-
EPP 23, Otway Basin, South Australia. Evaluation report.
In order to examine the prospectivity of EPP 23, for which they assumed the operatorship by a 65% farm-in in August 1990, BHP Petroleum have examined well palynological and geochemical data in and around the permit and have interpreted over 600 km of...-
Document
-
PEL 22 exploration guidelines and the prospects for locating hydrocarbons (in) the Gambier Embayment, South Australia.
This study concentrates on the correlation of lithostratigraphic units, establishing a model for the likely source rock maturity pattern, and elucidating the structure, seal and reservoir relationships. The Early Cretaceous Otway Group is considered...-
Document
-
Review of the geology, geophysics and directions for future petroleum exploration, EPP SA-2, offshore Otway Basin, South Australia.
This consultant's report prepared for the EPP SA-2 operator comprises a review of the regional basinal geology, tectonics and stratigraphy, petroleum exploration history and recorded hydrocarbon occurrences, seismic coverage and interpretive results,...-
Document
-
Preliminary report on the biomarker geochemistry of rock extracts from Chama 1A and Geltwood Beach 1: comparison with some Otway oils and coastal bitumens.
Organic geochemical analyses were carried out on 6 rock sample pyrolysis extracts from Chama 1A and 7 from Geltwood Beach 1 to determine whether the Crayfish and/or Eumeralla formations in these wells could be a source for the asphaltites and bitumens...-
Document
-
1987 seismic survey, Orana, final report.
AIM: The 1987 Orana Seismic Survey, consisting of 14 lines with a total coverage of 55.6 line kms, was shot to further detail leads identified by the 1985 Burrungule Seismic Survey, other than the single lead (McNamara Prospect) which was confidently...-
Document
-
1985 seismic survey, Burrungule, final report.
AIM: This seismic survey of 32 lines with a total 352.26 line kms coverage was conducted in the two most prospective areas of the licence in order to fulfil the Licence Year 1 work commitment of at least 250 line kms of seismic acquisition. The two...-
Document