-
Mount Willoughby, Marla, Nicholson Hill, Hope, Manya, Emu, Moorefield, Lake Meramangye, Dingo Claypan and Alinya (Officer Basin). Progress, technical and partial relinquishment reports for the period 20/8/1980 to 19/8/1985.
TRONA EXPLORATION: Of the 9 rotary/diamond holes drilled, only the first, Meramangye 1, intersected a unit equivalent to the Observatory Hill Beds, which was the target horizon for trona. Drillholes Manya nos 2-6 and Marla 7 intersected Cambrian red...-
Document
-
Todmorden. Progress reports for the period 21/4/1986 to 20/11/1987.
TARGET: Native sulphur associated with possible salt dome structures, the locations of which were interpreted from past petroleum exploration seismic reflection surveys. EXPLORATION: A detailed gravity survey, and 2 rotary/core drillholes totalling...-
Document
Published: 13 Jan 1988
-
Canegrass Ridge and Nilpinna Spring. Joint progress reports and joint final report to licences' respective expiry/full surrender, for the period 1/12/1980 to 7/12/1981.
Two licence areas respectively flanking the eastern and western sides of the southern Peake and Denison Ranges were taken up to investigate the alluvial diamond potential of sediments within basinal margin settings, in view of diamond indicator...-
Document
-
Oolgelima Hill. Progress reports plus second partial surrender report, for the period 14/7/1983 to 14/10/1986.
Evaporite minerals in black shale at the base of the Early Cretaceous Bulldog Shale near the western margin of the Eromanga Basin were the target about 50 km NE of Coober Pedy. Reconnaissance mapping, soil sampling, auger drilling and the backhoe...-
Document
Published: 03 Nov 1986