PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-34, Drew Hill JV area Curnamona Group base metal mineral prospects. Project final report.
During early 2005, the Drew Hill joint venture partners conducted a regional base metal exploration programme over their mineral tenements located approximately 20-70 km north-east of Olary. Possible epithermal iron oxide copper-gold (IOCG)...-
Document
-
Kalabity (part of the Strathearn Joint Venture Project). Data release at licence expiry/full surrender : progress reports and annual reports for the period 4/7/1988 to 15/10/2003.
The initial manager of the joint venture, CRA Exploration Pty Ltd (CRAE), targeted a range of copper, gold and uranium mineralisation styles, including vein-style uranium associated with carbonate rocks (Kintyre model), Olympic Dam style...-
Document
-
Walparuta. Progress and annual reports, and final report to licence expiry/full surrender, for the period 6/12/1994 to 20/4/2009.
Ground encompassing the Palaeoproterozoic basement Weekeroo Inlier of the Olary district, which includes the historic Walparuta copper-gold mine located approximately 20 km north of Manna Hill township, was taken out to search for possible economic...-
Document
Published: 28 Aug 1909
-
Bundera Well. Annual reports and final report to licence expiry/full surrender, for the period 27/6/2000 to 26/6/2005.
Possible buried Palaeoproterozoic stratiform to stratabound Cloncurry style Cu-Au mineralisation was the principal objective of exploration undertaken over an area located approximately 60 km north-east of Olary. Other conceptual targets included...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kalabity. Annual reports for the period 25/2/2009 to 11/3/2019.
The main exploration activities undertaken during the first year of tenure of renewed EL 4239 (licence Year 6, 2009-2010) consisted of drill testing of uraniferous prospects defined by previous exploration, after the prior acquisition of an airborne...-
Document
-
Kalabity [part of a joint licence area with South Eagle]. Progress and final reports to licence re-issue over a stand-alone area, for the period 13/9/1976 to 12/9/1977.
Continuing exploration for economic stratiform / hydrothermal base metal sulphide deposits in the Kalabity Homestead area, 40 km north of Olary, has comprised detailed geological mapping at 1:20,000 scale, outcrop rock chip geochemical sampling,...-
Document
-
Kalabity. Data release in lieu of partial relinquishment at licence expiry/renewal : progress reports, and successive joint venturers' final reports, for the period 6/10/1978 to 14/3/1988.
This release details exploration conducted between 1978 and 1988 for uranium, base and precious metals in the Early Proterozoic rocks of the Willyama Complex, north of Olary. Initial work on searching for uranium included airborne helicopter...-
Document
-
Macdonald Hill, Mingary and Bulloo Creek (Drew Hill Project). First partial surrender/ second partial relinquishment reports at project licences' expiry/renewal, for the period 30/9/2003 to 29/9/2008.
Work carried out on the now relinquished licence portions has comprised the acquisition, processing and interpretation of Aster satellite imagery (SWIR, VNIR and Landsat TM247 images) by contractor Geoimage in November 2004, followed by a consultant's...-
Document
Published: 13 May 1909
-
Benagerie (part of the Benagerie Ridge Joint Venture Project). Progress and annual reports to the commencement of multi-licence joint reporting on the Curnamona Joint Venture Project, for the period 2/5/1989 to 3/5/2003. [Index Part 1 of 3].
An area of sparsely explored, Tertiary and Cretaceous sediment and soil-covered Proterozoic bedrock centred approximately 80 km north of Olary is being explored primarily for base metal massive sulphide deposits. The underlying Benagerie Ridge...-
Document
Published: 19 May 1903
-
Data release - as updated [made at SA Director of Mines' discretion] : Curnamona JV Project area (including Benagerie and Kalkaroo). Combined annual reports for the period 10/5/2003 to 31/12/2007.
Ongoing exploration carried out by project operator Havilah Resources under its newly ratified, twelve exploration licence Curnamona Project Amalgamated Expenditure Agreement, for the period 15/10/2003 to 31/12/2004, consisted mainly of drilling done...-
Document
-
Bulloo Creek, Old Lake Dismal and Wompinie [North] (part of the Drew Hill JV Project). Joint annual reports to licences' joint expiry/full surrender, for the period 25/8/2005 to 24/8/2008.
Possible Ernest Henry - style IOCG mineral deposits formed in Palaeoproterozoic basement metasediments and intrusive rocks buried under thick cover were the targets of exploration carried out on three irregular tenement areas spread across the region...-