South Australia Cooper Basin Production and Processing Operations - Environmental Significance Assessment - Archived.
There is no abstract created for this record-
Document
Published: 31 Aug 2003
-
2013 Annual Report of South Australian Cooper Basin Joint Venture (SACBJV) Operations.
This report covers: -SACBJV exploration, production and processing operations. -Pipelines operated under Pipeline Licences PL 5 (Ballera to Moomba), PL 9 (Stokes to Mettika) and PL 15 (Moon to Kerna). -Emergency response exercises conducted during...-
Document
Published: 19 Feb 2016
-
PPLs 206, 208 and 215 2014 Annual Report.
This report covers activities conducted within PPLs 206, 208 and 2105 for the 2014 calendar year.-
Document
Published: 21 Mar 2016
-
South Australia Cooper Basin Production and Processing Operations - Statement of Environmental Objectives - Archived.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft Statement of Environmental Objectives (SEO) prior to exploration commencing....-
Document
Published: 01 Feb 2014
-
South Australian Cooper Basin Operators Drilling and Well Operations - Environmental Impact Report. Archived.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope. An EIR must identify any events associated with the...-
Document
Published: 28 Feb 2003
-
Beach Petroleum Cooper Basin Petroleum Production Operations - Environmental Impact Report. Archived.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope. An EIR must identify any events associated with the...-
Document
Published: 30 Nov 2003
-
PPLs 203, 207, 208, 209, 211, 213, 214, 215, 217, 218, 221, 240, 242, 243, 251, 258 Annual Report - 2016.
This report covers activities undertaken within PPLs 203, 207, 208, 209, 211, 213, 214, 215, 217, 218, 221, 240, 242, 243, 251, 258 during the 2016 calendar year.-
Document
Published: 28 Jul 2017
-
PEL 115 Regional Geologic Studies - Patchawarra Fm Chronostratigraphy.
Purpose of study The initial findings of the chronostratigraphic studies undertaken near and within the PEL 115 permit were reported to the PEL 115 SA Cooper Basin Joint Venture at the JV Meeting held in Adelaide on 18th August, 2004. At the time of...-
Document
Published: 01 Nov 1904
-
PEL 111-104 Regional Prospectivity Review and Recommended Forward Geotechnical Studies.
The purpose of this report was to provide an audit for the Joint Venture of current understanding of prospectivity and to recommend the necessary geotechnical studies required which will contribute to the discovery and exploitation of oil and gas...-
Document
Published: 01 Nov 1904
-
SFL 10 Annual Report - Year 2.
This report covers activities conducted within SFL 10 during Term 1 Year 2 for the period 13/03/2015 - 12/03/2016.-
Document
Published: 08 Jul 2016
-
SFL 8 Annual Report - Year 3.
This report covers activities conducted within SFL 8 during Term 1 Year 3 for the period 20/11/2015 - 19/11/2016.-
Document
Published: 21 Apr 2017
-
2015 Annual Report of South Australian Cooper Basin Joint Venture (SACBJV) Operations.
This report covers: -SACBJV exploration, production and processing operations. -Pipelines operated under Pipeline Licences PL 5 (Ballera to Moomba), PL 9 (Stokes to Mettika) and PL 15 (Moon to Kerna). -Emergency response exercises conducted during...-
Document
Published: 21 Apr 2017
-
SFL 9 Annual Report - Year 3.
This report covers activities undertaken within SFL 9 during Year 3 for the period from 10/01/2016 - 09/01/2017.-
Document
Published: 28 Jul 2017
-
SFL 10 Annual Report - Year 3.
This report covers activities undertaken within SFL 10 during Year 3 for the period 13/03/2016 - 12/03/2017.-
Document
Published: 28 Jul 2017
-
PPLs 204, 205, 210, 212, 220, 224, 239, 245, 246, 247, 248, 249, 250 and 257 Annual Report - 2015 Calendar Year.
This report covers the activities undertaken in PPLs 204, 205, 210, 212, 220, 224, 239, 245, 246, 247, 248, 249, 250 and 257 during the 2015 calendar year (1 January 2015 - 30 December 2015).-
Document
Published: 05 Aug 2016
-
PSL 31 Annual Report - Year 2.
This report covers the activities undertaken within PSL 31 during Year 2 for the period 10/02/2015 - 09/02/2016.-
Document
Published: 21 Sep 2016
-
PL 7 Annual Report - 2015/2016.
This report covers activities conducted pursuant to PL 7 during the 2015-2016 period.-
Document
Published: 21 Apr 2017
-
Factors Influencing Water Block Damage in Low Perm Gas Sands.
A recent major re-analysis of the results of the 1996-1997 mud testing program has provided a lot of insight into the factors driving mud performance in the field. To end 1997 we had carried out 22 core tests involving WBMs and 10 involving SBMs/OBMs...-
Document
Published: 24 Feb 1998
-
Canberra-1A Formation Evaluation.
A full formation evaluation of Canberra 1A was undertaken as it was considered important given the differing opinions of the potential of the well bore to deliver hydrocarbons subsequent to the Mosaic Oil N.L. farm-in deal. Mosaic Oil N.L. maintained...-
Document
Published: 01 Dec 1904
-
GEL 268 Annual Report - Term 2 Year 4.
This report covers the activities carried out in GEL 268 during Term 2 Year 4 for the period 23/05/2016 - 22/05/2017).-
Document
Published: 30 Jan 2018