-
Ardrossan 1, Maitland. Drilling report.
One drill hole to test coincident geophysical features with an accompanying radon anomaly (the Pavey structure) was completed in basement at 220.5 metres. Minor uranium values were intersected near surface in a Tertiary regolith developed on Cambrian...-
Document
-
Maitland [second JV programme]. Progress reports for the period 17/8/81 to 14/5/84.
Continuing mineral exploration work over central Yorke Peninsula under a new joint venture arrangement with a different company, now targetting possible Phanerozoic sedimentary uranium in Cambrian and Tertiary strata, has consisted of investigations...-
Document
-
Minlaton. Progress reports plus final report to licence full surrender, for the period 27/4/1977 to 6/12/1978.
One diamond and seven rotary/percussion drillholes tested Cambrian rocks for base metals. Six water bores were logged geophysically. IP/resistivity and gravity surveys were undertaken.-
Document
-
Maitland. Progress reports to licence expiry/renewal, for the period 24/2/1975 to 23/2/1977.
As part of an ongoing search for MVT style base metal mineralisation within Lower Cambrian strata of the southern part of the Torrens Hinge Zone on Yorke Peninsula, in September 1975 112 RC holes for 1730 m were drilled at 500 m spacings along...-
Document
-
Price. Progress and final reports to licence surrender, for the period 27/4/1977 to 6/12/1978.
Continuation by Aquitaine of its regional appraisal of the mineral potential in the Cambrian carbonate sequence on northern Yorke Peninsula, has recently involved them in acquiring and interpreting ground gravity and magnetic surveys, completing a...-
Document