn. Annual reports for the period 24/6/2009 to 23/6/2014.
An area centred approximately 70 km west of Broken Hill is being explored for possible economic buried Broken Hill type Pb-Ag-Zn mineralisation that may be hosted by metasediments of the Palaeoproterozoic Wilyama Supergroup, as well as for possible...-
Document
-
Kalabity. Annual reports and final report to licence expiry/full surrender, for the period 18/11/2000 to 28/3/2014.
An area situated ~100 km west of Broken Hill has been explored for buried base and precious metals epigenetic mineralisation that might have formed within Palaeoproterozoic meta-igneous and metasedimentary basement rocks of the north-eastern Olary...-
Document
-
Mingary (part of the Border JV Project). Third partial surrender report, for the period 21/6/2001 to 2/6/2015.
Continued exploration for possible economic buried silver-lead-zinc, copper-gold or gold only mineralisation which might have formed as primary epithermal/hydrothermal deposits hosted by Palaeoproterozoic basement, is primarily targeting interpreted...-
Document
-
RB 2009/00007 The Mingary 1:100 000 map area.
Geological mapping of the Mingary 1:100 000 map area was completed in 2006 as part of the Broken Hill Exploration Initiative (BHEI). The mapping project began in 1995, and concentrated on the mapping of lithologies using a slightly modified version of...-
Document
Published: 01 Apr 2009
-
Mutooroo. Annual reports and final report to licence surrender, for the period 27/7/1992 to 14/7/1999.
Gold and base metal exploration was centred around the old Mutooroo line of copper workings 15 km south-southwest of Cockburn. Work comprised an SP survey and soil, rock chip, float, shallow auger, BLEG and stream sediment sampling, the latter...-
Document
-
Mulyungarie (part of the Yarramba Joint Venture Project). Data release upon first partial relinquishment and in consequence of a transfer of licence ownership : progress and technical reports for the period 4/7/1978 to 2/5/1991. [ Index Part 2 of 2 ].
After the signing of a new joint venture agreement for the three Yarramba Project tenements (EL 1004 South Eagle, EL 1352 Strathearn and the subject EL 1060 Mulyungarie) in early 1986, the CSR-led partners began exploration for possible Olympic Dam -...-
Document
Published: 31 May 1991
-
Mutooroo and Duffields. Joint first annual report plus final report to licences' joint full surrender, for the period 1/8/1994 to 24/9/1996.
Exploration for stratiform/stratabound Broken Hill - type Pb-Zn mineralisation which may have formed in Palaeoproterozoic metasediments of the Mutooroo area, 70 km SW of Broken Hill, comprised stream sediment sampling, IP surveys, and aircore and RAB...-
Document
-
Mulyungarie. Data release at first partial surrender: annual reports for the period 1/12/2000 to 30/11/2004.
Exploration of an area of shallowly covered Curnamona Province metalliferous basement rocks abutting the South Australia / New South Wales border, approximately 80 km north-east of Olary, has addressed good potential for discovering a range of base...-
Document
Published: 01 Dec 1904