-
Wooltana. First partial relinquishment report for the period 19/9/2002 to 18/9/2004.
Two small peripheral areas of the subject licence have been relinquished owing to their perceived poor potential for containing economic palaeochannel uranium mineralisation within Tertiary sediments. The western area is seen as being almost devoid...-
Document
Published: 02 Mar 1905
-
Mount Yerila. First partial surrender report for the period 26/8/2002 to 25/8/2004.
Two peripheral areas of the subject licence have been relinquished owing to their perceived poor potential for containing economic palaeochannel uranium mineralisation within Tertiary sediments. Two rotary mud drillholes were drilled in the western...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-11, Lake Blanche region Quaternary palaeochannel / palaeolake margin calcrete - hosted or roll-front style uranium mineral prospects. Project final report.
Approved PACE project DPY2-11 was an attempt to find calcrete or roll-front type sedimentary uranium mineralisation in Quaternary fluvial channels that drain the northern and eastern margins of the uranium-enriched Mount Painter and Mount Babbage...-
Document
Published: 20 Sep 1906
-
Woolatchi Creek. Progress and annual reports for the period 20/2/80 to 11/4/83.
41 open-hole rotary drillholes (total 5999 metres) were drilled and geophysically logged to search for possible sedimentary uranium occurrences in the Early Cretaceous Parabarana Formation and in overlying altered Miocene sands, over an area of the...-
Document