-
Point Paterson - Port Pirie area. Progress, technical and final reports for the period 22/1/1970 to 10/12/1971.
Reports on the investigation of potential northern Spencer Gulf coastal sites for the solar evaporative production of seawater salt, principally as a feedstock for the proposed petrochemical plant which was being considered by Dow Chemical Corp. for...-
Document
Published: 10 Dec 1971
-
RB 00811 Redcliff Project: geological setting and preliminary assessment of environmental factors.
This report has been compiled at the request of the Redcliff Steering Committee to assist in the preparation of an Environmental Impact Statement. It relies almost entirely on work carried out by Departmental officers and private consultants during...-
Document
-
RB 66/00108 Port Augusta-Whyalla railway, Spencer Gulf crossing. Geological investigations, progress report no. 1, feasibility stage, Hds Davenport and Copley.
It is proposed to construct a railway crossing of Spencer Gulf and its tidal flats, two miles north of Port Augusta. Geological investigations, mainly surface mapping and cable tool drilling, have shown 140ft of sediments of Tertiary to Recent age in...-
Document
Published: 01 Jan 1968
-
Saltia Creek. Progress report to licence expiry/full surrender for the period 30/9/1968 to 29/9/1969.
Ten samples of silica-rich clays from the white clay deposit in the Hundred of Davenport, located 14 miles east of Port Augusta, were analysed for their content of alkaline metals, and then underwent fire tests to determine their ceramic value....-
Document