Lake Gilles area. Data release made in lieu of submitting a partial surrender report upon licence renewal : progress reports for the period 26/10/1989 to 10/2/2001.
Menninnie Dam - style Pb-Zn mineralisation in areas north and east of Lake Gilles was the initial target of exploration. A ground magnetic survey conducted along five lines was followed by shallow auger drilling (302 holes, total 1099 m) plus lag,...-
Document
-
RB 2016/00024 Mineral Systems Drilling Program Rock Shack - [a pictorial catalogue of the] outcrop sample collection for the MSDP southern Gawler Ranges margin.
Between July 2015 and April 2016, the Geological Survey of South Australia, in collaboration with the Deep Exploration Technologies Cooperative Research Centre (DET CRC), Minotaur Exploration Limited and Kingston Resources Limited, carried out a...-
Document
Published: 01 Dec 2016
-
RB 2016/00025 Geology of the Peltabinna 1:75 000 Special Edition Map Sheet.
The Peltabinna 1:75 000 Map Sheet was produced as part of a mapping program integrated into the Mineral Systems Drilling Program (MSDP) along the southern margin of the Gawler Ranges. The objective of the mapping program was to provide a regional...-
Document
Published: 01 Sep 2017
-
Surface Geology of Peltabinna – Mineral Systems Drilling Program Special Map Series, 1:75 000 scale.
There is no abstract created for this record-
Map
Published: 01 Jul 1917
-
Interpreted Proterozoic geology of Peltabinna – Mineral Systems Drilling Program Special Map Series, 1:75 000 scale.
There is no abstract created for this record-
Map
Published: 01 Jul 1917
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-17, Menninnie Dam area base metal and gold mineral prospects. Project final report.
During February-July 2005, a PACE Initiative collaborative drilling programme with PIRSA was prepared and undertaken by Terramin Australia at the Menninnie Dam prospect to investigate two objectives: · The B1 cerussite target identified by drilling...-
Document