-
RB 2016/00037 Vectorisation of residual gravity and TMI data in the northern Gawler Craton: implications for exploration targeting and GIS analysis.
Gravity and reduced-to-pole total magnetic intensity grids over the northern Gawler Craton have been vectorised, generating polygon datasets representing regions of locally anomalous gravity and magnetic intensity. Statistics from potential field...-
Document
Published: 01 Jul 2018
- PDF,
- ZIP
-
Data release [made at SA Director of Mines' discretion] : Algebuckina. Annual reports for the period 3/8/2004 to 2/8/2008.
An area surrounding the Algebuckina Inlier of the Proterozoic Peake and Denison Ranges, which is centred approximately 50 km south-east of Oodnadatta, is being explored for possible roll-front style sedimentary uranium deposits that may have formed...-
Document
Published: 20 Oct 2008
-
RB 2002/00028 Gawler Craton, 2002. State of play. [Notes to accompany viewing of the ancillary] Drill core display.
This geotechnical workshop of seminars and core displays, which was held over two days on 5-6 December 2002, aimed to highlight recent collaborative research between PIRSA [MER], Geoscience Australia and the South Australian mineral industry that has...-
Document
Published: 01 Dec 2002
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 2016
-
Data release : Mount Sarah, Alamilda Hill and Todmorden (the Mount Sarah Project). Annual reports and joint annual reports to the successive expiry/full surrender of ELs 6129 and 5634, for the overall period 23/6/2015 to 22/6/2020.
Three adjacent areas located in dissected hilly country 70-90 km to the north-west of Oodnadatta were successsively taken up under licence to cover a significant, 8 mGal regional gravity anomaly which could have potential for IOCG type basement-hosted...-
Document
Published: 24 Jun 2020
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-05 - Mount Sarah Project, Oodnadatta district, Proterozoic basement inferred epithermal/hydrothermal IOCG mineral prospect. Drilling final report.
A small licence area centred approximately 70 km north-northwest of Oodnadatta is being explored for possible economic buried IOCG type mineralisation that may have formed in the wholly concealed, almost unknown basement rocks there. Interest is...-
Document
Published: 28 Sep 2017
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Denison. Second annual report for the period 13/3/2016 to 12/3/2017.
During licence Year 2, work comprised: • providing ongoing land access notifications to relevant landholders and the Native Titleholders; • acquisition over the entire tenement in April 2016 of the second phase of a ground gravity survey, consisting...-
Document
Published: 12 Mar 2017
-
Anna Creek (the Peake and Denison Project). Annual reports to licence expiry/full surrender, for the period 25/10/2019 to 24/10/2021.
A large area centred ~15 km to the south-east of Algebuckina on the Oodnadatta Track has been explored for possible buried economic IOCG type basement-hosted mineralisation, that may have formed within Paleo- to Mesoproterozoic rocks like those...-
Document
Published: 15 Nov 2021
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 2007
-
Mount Charles (part of Peake and Denison JV Project). First partial surrender report for the period 1/6/1994 to 20/9/2006.
As part of a regional search for possible economic iron oxide - associated copper-gold deposits formed in Proterozoic basement rocks, regional gravity surveying at 1 km station spacings was performed across the joint venture's Peake and Denison area...-
Document
Published: 04 Dec 2006
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-04 - Woodmurra Project, Denison Inlier, Proterozoic metamorphosed volcanogenic basement stratiform/syngenetic Broken Hill type Pb-Zn-Ag prospects. Final report
An area lying ~70 km east and south-east of Oodnadatta is being explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which may be contained within strongly deformed and metamorphosed Palaeo- to...-
Document
Published: 31 Oct 2016
-
Data release [made at SA Director of Mines' discretion] : Mount Denison. Annual report for the period 13/3/2015 to 12/3/2019.
A small area centred ~80 km south-east of Oodnadatta is being explored for possible buried economic iron-oxide associated copper-gold-uranium (IOCGU) style mineralisation, as typified by the Olympic Dam and Prominent Hill deposits. The tenement was...-
Document
Published: 12 Mar 2016