-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017
-
RB 2018/00010 Characterising and mapping alteration in the Punt Hill region - a data integration project.
South Australia’s Olympic Cu-Au Province hosts some of the world’s great iron oxide copper gold (IOCG) deposits, such as Olympic Dam, Prominent Hill and Carrapateena. The same causative thermal event resulted in variants of this deposit class being...-
Document
Published: 01 May 2018
- ZIP,
-
RB 2018/00001 Regolith hand specimen atlas for South Australia
This regolith material hand specimen atlas displays 246 images of 212 regolith samples which have been collected over the last 30 years by the authors, present and past Geological Survey of South Australia (GSSA) staff and members of the Cooperative...-
Document
Published: 01 May 2018
-
IS HRE001 Licence holders in South Australia
List of licence holders under the Hydrogen and Renewable Energy Act 2023. Contains access to the licence register and company contacts.-
Document
Published: 12 Jun 2025
-
Form 16A Register an operator appointment
This form is used to apply to register an operator appointment on the Mining Register.-
Document
Published: 12 Jun 2025
-
Form 16B Cessation of operator
This form is used to cease an operator appointment arrangement.-
Document
Published: 12 Jun 2025
-
ERG 017 Preparation of an activity notification
The Energy Resources Act 2000 (ER Act) licensing and approvals process consists of three stages; licensing, environmental assessment and approval of environmental objectives, and activity notification and approval. Under stage three, licensees...-
Document
Published: 25 May 2025
-
Cooke Plains. First partial surrender report, for the period 13/12/2010 to 12/12/2012.
71 square km or ~52.6% of the former area of EL 4633 have been relinquished, as they are now viewed as less viable places in which to attempt commercial solar salt production. Exploration activities undertaken during the reporting period, with...-
Document
-
A new geological map of Hallett Cove.
Hallett Cove is one of South Australia’s foremost natural science treasures. Exposed examples for prime geological concepts of superposition of strata, depositional unconformities (representing time breaks), and folding and faulting of sedimentary...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-63 - Gawler Iron Project, Mount Christie district - Archaean BIF hosted stratabound iron ore prospects. Drilling project final report.
The Gawler Iron Project is situated approximately 25 km north of the Trans-Australian Railway and 200 km south-west of Coober Pedy, along the western margin of the Gawler Craton in South Australia. The project area formerly had not been systematically...-
Document
Published: 30 Jan 1912
-
Form 16C Agent appointment or cessation
This form is used to apply to the Mining Registrar to register an arrangement that appoints or ceases to appoint an agent related to a mineral tenement.-
Document
Published: 12 Jun 2025
-
Application for joint reporting
There is no abstract for this document.-
Document
Published: 10 Apr 2025
-
Yudnamutana. Progress reports to licence expiry/full surrender, for the period 1/11/1974 to 31/10/1976.
Ongoing exploration for economic buried stratiform copper mineralisation within a small area located 97 km east of Lyndhurst under renewed tenure has consisted of detailed, 1:1000 scale geological mapping and surface geochemical sampling, plus...-
Document
Published: 20 May 1976
-
IS HRE002 Approval pathways for standalone BESS – transitioning and new projects
This brochure provides an overview of the three licensing and approval pathways provided for battery energy storage systems under the Hydrogen and Renewable Energy Act 2023.-
Document
Published: 28 Aug 2024
-
HandBk 004 - Some Semi-Precious and Ornamental Stones of South Australia. Barnes, L.C., et al. 1980 Australia. (reprinted version)
This handbook is a selection of shortened reports by geologists of the South Australian Department of Mines and Energy dealing with some of the semiprecious and ornamental stones in this State. It is not intended to be a comprehensive review of these...-
Document
-
Burra Project licence group. Data release made in lieu of submitting partial surrender reports for ELs 6102, 6103, 6158, 6305 and 6306 : joint annual reports for the period 25/1/2018 to 2/12/2020 plus initial annual annual report.
To date exploration in the Burra region of the Adelaide Geosyncline has focussed on historic copper-gold oxide workings, with the aim of delineating further mineralisation along strike, or sulphide mineralisation at depth. Lately however, rather than...-
Document
Published: 04 Feb 1921
-
ExpNotes OOLDEA: Explanatory Notes OOLDEA, SH 52-12.
There is no abstract created for this record.-
Document
-
ExpNotes WINTINNA: Explanatory Notes WINTINNA, SG 53-14.
A new generation, first edition WINTINNA 1:250 000 scale geological map and explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's geological mapping program undertaken in the...-
Document
-
ExpNotes CALLABONNA: Explanatory Notes CALLABONNA, SH 54-06.
There is no abstract created for this record.-
Document
-
ExpNotes CURDIMURKA: Explanatory Notes CURDIMURKA, SH 53-08.
There is no abstract created for this record.-
Document