-
Lake Coonee (part of the Lake Frome Project). First partial surrender report, for the period 16/4/2009 to 15/4/2012.
A search for possible economic sandstone-hosted uranium mineralisation formed within Tertiary and perhaps also the underlying Mesozoic strata in the Lake Coonee area, located in the Strzelecki Desert 140 km north-west of Broken Hill, has proceeded...-
Document
Published: 11 Apr 2013
-
Round Hill and Nillinghoo. Annual reports, joint annual reports and final report to licences' joint surrender, for the period 30/9/2009 to 19/2/2014.
Afmeco Mining and Exploration Pty Ltd is exploring for possible economic sedimentary uranium mineralisation which may have formed within permeable sand units of the Tertiary Callabonna Sub-basin. The subject ELs 4317 and 4318 are part of 7-licence...-
Document
Published: 24 Nov 2011
-
Data release - as updated [made at SA Director of Mines’ discretion] : North Mulga. Annual reports to licence expiry/renewal, for the period 10/7/1997 to 23/9/2012.
Exploration for possible economic buried sedimentary uranium mineralisation within a large portion of the north-western Frome Embayment located immediately east and north-east of the Beverley uranium deposit and covering the northern end of the...-
Document
Published: 05 Nov 2012
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Frome North. Annual reports for the period 19/8/2013 to 18/8/2016.
An area in the south-west of the Frome Embayment, that is centred ~80 km south-southeast of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium...-
Document
Published: 08 Sep 2016
-
Data release [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports and technical reports to licence expiry/renewal, for the period 29/8/1992 to 28/9/2009.
In the reporting period to 30th June 1995 for Exploration Licence 1944, Heathgate Pty Ltd completed no fieldwork, however geological evaluation work was undertaken. This work consisted of laboratory testing of drill core from a 1991 drilling program...-
Document
Published: 18 Jun 2010
-
Lake Frome Project. Individual licence annual reports, joint annual reports and final reports to various constituent licences' joint full surrenders, for the period 16/4/2009 to 5/6/2015.
An area centred ~36 km west of Quinyambie Homestead has been explored for possible buried economic sedimentary uranium mineralisation of palaeochannel hosted roll-front style that may have formed in relatively more distal Tertiary basinal sediments,...-
Document
Published: 30 Mar 2015