Skip to content
Search Home
SARIG catalogue
  • HomeHome
  • Search Records
  • FAQs
  • Vocabularies
  • SARIG map SARIG map
  1. Datasets

Datasets

The mesac Open Data Portal datasets contain detailed records of seismic surveys and geochemical data, and they are made available here to industry, researchers and the public.
FILTER RESULTS
RESET
draw to search by area BY DRAWN AREA
RESET
Location SA

TYPE OF RECORD

  • document - (234)
  • map - (42)
  • model - (12)
  • dataset - (2)

TOPIC

  • Geoscientific Information - (290)

CATEGORY TYPE

  • Earth Sciences - (290)
    • Geology - (226)
      • Resource Geology - (106)
        • Mineral Resource Geology - (108)
        • Quarry And Extractive Resource Geology - (61)
        • Petroleum Geology - (3)
      • Regional Geology - (95)
      • Stratigraphy - (93)
      • Sedimentology - (82)
      • Mineral System Geology - (77)
      • Surface Geology - (67)
      • Historical Geology - (65)
      • Petrology - (49)
        • Igneous And Metamorphic Petrology - (8)
        • Sedimentary Petrology - (1)
      • Basement Geology - (45)
      • Mineralogy And Crystallography - (30)
      • Geochronology - (27)
      • Marine Geoscience - (24)
      • Basin Analysis - (22)
      • Paleontology - (9)
        • Palynology - (1)
      • Volcanology - (7)
      • Petroleum System Geology - (6)
      • Sedimentary Geology - (2)
      • Extraterrestrial Geology - (1)
    • Physical Geography - (208)
      • Hydrogeology - (118)
      • Surfacewater Hydrology - (114)
      • Quaternary Environments - (63)
      • Surface Processes - (48)
      • Geomorphology And Regolith And Landscape Evolution - (40)
      • Paleoclimatology - (11)
      • Natural Hazards - (8)
      • Glaciology - (6)
    • Geochemistry - (153)
      • Exploration Geochemistry - (80)
      • Hydrogeochemistry - (71)
      • Isotope Geochemistry - (21)
      • Biogeochemistry - (1)
    • Geophysics - (115)
      • Seismology And Seismic Exploration - (34)
      • Electrical And Electromagnetic Methods In Geophysics - (32)
      • Magnetics - (25)
      • Gravity - (24)
      • Radiometrics - (11)
      • Petrophysics - (10)
  • Built Environment And Design - (285)
    • Urban And Regional Planning - (246)
      • Land Use And Environmental Planning - (290)
  • Engineering - (241)
    • Geomatic Engineering - (157)
      • Geospatial Information Systems - (53)
      • Photogrammetry And Remote Sensing - (10)
      • Remote Sensing - (9)
      • Cartography - (3)
    • Resources Engineering - (155)
      • Drilling Engineering - (120)
      • Mining Engineering - (61)
      • Mineral Processing/Beneficiation - (18)
      • Petroleum And Reservoir Engineering - (18)
      • Geomechanics And Resources Geotechnical Engineering - (13)
      • Pyrometallurgy - (3)
      • Electrometallurgy - (1)
      • Hydrometallurgy - (1)
    • Civil Engineering - (117)
    • Environemental Engineering - (11)
    • Chemical Engineering - (3)
  • Environmental Sciences - (225)
    • Environmental Science And Management - (204)
      • Natural Resource Management - (88)
      • Environmental Management - (83)
      • Environmental Monitoring - (74)
      • Environmental Impact Assessment - (18)
    • Soil Science - (128)
      • Soil Chemistry - (12)
      • Soil Physics - (2)
  • Information And Computing Sciences - (152)
    • Artificial Intelligence And Image Processing - (35)
      • Simulation And Modelling - (14)
      • Expert Systems - (13)
      • Image Processing - (5)
    • Computation Theory And Mathematics - (29)
      • Numerical Computation - (1)
  • Policy And Administration - (119)
  • Energy - (99)
    • Energy Exploration - (82)
    • Preparation And Production Of Energy Sources - (17)
    • Energy Storage, Distribution And Supply - (13)
    • Mining And Extraction Of Energy Resources - (11)
    • Environmentally Sustainable Mineral Resource Activities - (3)
    • Renewable Energy - (2)
    • Environmentally Sustainable Energy Activities - (1)
  • Mineral Resources (Excl. Energy Resources) - (89)
    • Mineral Exploration - (139)
    • Primary Mining And Extraction Of Mineral Resources - (123)
    • First Stage Treatment Of Ores And Minerals - (2)
  • Cultural Understanding - (28)
  • Biological Sciences - (27)
    • Ecology - (30)
  • History And Archaeology - (20)
    • Conserving Aboriginal And Torres Strait Islander Heritage - (19)
    • Conserving Natural Heritage - (14)
    • Archaeology - (11)

DOCUMENT TYPE

  • Departmental Publication - (194)
    • Hydrogeological Publication - (83)
    • Other - (47)
    • Geological Survey Geoscience Publication - (44)
    • Closed Series - (9)
      • Special Publication - (6)
      • Handbook - (2)
      • Report of Investigation - (1)
    • Engineering Geology Publication - (5)
    • Energy Geoscience - (3)
    • MESA Journal - (2)
    • Annual Report - (1)
  • Mineral Company Report - (27)
    • Mineral Exploration - (23)
    • Mining Environmental Program - (2)
    • Mining Operation Compliance - (1)
    • Mining Operation Proposal - (1)
  • Geophysical Report - (7)
    • Final - (5)
    • Seismic Report - (2)
      • Operations - (2)
  • Energy Company Report - (3)
    • Annual licence or technical report - (3)

COMMODITY

  • industrial material - (69)
  • copper - (44)
  • precious metal - (29)
  • gold - (27)
  • limestone - (26)
  • sandstone - (26)
  • zinc - (19)
  • carbonaceous material - (18)
  • salt - (18)
  • lead - (17)
  • gypsum - (12)
  • Shale - (12)
  • Critical minerals - (10)
  • granite - (10)
  • marble - (10)
  • silver - (10)
  • uranium - (9)
  • baryte - (8)
  • coal - (8)
  • talc - (7)

GEOLOGICAL PROVINCE

  • Adelaide Geosyncline - (70)
  • Murray Basin - (36)
  • Gawler Craton - (23)
  • St Vincent Basin - (20)
  • Kanmantoo Trough - (14)
  • Eromanga Basin - (12)
  • Otway Basin - (12)
  • Delamerian Orogen - (11)
  • Torrens Basin - (11)
  • Arrowie Basin - (9)
  • Curnamona Province - (8)
  • Mount Painter Inlier - (7)
  • Olympic Domain - (7)
  • Torrens Hinge Zone - (7)
  • Lake Eyre Basin - (6)
  • Mount Babbage Inlier - (6)
  • Spencer Domain - (6)
  • Cooper Basin - (5)
  • Padthaway Ridge - (5)
  • Arckaringa Basin - (4)

STRATIGRAPHY

  • Burra Group - (14)
  • Saint Kilda Formation - (10)
  • Tapley Hill Formation - (10)
  • Bridgewater Formation - (8)
  • Gambier Limestone - (8)
  • Murray Group - (8)
  • Umberatana Group - (8)
  • Hindmarsh Clay - (7)
  • Pooraka Formation - (7)
  • Port Willunga Formation - (7)
  • Kanmantoo Group - (6)
  • North Maslin Sand - (6)
  • Padthaway Formation - (6)
  • Saddleworth Formation - (6)
  • Skillogalee Dolomite - (6)
  • Bookpurnong Formation - (5)
  • Hiltaba Suite - (5)
  • Renmark Group - (5)
  • Wilpena Group - (5)
  • Abc Range Quartzite - (4)

FORMAT

  • PDF - (270)
  • ZIP - (15)

UPDATE FREQUENCY

There are no UPDATE FREQUENCY that match this search

PUBLICATION DATE

Specific date: 1980, 20/04/1980, 04/1980

Date range: 1980-2022, 04/1980-08/1990

close
Search records
ADVANCED KEYWORD SEARCH
Include the following keywords:

290 records found

Category type: Land Use And Environmental Planning

Filter Results
  • Price. Progress and final reports to licence expiry/full surrender for the period 16/2/1983 to 15/2/1984.

    Diary of events on licensee's efforts towards locating a suitable area near Price for extending its existing salt production works condensing pans. Contains maps of three mineral claims applied for on 26/1/1984 that cover the area intended for use.
      Document Published: 23 May 1984
    • PDF
  • Review of unallotted Crown lands on Eyre Peninsula. 31st August 1984.

    Of 691 000 ha. of Crown Land, 18 000 ha. could be profitably developed by adjoining landowners. High environmental significance has been established for land with agricultural potential in the Hundreds of Peella and Corrobinnie and detailed...
      Document Published: 01 Jan 1984
    • PDF
  • Evaluation of long-term development options for metropolitan Adelaide. An examination of the opportunities for and constraints to future urban development. A discussion paper.

    Examines issues and opportunities for urban growth beyond 1997 when it will probably be necessary to promote new development outside the existing urban boundary. Concludes that urban consolidation would be the most cost effective way to cater for...
      Document
    • PDF
  • Proposed Victoria to South Australia 275 kV transmission line. Landscape assessment.

    Proposal will allow extension of the Victoria / New South Wales interconnected transmission system to SA and involves construction of transmission line from a terminal station near Heywood (Vic) to a location near Penola. The visual impact of several...
      Document
    • PDF
  • Jane Eliza Landing Marina estate development. Draft environmental impact statement.

    Base data identifying the major environmental, social and economic issues pertaining to the establishment of houseboat marina, residential estate and tourist / commercial facility area adjacent to the River Murray and Ral Ral Creek at Renmark. It...
      Document
    • PDF
  • Tungkillo to Tailem Bend. Proposed 275 kV transmission line. Draft environmental impact statement.

    Transmission line will provide for an increasing demand for power in the South-East and interconnect with the Victorian and NSW electrical systems in a power sharing arrangement. Considers environmental impact along 3 alternative corridors.
      Document Published: 01 Jan 1986
    • PDF
  • Assessment of the Environmental Impact Statement prepared for Cape Investments Pty Ltd on the residential land division at Thompson Beach pursuant to section 49, the Planning Act, 1982.

    Concludes that the project conflicts with planning and coastal management policies and that it would result in significant impact to the biological system of the area.
      Document
    • PDF
  • Seaford structure planning report.

    Structure plan, staging development plan and guidelines for urban expansion. Considers Maslin Beach industrial sand mining.
      Document
    • PDF
  • Proposed copper mining project. Statement of environmental factors.

    Drilling near Leigh Creek had delineated sufficient reserves of oxidized copper ore, for 5 years chemical operations at Burra and Port Adelaide, in 7 separate deposits in 3 areas, namely : 1) Mountain of Light : Paltridge North (formerly Mountain of...
      Document
    • PDF
  • Nunnyah Conservation Reserve management plan. Draft report.

    Reviews cultural and natural history and environmental impact. Majority of land is in an undisturbed natural condition and could be rehabilitated to `wilderness condition in 20-30 years.
      Document
    • PDF
  • Draft environmental impact statement for the Mount Lofty Project.

    The project proposal consists of : - tourism and communications facilities on Summit Road, Mount Lofty, - improvements to the Native Fauna Centre in Cleland Conservation Park, and - a 3.2 km cable-car linking these and a base station located on the...
      Document
  • Proposed Tungkillo to Cherry Gardens 275 kV transmission project. Draft environmental impact statement.

    Proposal to complete a transmission connection from generating plant at Port Augusta to Adelaide metropolitan area. Discusses impacts on biophysical, social and economic environments, land use, tourism, heritage, aboriginal archaeological sites, water...
      Document
    • PDF
  • Southern Cross Refinery. Supplement to the draft Environmental Impact Statement.

    Effects of proposal for petrochemical complex at Port Bonython are summarised with regard to major issues raised by Santos Ltd, Mr. A J A Scott, Corporation of the City of Whyalla, Environmental Protection Council and government departments. There...
      Document
    • PDF
  • Yorke Coast protection district management plan. Draft for public exhibition.

    Aim is environmental protection and restoration of coastal features and development and management of its facilities.
      Document
    • PDF
  • Calpatanna Waterhole Conservation Park, Eyre Peninsula, South Australia. Draft management plan.

    There is no abstract created for this record
      Document
    • PDF
  • Port Broughton Beta-carotene Project. Pilot plant proposal.

    Construction of saline lagoon on supratidal mud and samphire flats is proposed to test suitability of area for growth and harvesting of the marine algae Dunaliella salina and extraction of beta-carotene, oil and glycerol. Possible discharge of waste...
      Document Published: 01 Jan 1984
    • PDF
  • Simpson Desert Conservation Park. Draft management plan.

    Proposals to minimise land use conflict and hazards to travellers. Summarises natural resources of desert region.
      Document
    • PDF
  • Geographic appraisal of Hallett Cove and environs, South Australia.

    The geological, geomorphic, topographic, climatic, floral, soil types, economic and cultural aspects and broad environmental zones were documented. Areas of scientific, educational, recreational, and aesthetic value for preservation, public use, and /...
      Document
    • PDF
  • 1992 seismic survey, Crater, final report.

    AIM: Previous semi-detailed seismic mapping of the licence area by the former PELs 5 and 6 licensees had identified several prospects and leads worthy of follow-up detailed seismic work. 7 new lines of infill seismic totalling 60 line km were...
      Document
    • PDF
  • Harbour investigations Gulf of St Vincent areas A and B.

    Investigated bottom and shallow sub - bottom conditions, suitability for installation of harbour facilities and dredging. No materials encountered should impede dredging operations. High resolution and standard boomers were used for sound sources.
      Document
    • PDF
  • Previous
  • 1
  • ...
  • 4
  • 5
  • 6
  • 7
  • 8
  • ...
  • 15
  • Next
Download in queue. Do not close this page.

Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.

Don’t want to wait? Request for a download link to be sent to you

Download started...

Your download will start automatically in a few seconds.

Request delivery

It usually takes us a few business days to deliver your selected downloads to you via an S3 bucket. Please leave your email address and we’ll be in touch when it’s ready.

Request submitted.

We’ll be in touch in the next few business days. Sometimes we can get a large number of requests, but we strive to get back to you quickly. If, after a few days you haven’t received an email, please email us on mesacOpenData@dnrme.qld.gov.au

Made with CKAN 2.9.7(1.79)
Acknowledgement
Copyright
Disclaimer
Privacy
Contact Us
South Australia Government