-
Pualco West. Progress reports and final report to licence expiry/full surrender, for the period 26/10/1972 to 25/10/1973.
Reconnaissance and detailed bulk loam sampling undertaken to look for diamonds or kimberlite indicator minerals in the vicinity of the Pualco Anticline, plus spectrographic analyses of the derived heavy mineral concentrates for gold and base metals...-
Document
Published: 12 Dec 1973
-
Lilydale. Data release made in lieu of submitting a first partial surrender report : progress reports, annual reports and final report to licence expiry/renewal over a much reduced area, for the period 5/1/1988 to 4/1/1993.
Initial exploration carried out near Lilydale Homestead, 80 kilometres south-east of Yunta, targeted possible Starra-style gold in the Braemar Ironstone facies. Flying of an airborne semi-detailed magnetic and radiometric survey identified magnetic...-
Document
-
Braemar. Progress reports to licence full surrender, for the period 17/5/1990 to 3/9/1991.
In a search for possible economic buried copper-gold mineralisation that might be associated with an inferred south-western extension of the major Anabama - Redan Fault Zone system, the licensee conducted reconnaissance minus 80 mesh stream sediment...-
Document
-
Outalpa Hill. Data release made upon the full surrender of a subsequent licence : progress reports to licence expiry, for the period 15/7/1988 to 8/8/1994.
Exploration for possible economic gold occurrences in an area surrounding Outalpa Hill in the Olary Ranges, 25 km north of Manna Hill township, has been conducted initially by a private prospecting syndicate with the assistance of industry...-
Document
-
Data release - as updated : Goode Hill. Annual reports and final report to licence expiry/full surrender, for the period 27/6/2002 to 28/8/2015.
Exploration of an area of Neoproterozoic metasedimentary rocks bordering, and in part intruded by, Ordovician plutons of the Anabama felsic intrusive complex, has targeted possible analogues to the Blue Rose copper-gold skarn mineralisation...-
Document
Published: 04 Nov 1915
-
Data release - as updated [made at SA Director of Mines' discretion] : Bonython Hill (part of the Border Project). Annual reports for the period 23/2/2007 to 18/5/2014.
During Year 7 of reporting, exploration work included two 1 km soil geochemical traverses, field inspection of Neogene palaeochannels and land access negotiations with landowners. Previous exploration in the region has recognised the correlation...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Cutana. Annual reports for the period 10/12/2009 to 9/12/2018.
An area consisting of three separate sub-blocks located ~20 to 35 km north-east of Olary and ~20 km east of Cutana is being explored for possible economic gold as basement shear and vein hosted style deposits, as well as for possible extensions of the...-
Document
-
Netley Gap. Annual reports and final report to licence expiry/full surrender, for the period 6/7/2016 to 5/7/2019.
A small licence comprising two separate sub-blocks located 4 km and 22 km south-east of Winnininnie on the Barrier Highway has been explored for possible buried economic, epithermal/hydrothermal structurally controlled copper-gold mineralisation that...-
Document
Published: 04 Sep 1919
-
Mutooroo (latterly part of the Border JV Project). Second partial surrender report at licence expiry/renewal, for the period 16/1/1997 to 18/4/2017.
Four separate large portions of a long-held licence area abutting the SA/NSW state border in the vicinity of Mutooroo have been relinquished as part of statutory requirements. The following summary prepared by Minotaur Exploration describes work done...-
Document
-
Wharton Hill. Annual reports and final report to licence expiry/full surrender, for the period 14/4/2016 to 13/4/2020.
An area covering the western end of the historic Anabama copper prospect in the Benda Range, south-west of Manna Hill, has been explored for possible buried economic, epithermal/hydrothermal structurally controlled copper-gold mineralisation that may...-
Document
Published: 05 Jun 1920
-
Mount Victor. Progress report for the period 29/10/1970 to 28/10/1971.
9 rock chip, mine dump, tailings, and hand auger alluvium samples were collected from abandoned gold workings. No significant assays were returned, and the area has limited potential for either bedrock or alluvial gold.-
Document
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Olary (latterly part of the Olary Project). Annual reports and final report to licence full surrender, for the period 21/1/2008 to 20/01/2015.
A large area located immediately south and south-west of Olary has been explored initially for possible economic buried primary epithermal to mesothermal copper-gold and gold only mineralisation that might have formed in Adelaidean and older bedrock,...-
Document
Published: 01 Apr 1915
-
Data release - as updated [made at SA Director of Mines' discretion] : Cutana. Annual reports for the period 25/7/2007 to 15/8/2013, and the "Curnamona South Project" annual report for the period 1/1/2017 to 31/12/2018.
During licence year 6, the commencing year of renewed EL 3895 Cutana, no work took place because Havilah's RC drilling rig, along with all company personnel, were fully occupied on completing the mining feasibility evaluation drilling programmes...-
Document
Published: 15 Apr 1919
-
Goode Hill (the Anabama Project). Fifth partial surrender report, for the period 27/6/2002 to 26/6/2014.
Two portions of two licence sub-blocks, together totalling 35 square km or ~26.3% of the former area, have been relinquished from a long-running tenement which is centred ~40 km south of Olary. This licence was taken up by Adelaide Exploration to...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Devonborough Downs (part of the Olary Project). Annual reports to licence expiry/renewal, for the period 22/10/2007 to 21/10/2012.
An area centred ~30 km south-east of Olary township is being explored for possible buried economic porphyry copper-gold deposits, as well as for any other substantial either Carlin-type, skarn-hosted, Telfer-style, or mesothermal gold mineralisation....-
Document
Published: 16 Nov 1912