-
Safari, Lake Woorong, Leonard Rise, Thunderstorm Creek and Brumby Creek areas (Coober Pedy Ridge Project). Quarterly and six-monthly progress, plus annual and final, joint activity reports for the period 22/4/1991 to 22/3/2000.
The Coober Pedy Ridge / Mount Woods Inlier project investigated a 170 km long east-west belt of medium to high grade Proterozoic metamophics and syn- and post tectonic granites, centred 25 km south of Coober Pedy, for Broken Hill type stratiform...-
Document
-
Tarcoola - Kingoonya (Glenloth) areas. Joint annual reports, and first partial relinquishment report, for the period 4/3/1993 to 24/5/2001.
Exploration for Archaean lode-style gold and Hiltaba Suite granite-related hydrothermal Cu-Au in two licence sub-areas near Tarcoola targeted Archaean greenstone lithologies interpreted from aeromagnetic data, Mesoproterozoic intrusive-associated...-
Document
-
Summary report on exploration of the Kenella Rock[s] area, SML 436, during the period 15/9/1970 to 15/12/1971.
There is no abstract created for this record-
Document
Published: 05 Dec 1971
-
Heartbreak north and south [Talia and Jennet] areas. Progress reports for the periods 30/8/1993 to 29/8/1998, and 26/10/1998 to 25/4/2001.
Archaean to Proterozoic ultramafic igneous intrusions and granite masses associated with the Yarlbrinda Shear Zone, which are interpreted as being potential hosts for gold, nickel, chromium and platinum group elements, were the targets of exploration...-
Document
Published: 03 Nov 1900
-
Tarcoola. Data release made in lieu of a 25% first partial relinquishment at licence renewal: [Part 1 of 2] progress reports for the period 7/6/1978 to 19/4/1984.
In 1978 exploratory rotary drilling (11 holes, total 629 m) for inferred sediment-hosted roll-front uranium orebodies buried beneath salt lake topographic depressions east of Tarcoola intersected low levels of uranium (max 14 ppm) at fresh water /...-
Document
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-18 - Phoenix Copper Limited Yorke Peninsula Project. Drilling project final report.
Phoenix Copper is exploring tenements which cover an area of approximately 802 square km on the west coast of the Yorke Peninsula, the company's prime objective being to discover an economic iron oxide - associated copper-gold-uranium (IOCGU) deposit...-
Document
Published: 13 Nov 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty [Station] and Yeltacowie (the Punt Hill IOCG Project). Joint annual reports for the period 29/11/2009 to 6/1/2012.
Two adjoining licence areas located in the country east of Pernatty Lagoon that lies between 80 and 180 km north of Port Augusta are being explored by Monax Mining Limited (Monax) for economic Proterozoic basement-hosted Iron-Oxide associated...-
Document
Published: 21 Jun 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Pondooma / Ironstone Hut (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 3/12/2002 to 24/9/2015.
An area originally granted as Exploration Licence 3048 Pondooma, which consisted of two separate sub-blocks centred ~60 km south-west of Whyalla, was applied for to cover a poorly exposed belt of banded iron formation (BIF) strata identified on...-
Document
-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 1912
-
Data release [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports to licence expiry/renewal, for the period 17/2/2005 to 16/2/2010.
Tasman Resources is exploring an area that is centred about 78 km north-west of Tarcoola for possible economic buried occurrences of sedimentary roll front style uranium in Tertiary palaeochannels and nickel mineralisation in Archaean -...-
Document
Published: 19 Apr 1910
-
Data release - as updated : Tallaringa North and Tallaringa South (part of the Coober Pedy Project). Joint annual reports to licences' joint expiry/full surrender, for the period 24/5/2012 to 23/5/2019.
Three areas centred ~120 km west south-west of Coober Pedy and lying in the northern part of the Gawler Craton, one located within the Mabel Creek Domain and the other two being adjacent and further to the south, within the Christie Domain next to a...-
Document
Published: 19 Jun 1919
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-34 - Coober Pedy district, Mabel Creek High, Cyclops geophysically anomalous Mesoproterozoic basement IOCG type Au & base metal prospect. Drilling final report
The Cyclops prospect is located approximately 145 km west-southwest of Coober Pedy and ~58 km north of the Challenger mine, along the common boundary between ELs 4891 and 4892, two exploration tenements held by Teck Australia Pty Ltd which were...-
Document
Published: 02 Oct 1915
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
EL 5837, EL 5838, EL 5839, EL 5840, EL 5841, EL 5842 and EL 5843 - Coompana Project. Joint annual technical report for the period 31/8/2016 to 30/8/2018.
Exploration licences 5837, 5838, 5839, 5840, 5841, 5842 and 5843 collectively known as the “Coompana Project” cover an area of 6572 square km south of the Trans Australian Railway on the western margin of the Gawler Craton, on the South Australia –...-
Document
Published: 07 Sep 1918
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1998 to 17/10/2008 [ Index Part 2 of 4 ].
Stuart Metals is primarily exploring EL 1946 for stratiform copper mineralisation of the various styles known to be present in the Mount Gunson district. In addition, the company regards the largely unknown Mesoproterozoic basement to have strong...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-05 - Mount Sarah Project, Oodnadatta district, Proterozoic basement inferred epithermal/hydrothermal IOCG mineral prospect. Drilling final report.
A small licence area centred approximately 70 km north-northwest of Oodnadatta is being explored for possible economic buried IOCG type mineralisation that may have formed in the wholly concealed, almost unknown basement rocks there. Interest is...-
Document
Published: 28 Sep 1917