-
Mabel Creek. Annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 20/12/1999 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 50...-
Document
-
Safari, Lake Woorong, Leonard Rise, Thunderstorm Creek and Brumby Creek areas (Coober Pedy Ridge Project). Quarterly and six-monthly progress, plus annual and final, joint activity reports for the period 22/4/1991 to 22/3/2000.
The Coober Pedy Ridge / Mount Woods Inlier project investigated a 170 km long east-west belt of medium to high grade Proterozoic metamophics and syn- and post tectonic granites, centred 25 km south of Coober Pedy, for Broken Hill type stratiform...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 27/4/2000 to 8/8/2010.
During the sixth licence year, on renewed EL 2717 covering the same area as previously, the licensee, now a wholly owned subsidiary of AuIron Energy Limited (formerly Meekatharra Minerals Limited), progressed its investigations of the geology of the...-
Document
Published: 01 Sep 1916
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 9/8/2010 to 8/8/2015.
During licence Year 16, on its renewed EL 4534 over the period October to December 2010, South Australian Coal Limited (SA Coal) undertook a drilling campaign of 15 rotary mud partly cored vertical holes for 2871 m which included 2064.7 m of coring,...-
Document
Published: 01 Sep 1916
-
Warrina North, Warrina South, Mount Brady, Yarrabolina Hill, Mount Woods and Kangaroo Dam (the Mount Woods JV Project). Joint annual reports [on JV partners' independent exploration programmes] for the period 1/5/2010 to 31/1/2017.
During the 2011-2012 project reporting period, exploration activities within the Mount Woods Project area which were conducted by OZL primarily targeted IOCG style mineralisation. Work included: · a continuation of office-based target generation and...-
Document
-
Engenina Creek - Mount Brady and Balta Baltana Creek areas, south-east of Coober Pedy. Progress reports and final annual report to licences' expiry/full surrender, for the period 6/4/1981 to 23/6/1993.
{ELs 822, 1145, 1494 programme}: TARGET: Roxby Downs and Tennant Creek - style copper, gold, and uranium, plus diamonds in kimberlite diatremes and metamorphic and hydrothermal breccia - related iron ore, in the Engenina Creek area, 60 km south-east...-
Document
Published: 24 Jul 1993
-
Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project, then the Coober Pedy Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 2 of 4 ].
After Poseidon Exploration took over the management of ELs 1448 and 1465 in November 1991 as a result of a supplementary farm-in agreement made with Burmine, whereby Poseidon would fund the next two year's of exploration to earn Burmine's 50% interest...-
Document
-
RB 2020/00013 Gawler Craton Airborne Geophysical Survey Region 8B, Billa Kalina – Enhanced geophysical imagery and magnetic source depth models.
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Apr 2020
- ZIP,