-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Lincoln Gap (part of the Eastern Eyre Peninsula Project). First annual report and final report to licence expiry/full surrender, for the period 30/9/2009 to 29/9/2011.
An area located approximately 20 km south-west of Port Augusta has been explored for possible economic unconformity-hosted uranium at the base of the Pandurra Formation, for copper sulphides near the Beda Volcanics - Pandurra Formation contact, and...-
Document
-
Data release [made at SA Director of Mines' discretion] : Pernatty Lagoon [East]. Annual reports to licence expiry/renewal, for the period 27/6/1997 to 26/6/2002.
An area of the Stuart Shelf located between Pernatty Lagoon and the Beda Arm of Lake Torrens, with its western boundary lying 15 km east of the historic Mount Gunson copper mining field, is being explored for possible economic basement-hosted IOCG...-
Document
-
Beddome Dams. Progress reports to licence surrender for the period 28/7/1980 to 3/8/1983.
Ground magnetic and regional infill and detailed gravity surveys, plus Maxi-Probe ground EM soundings, were carried out on two grids laid out near Beddome Hill, which lies 35 km west of Roxby Downs Homestead, to investigate a 4-6 mGal regional gravity...-
Document
Published: 28 Sep 1983
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-43 - Torrens Hinge Zone - Yadlamalka Horst Adelaidean sediment-hosted copper and Palaeoproterozoic basement IOCG mineral prospects. Project interim and final reports.
In February 2008, Lincoln Minerals Ltd was awarded a grant of $100,000 in Round 5, Theme 2 of PIRSA's PACE Initiative to conduct drill tests for the possible presence of sediment-hosted copper mineralisation in Adelaidean successions, as well as for...-
Document
Published: 30 Jun 2009
-
Data release - as updated [made at SA Director of Mines’ discretion] : Pernatty [Station]. Annual reports for the period 29/11/2005 to 28/11/2009.
An area centred approximately 110 km north of Port Augusta, covering part of the Pernatty Ridge plateau on the south-western side of Lake Torrens, approximately 145 km south-east of the Olympic Dam mine, was taken up to explore for possible economic...-
Document
Published: 24 May 2010
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-14, Pernatty Lagoon area (eastern Gawler Craton) IOCG mineral prospects. Project final report.
PACE proposal DPY3-14 aimed to discover a new iron oxide - associated copper-gold (IOCG) mineralised magmatic centre, similar to the Olympic Dam setting, within the eastern margin of the Gawler Craton. The Pernatty Lagoon project is located less than...-
Document
Published: 20 Sep 2006
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-24, Canegrass IOCG mineral prospect. Project interim and final reports.
In a search for a new style of economic iron oxide copper - gold mineralisation in the Gawler Craton's Olympic Domain, which is being focussed on prospects mapped along a craton - scale, NW trending late fault in an area 70 km south-east of Woomera,...-
Document
Published: 20 Oct 2005
-
Data release : Yeltacowie, Pernatty [Station] and Whittata (the Punt Hill IOCG Project). Joint annual reports, plus final report to expiry of EL 5774 Punt Hill, for the period 7/1/2012 to 6/1/2017.
During the eighth, 2012-2013 year of tenure of the Pernatty EL area, now being explored in concert with two other adjoining Punt Hill IOCG Project licences, Monax reviewed its past drillhole data, undertook further processing of the project's amassed...-
Document
Published: 29 Aug 2017