Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
Billa Kalina, Welcome Creek, Millers Creek, Margaret Creek and Francis Swamp (the Billa Kalina G2 Diamond Project). Data release made at remaining licences' joint partial surrender: joint annual reports for the period 25/2/2006 to 29/8/2012.
As part of continuing diamond exploration on the subject five licences, more of the first pass sampling program was completed by Flinders Diamonds in August 2006 via aircore drilling of 47 vertical holes for an aggregate 1852 m aimed at penetrating to...-
Document
Published: 10 May 1912
-
Galaxy Tank (part of the Central Gawler Project). Annual reports to licence expiry/full surrender, for the period 22/3/2006 to 10/5/2013.
Tasman Resources' ("Tasman") Central Gawler Project tenement acreage, originally comprising seven exploration licences ELs 3339 to 3345, was initially applied for on the basis of perceived prospectivity for diamonds: however, following Tasman's...-
Document
Published: 16 Jul 1913
-
Peake. Annual reports and final report to licence expiry/full surrender, for the period 3/8/2004 to 28/9/2014.
An area located to the west and south of the Algebuckina Inlier of the Proterozoic Peake and Denison Ranges, which is centred approximately 50 km south-east of Oodnadatta, has been explored for possible roll-front style sedimentary uranium deposits...-
Document
Published: 01 Oct 1914
-
Mulga Well. Annual reports to licence expiry/full surrender, for the period 22/6/2004 to 21/6/2009.
An area located close to the western margin of the Stuart Shelf, approximately 90-120 km south-west of the Olympic Dam deposit, and extending parallel to it for 65 km, was taken up by Marathon Resources (Marathon) to explore for possible economic IOCG...-
Document
-
Data release - as updated : Phar Lap Outstation. Annual reports plus final report to licence expiry/full surrender, for the period 27/8/2007 to 26/8/2017.
An area centred ~85 km south-southeast of Coober Pedy, at the southern margin of the Lake Phillipson Trough, a long active tectonic feature now occupied by deep sedimentary fill, was taken up by a wholly-owned subsidiary to Monax Mining Ltd primarily...-
Document
Published: 24 May 1917
-
Data release [made at SA Director of Mines' discretion] : Algebuckina. Annual reports for the period 3/8/2004 to 2/8/2008.
An area surrounding the Algebuckina Inlier of the Proterozoic Peake and Denison Ranges, which is centred approximately 50 km south-east of Oodnadatta, is being explored for possible roll-front style sedimentary uranium deposits that may have formed...-
Document
Published: 20 Oct 1908
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-01 - South Australia Ludi Mining Pty Ltd, Coward Springs area gravity/magnetic anomaly IOCG targets. Drilling project interim report and final report.
South Australia Ludi Mining Pty Ltd (“SALM”) acquired Exploration Licence 4619 “Coward Springs” to explore for large Mesoproterozoic copper/gold/uranium deposits analogous to Olympic Dam, which is located approximately 120 km to the south. The licence...-
Document
-
Data release - as updated : Nicholson Hill and Welbourn Hill. Joint annual reports plus separate final reports to respective licence's expiry/full surrender, for the period 15/1/2008 to 14/1/2017.
Possible buried Proterozoic IOCG-U deposits that may have formed in two small licence areas located ~50 to 65 km east of Marla were the targets of renewed exploration, based on a re-interpretation of existing regional geophysical data. It had been...-
Document
Published: 13 Feb 1917