-
Data release - as updated : Bulgunnia. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
An area centred approximately 70 km north-northeast of Tarcoola has been explored for possible economic buried basement-hosted IOCG style or other (e.g. Menninnie Dam and/or Mount Gunson type) altered rock facies - hosted metallic mineralisation,...-
Document
Published: 27 Oct 1922
-
Stony Top Hill (part of the Gairdner Project). Annual reports and final report to licence expiry/full surrender, for the period 7/10/2010 to 6/10/2014.
An area centred ~17 km south-east of Kingoonya has been explored for possible buried IOCG deposits that could relate to the very large "Shellback" regional magnetic anomaly located in the south-eastern Kingoonya district. Farminee AngloGold's...-
Document
Published: 21 Oct 1914
-
Kingoonya. Annual reports and final report to licence full surrender, for the period 27/11/2006 to 21/4/2015.
An area surrounding the township of Kingoonya and straddling the Trans Australia Railway line, that comprises six tenement sub-blocks,has been explored for possible economic occurrences of buried Tertiary roll-front style secondary uranium...-
Document
Published: 23 Apr 1915
-
Moseley Nobs (part of the East Eyre Peninsula Project). Third partial surrender report, for the period 5/7/2006 to 4/7/2015.
EL 4860 has been part of the Investigator Resources Ltd tenement holding since that company was spun-off from Southern Gold in 2007 (as Sunthe Uranium Ltd). The Eastern Eyre Peninsula project group of licences, which lie along and just beyond the...-
Document
Published: 08 Oct 1915
-
Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Technical reports and annual reports to licence expiry/renewal, for the period 4/5/1998 to 3/5/2003.
Stuart Metals took up EL 2516 covering ground in the Elizabeth Creek - Yeltacowie Homestead area primarily to explore it for stratiform copper mineralisation of the various styles present in the Mount Gunson area. In addition, it was thought that the...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Annual reports for the period 24/9/2001 to 23/9/2005.
The buried Menninnie Dam zinc-lead(-silver-copper) deposit, located approximately 55 km north of Kimba on northern Eyre Peninsula, and sitting adjacent to the south-eastern margin of the Gawler Ranges, is being evaluated for its future commercial...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Nonning (latterly part of Terramin's Menninnie Zinc Project). Annual reports for the period 30/3/2006 to 30/11/2012.
An area centred ~70 km north of Kimba, which also lies about 7 km north of the Menninnie Dam lead-zinc-silver deposit, was taken up to explore for possible buried economic volcanic epithermal/hydrothermal Mesoproterozoic Fe-rich Cu-Au mineralisation...-
Document
-
Data release : Yeltacowie, Pernatty [Station] and Whittata (the Punt Hill IOCG Project). Joint annual reports, plus final report to expiry of EL 5774 Punt Hill, for the period 7/1/2012 to 6/1/2017.
During the eighth, 2012-2013 year of tenure of the Pernatty EL area, now being explored in concert with two other adjoining Punt Hill IOCG Project licences, Monax reviewed its past drillhole data, undertook further processing of the project's amassed...-
Document
Published: 29 Aug 1917
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-04 - Woodmurra Project, Denison Inlier, Proterozoic metamorphosed volcanogenic basement stratiform/syngenetic Broken Hill type Pb-Zn-Ag prospects. Final report
An area lying ~70 km east and south-east of Oodnadatta is being explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which may be contained within strongly deformed and metamorphosed Palaeo- to...-
Document
Published: 31 Oct 1916
-
Reid Lookout and Siam [Station]. Information status at licences' joint full surrender, for the period 21/3/2016 to 13/7/2017: no work performed.
There is no abstract created for this record-
Document
-
Glendambo (part of the Woomera Project). Information status at licence full surrender, for the period 23/8/2012 to 17/8/2017: no work performed.
No work performed.-
Document
-
Fairview [Homestead]. Information status at licence full surrender, for the period 19/1/2016 to 13/4/2017 : no work performed.
There is no abstract created for this record-
Document
-
Data release - as updated : Tallaringa North and Tallaringa South (part of the Coober Pedy Project). Joint annual reports to licences' joint expiry/full surrender, for the period 24/5/2012 to 23/5/2019.
Three areas centred ~120 km west south-west of Coober Pedy and lying in the northern part of the Gawler Craton, one located within the Mabel Creek Domain and the other two being adjacent and further to the south, within the Christie Domain next to a...-
Document
Published: 19 Jun 1919
-
Anna Creek. Annual reports to licence expiry/full surrender, for the period 9/4/2019 to 8/4/2021.
A large area centred ~10 km north of The Mulgas Outstation on Anna Creek Station, and lying ~80 km north-east of Prominent Hill, has been explored for inferred buried IOCG-U type volcanic breccia deposits which might exist in Proterozoic basement...-
Document
Published: 27 Apr 1921
-
Centre Hill (part of the Woomera Project). Information status at licence full surrender, for the period 23/8/2012 to 17/8/2017: no work performed.
No work performed.-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Old Wartaka. Annual reports for the period 8/5/2013 to 7/5/2019.
A small area located on the eastern side of the Roopena Fault Zone, proximal to the south-eastern margin of the Gawler Ranges, is being explored for possible buried epigenetic gold and silver mineralisation, or IOCG type base metal sulphide...-
Document
Published: 13 May 1919
-
Data release [made at SA Director of Mines' discretion] : Mount Ive [South] (part of the Mount Ive Project). First annual report, for the period 20/6/2014 to 19/6/2015.
An area centred on the southern part of Mount Ive Station is being explored primarily for buried economic, basement hosted and structurally controlled hydrothermal Ag-Zn-Pb and epithermal Au-Ag-(Cu) vein style mineralisation, as well as for possible...-
Document
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 1916