-
1995 marine seismic survey, HD95, final report.
AIM: To obtain detailed coverage of potential drilling prospects, and add to the regional grid over the permit area. Work would initially focus on the Rocky strong lead, the main permit Year 6 drilling candidate, and then embrace the remaining six...-
Document
-
1992 marine seismic survey, DH92, final report.
AIM: To confirm a number of prospects and leads outlined with the most recent interpretation of the existing seismic data over both permit areas. Due to the presence of shallow intrusives and difficulty in mapping the basement in certain areas,...-
Document
-
Release of vacant offshore areas for petroleum exploration, as made public by the Commonwealth and States of Australia. Information packages, 1987-1995.
There is no abstract created for this record-
Document
-
1991 marine seismic survey, DH91, final report.
AIM: The DH91 seismic survey programme was designed to provide new 2D coverage of potential prospects and leads in an offshore area with very little modern seismic data, especially in the southeastern part of the permit. Complementary 1983 and 1984...-
Document
-
Scientific investigation survey, Great Australian Bight, November 1989 to March 1990. Reports.
BP Exploration Company Ltd Research Unit (Sunbury, England) flew an airborne laser fluorosensor (ALF) survey over the Great Australian Bight region during the period January-March 1990, as part of BP Australia Ltd's Australian continental shelf...-
Document
-
Platypus 1. Well proposal and drilling programme.
There is no abstract created for this record-
Document
Published: 29 Nov 1971