-
Artipena. First progress/final report to licence expiry/renewal, for the period 21/5/1970 to 20/5/1971.
Reconnaisance and detailed geochemical surveys, plus limited diamond drilling at the Baratta mine (2 holes for 480 feet), failed to find any extensions to known but worked-out near surface Cu-Pb-Zn lodes. It was concluded that only a small area...-
Document
-
Angaston - Sedan Hill area. Progress reports and final report to licence expiry/full surrender, for the period 18/11/1975 to 17/11/1976.
Regional stream sediment and rock chip geochemical sampling of an area extending from 15 km north-east to south-east of Angaston was undertaken to search primarily for stratabound Mississippi Valley style Pb-Zn mineralisation in lower Cambrian Hawker...-
Document
-
Progress reports on investigations of mineral claims, Tumby Bay area, for the period March-July 1970.
A brief examination of six old copper prospects near Tumby Bay has shown that three are worthy of further detailed exploration. All three were feasible mining propositions around the turn of the century. They are aligned within Archaean...-
Document
Published: 09 Jul 1970
-
Magnesite in the Mount Fitton area, South Australia.
Over the past three years crystalline magnesite has been found in the Mount Fitton area in many places, in a 12 miles long belt which follows the lower edge of a dolomite mass of Late Proterozoic age. The Mount Livingston deposit with indicated...-
Document
Published: 17 Apr 1967
-
RB 2011/00008 South Australian mineral resource[s] production statistics for the six month [period] ended 31st December 2010.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 31 December 2010, and compares the data with that returned for the previous six...-
Document
Published: 20 May 2011
-
RB 2008/00016 Review of the Burra Mine Project, 1980-2008 - a progress report.
The Burra (Burra) Mine, situated 150 km north of Adelaide within the Adelaide Geosyncline, produced 2.7 million tonnes of copper ore in two major mining phases - 1845-1877 and 1970-1981. The first phase was initially progressed by underground...-
Document
Published: 01 Jan 2009
-
RB 2008/00015 South Australian mineral resource production statistics for the 6 month [period] ended [30] June 2008.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2008, and compares the data with that returned for the previous six...-
Document
Published: 19 May 2008
-
RB 2008/00005 South Australian mineral resource production statistics for the 6 month [period] ended [31] December 2007.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2008, and compares the data with that returned for the previous six...-
Document
Published: 01 Jan 2008
-
RB 2009/00009 South Australian mineral resource production statistics for the 6 month [period] ended [31] December 2008.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 31 December 2008, and compares the data with that returned for the previous six...-
Document
Published: 11 May 2009
-
RB 2006/00022 South Australian mineral resource production statistics for the 6 month ended June 2006
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2006, and compares the data with that returned for the previous six...-
Document
Published: 01 Dec 2006
-
RB 2016/00006 South Australian mineral resources production statistics for the six month ending 31 December 2015.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 31 December 2015, and compares the data with that returned for the previous six...-
Document
Published: 01 Dec 2015
-
RB 2015/00020 South Australian mineral resources production statistics for the six month ending 31 December 2014.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 31 December 2014, and compares the data with that returned for the previous six...-
Document
Published: 01 Dec 2014
-
RB 2016/00003 South Australian mineral resource production statistics for the six month ended 30 June 2015.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2015, and compares the data with that returned for the previous six...-
Document
Published: 01 Mar 2016
-
RB 2016/00033 South Australian mineral resource production statistics for the six month ended 30 June 2016.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2016, and compares the data with that returned for the previous six...-
Document
Published: 01 Dec 2016
-
ExpNotes MARREE: Explanatory Notes MARREE, SH 54-05.
A new generation, second edition MARREE 1:250 000 scale geological map and its explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's latest geological mapping program (1993 to...-
Document
-
Burra mine 3D model. Data package.
The SADME 1980-1981 Burra mine field mapping project was undertaken at short notice, in order to collect unique geological data and location survey information from the lower benches of the then actively worked open pit mine, before the newly exposed...-
Model
Published: 18 Sep 2012
- PDF,
- ZIP
-
Data release - as updated [made at SA Director of Mines’ discretion] : Yadlakina Hut. Annual reports for the period 20/9/2010 to 19/9/2018.
An area of outcropping magnesite-bearing metasediments extending from 10 km west of to 55 km north-west of Leigh Creek township is being explored to re-assess its commercial potential for magnesia and magnesium metal production, following other...-
Document
Published: 09 Oct 2018
-
Burra mine 3D model (3D pdf version).
The Burra mine 3D model was constructed using a georeferenced version of the original hand-drafted base map, which included elevation data points surveyed during the final phase of mining. These elevation locations and associated height data were...-
Model
Published: 27 Jan 2009
- PDF,
- ZIP
-
Data release - as updated [made at SA Director of Mines' discretion] : Kapunda (latterly part of the Adelaide Hills Project). Annual reports for the period 12/3/2007 to 27/4/2013.
During 2007, Luzenac Australia Pty Ltd (Luzenac), a wholly owned subsidiary of Rio Tinto Pty Limited, entered into an Option Agreement with Flinders Diamonds to explore for commercial grade talc deposits over part of its EL 3064 situated in the...-
Document
Published: 06 May 2013
-
Mineral Resource Potential Map Series - Adelaide.
There is no abstract created for this record-
Map
Published: 01 Jun 2015