-
1995 Moomba North Flank 3D Seismic Survey.
Santos Ltd as operator of PEL 5 and 6 in the Cooper Basin area of South Australia recorded the 1995 Barker Seismic Survey consisting of 3550kms of 2D data and two 3D programmes covering 173km2. Recording took place over 31 separate prospects plus the...-
Document
- PDF,
- ZIP
-
1998 Merrimelia-Innamincka 3D Extension Seismic Survey.
Santos Ltd as operator of PEL 5 and 6 in the Cooper Basin area of South Australia recorded the 1998 SA 98 Seismic Survey consisting of 350kms of 2D data and 3 3D programme covering 524km2. Recording took place over 7 separate prospects plus the...-
Document
- ZIP,
-
2016 Liberator 3D Seismic Survey.
Senex Energy Limited contracted Terrex Seismic to record the Liberator 3D Seismic Survey during October – November 2016. The primary objectives of the survey was to define the northern extent of the Snatcher Birkhead oil reservoir for future...-
Document
Published: 01 Jan 2016
- ZIP,
-
2015 Playford West 3D Seismic Survey.
Bridgeport Energy Ltd contracted Geokinetics (Australasia) Pty Ltd to record the Playford East 3D Seismic Survey during November – December 2015. The primary objective of the survey was to identify the extent of conventional oil plays within the...-
Document
- PDF,
- ZIP
-
1992 Lake Hope 3D Seismic Survey.
Comprises details of the operations, field acquisition, results and interpretation of the seismic survey. A total of 1763 km of Vibroseis reflection seismic was recorded. In addition, a number of surveys were carried out for development purposes...-
Document
Published: 01 Jan 1994
- PDF,
- ZIP
-
PACE Copper Gawler Craton Airborne Survey, Region 4A, data package.
During the period 19 January to 12 May 2017, parts of the OOLDEA, NULLARBOR, BARTON and FOWLER 1:250k map sheet areas were flown under contract to the SA Government and Geoscience Australia as part of the PACE Copper Gawler Craton Airborne Survey....-
Dataset
- PDF,
- ZIP
-
PACE Copper Gawler Craton Airborne Survey, Region 3B, data package.
During the period 4 March to 22 June 2017, most of the TORRENS 1:250k map sheet area was flown under contract to the SA Government and Geoscience Australia as part of the PACE Copper Gawler Craton Airborne Survey. The intent of this survey overall [it...-
Dataset
- ZIP,
-
2001 Greater Strzelecki 3D Seismic Survey.
Santos Ltd contractd WesternGeco to record the Greater Strzelecki 3d Seismic Survey during Feb-June 2001. This large irregular grid of 1034 sq kms covered over 20 oil and gas fields and tied in surveys previously recorded in 1997 namely the...-
Document
- ZIP,
-
2011 Flax-Juniper 3D Seismic Survey.
Acer Energy (formerly Innamincka Petroleum) licence holders of PEL 103 contracted Trace Energy Services to record the Flax-Juniper 3D Seismic survey during July to August 2011. This survey was designed to optimise seismic data quality over the...-
Document
- ZIP,
-
2012 Nunga Mia 3D Seismic Survey.
Beach Energy, licence holders of PEL 186 contracted Trace Energy Services to record the Nunga Mia 3D Seismic survey during April 2012. The primary objective of this survey was to define leads in the Robe Trough area of the Otway Basin with a...-
Document
- ZIP,
-
2001 Caladan-Daralingie 3D Seismic Survey.
Santos Ltd contracted WesternGeco to record the Caladan-Darlingie 3D Seismic Survey covering some 34 Production Tenements in the western portion of the Cooper Basin during June and September 2001. A combination of receiver lines spaced 400m apart and...-
Document
- PDF,
- ZIP
-
2005 Mirage 3D Seismic Survey.
Victoria Petroleum Ltd contracted Terrex Seismic services to record the 2005 Mirage 3D Seismic Survey during September 2005. This survey was acquired for the delineation of the Mirage and Ventura structure and other potential structures following the...-
Document
- ZIP,
-
2003 Christies 3D Seismic Survey.
Beach Petroleum N/L contracted Trace Energy to record the 2003 Christies 3D Seismic Survey during October 2003. This survey was designed to enable accurate structural and stratigraphic mapping of the Hutton and Birkhead oil pool discovered in...-
Document
- ZIP,
-
2006 Neritus 3D Seismic Survey.
Beach Petroleum Ltd contracted Terrex Seismic Services to record the 2006 Neritus 3D Seismic Survey during November 2006 until January 2007 in PEL 92. The focus of the survey was to mature to prospect status numerous leads in the licence areas and to...-
Document
- ZIP,
-
2002 Gidgealpa 3D Seismic Survey.
Santos Ltd contracted WesternGeco to record the 2002 Gidgealpa 3D Seismic Survey during March 2002. This grid of 198.7 sq kms was designed to cover 8 existing production licences and also the previously recorded 1992 Gidgealpa Unit 3D Seismic Survey....-
Document
- ZIP,
-
2018 Wingman-Jasmine 3D Seismic Survey Merge Reprocessing.
Terra Nova Energy Ltd contracted Earth Signal Processing Ltd to re-process the Wingman-Jasmine 3D Merge. The Wingman 3D Seismic Survey was recorded in June-July 2013, while the Jasmine 3D Seismic Survey was recorded in March 2015. Portions of each 3D...-
Document
Published: 01 Jan 2018
- ZIP,
-
1996 Reg Sprigg 3D Seismic Survey.
Santos Ltd as operator of PEL 5 and 6 in the Cooper Basin area of South Australia recorded the 1996 Sprigg Seismic Survey consisting of 3576kms of 2D data and one 3D programme covering 77km2. Recording took place over 22 separate prospects plus the...-
Document
- PDF,
- ZIP
-
1998 Barina-Farina 3D Seismic Survey.
Santos Ltd as operator of PEL 5 and 6 in the Cooper Basin area of South Australia recorded the 1998 SA 98 Seismic Survey consisting of 350kms of 2D data and 3 3D programme covering 524km2. Recording took place over 7 separate prospects plus the...-
Document
- ZIP,
-
2018 Westeros 3D Seismic Survey.
Senex Energy Limited contracted Terrex Seismic Pty Ltd to record the 2018 Westeros 3D Seismic Survey, acquisition occurred between 14th March and 5th April 2019. The primary objective of the survey was to improve the structural certainty at target...-
Document
Published: 01 Jan 2018
- ZIP
-
2011 Flax-Juniper 3D Seismic Survey Reprocessing.
Acer Energy contracted CGG to re-process approximately 140 square kilometres from the 2011 Flax-Juniper 3D Seismic Survey. The processing took place at CGG's processing centres in Perth/Singapore between April and July 2011. The primary aim of the...-
Document
Published: 01 Jan 2011
- ZIP,