-
Bond Hill. Annual reports to licence surrender for the period 17/5/2002 to 3/6/2005.
An area located between Lakes Acraman and Gairdner was taken up to explore for possible buried iron oxide - associated copper-gold deposits hosted by subcropping basement rocks of the Gawler Range Volcanics (GRV). The licensee had noted a lack of...-
Document
Published: 14 Apr 1905
-
Moorlands. Progress reports and final report to licence full surrender, for the period 15/1/1979 to 30/11/1984.
Adelaide Brighton Cement took up tenure of the Moorlands lignite deposit during September 1976 in order to conduct confirmatory drilling of the published coal resource, to prepare a mining study for Lobe 'E', and overall, to assess the coal's...-
Document
Published: 23 Nov 1984
-
Moorlands coal deposit conceptual mining study.
Coal seam thickness averages 9.55 metres. In situ reserves are 8.85 MT. Recoverable coal reserves are 8.6 MT. Capital required to bring the mine into operation is $15.2 M. The real average cost of production is $13.69 / T.-
Document
-
RB 2016/00025 Geology of the Peltabinna 1:75 000 Special Edition Map Sheet.
The Peltabinna 1:75 000 Map Sheet was produced as part of a mapping program integrated into the Mineral Systems Drilling Program (MSDP) along the southern margin of the Gawler Ranges. The objective of the mapping program was to provide a regional...-
Document
Published: 01 Sep 2017
-
Surface Geology of Peltabinna – Mineral Systems Drilling Program Special Map Series, 1:75 000 scale.
There is no abstract created for this record-
Map
Published: 01 Jul 1917