Mount Denison and Mount Charles (the Peake and Denison Project). Data release upon the expiry/full surrender of subsequent licences : respective annual and combined annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 2 of 2 ].
[ Note - here is only Part 2 of an abstract relating to 2 separately indexed parts ]. During the latter half of 1997, just before it transferred project management to BHP Minerals, Renison Gold Corp. carried out reconnaissance bedrock geochemical...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-04 - Woodmurra Project, Denison Inlier, Proterozoic metamorphosed volcanogenic basement stratiform/syngenetic Broken Hill type Pb-Zn-Ag prospects. Final report
An area lying ~70 km east and south-east of Oodnadatta is being explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which may be contained within strongly deformed and metamorphosed Palaeo- to...-
Document
Published: 31 Oct 1916
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 1916
-
West Lake Eyre. First progress report plus final report to licence full surrender, for the period 25/1/1980 to 13/6/1980.
Dampier Mining's main objective in taking out this licence was to test a large magnetic complex, situated east of the Peake and Denison Ranges and west of Lake Eyre, for possible economic buried base and precious metal deposits. Grid-based ground...-
Document
-
Mount Denison (part of the BHP Billiton - Rio Tinto - Phelps Dodge' Peake and Denison Joint Venture Project). First partial surrender report, for the period 12/7/1993 to 16/9/2003.
Exploration carried out over the northern Peake and Denison Ranges since 1993 has targeted possible large-scale Proterozoic iron oxide associated copper-gold (IOCG) deposits considered to have formed in stratigraphic/structural settings similar to...-
Document
-
Mount Arthur. Progress reports and final report to licence expiry/full surrender, for the period 5/9/1980 to 5/3/1983.
Exploration for possible kimberlite pipes in the Mount Arthur - Mount Toodla area, 30 km east-southeast of Oodnadatta, has included preliminary gravity and ground magnetic surveys, stream sediment sampling, and the drilling of a single diamond cored...-
Document
Published: 09 Jun 1983
-
Lagoon Hill. Progress and final reports to licence surrender for the period 2/11/1972 to 1/11/1973.
Exploration for possible roll-front sedimentary uranium deposits developed in porous and arenaceous Upper Jurassic to Lower Cretaceous sediments of the Algebuckina Sandstone and Cadna-owie Formation, where these onlap likely uranium-providing...-
Document
Published: 08 Apr 1974