PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-17, Mount Moulden and Mount Harcus mineral prospects. Project final report.
As part of the PACE Year 2 collaboration between PIRSA and the minerals industry, PepinNini Minerals proposed and was granted part subsidy funding for an extensive drilling programme in the western APY Aboriginal Lands of South Australia, to examine...-
Document
Published: 16 Jun 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-18. Western Musgrave Province - Mount Caroline area magmatic nickel-copper-PGE and stratiform or epithermal / hydrothermal base metal mineral prospects. Final report.
In late 2008 PepinNini Minerals completed a stratigraphic drilling programme in the western Musgrave Province as an approved PACE Initiative Year 5 collaborative project with PIRSA. The programme was designed to investigate the Mount Caroline...-
Document
Published: 20 Jan 1909
-
PACE 2020 Discovery Drilling 2012: Year 7 Drilling Partnership DPY7-15 - NiCul Minerals Limited, Central Musgrave Project, Woodroffe and Cooperinna areas Proterozoic basement magmatic Ni-Cu-Co-PGE sulphide mineralisation targets. Drilling final report.
Early in 2012, explorer NiCul Minerals Limited (NiCul) sought PACE Initiative funding from the South Australian Government to help it undertake a programme of stratigraphic and targeted mineral exploration drilling within EL 3931 Woodroffe and EL 4587...-
Document
-
Pine Ridge (part of the Central Giles Nickel Project). Annual reports and final report to licence surrender, for the period 30/3/2007 to 9/6/2015.
A licence area located in South Australia's Far North-west Aboriginal Lands, approximately 140 km north-west of Marla, has been explored primarily for massive magmatic nickel sulphide deposits possibly associated with the Proterozoic Giles Complex...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Davies (part of the Central Giles Nickel Project). Annual reports for the period 4/3/1999 to 23/9/2009.
A licence area located in South Australia's Far North-west Aboriginal Lands, and centred approximately 20 km to the south-east of the Surveyor Generals Corner at the borders of Western Australia, South Australia and the Northern Territory, has been...-
Document
-
Hanging Knoll. Annual reports to licence expiry/full surrender, for the period 20/10/1995 to 6/9/2003.
Mafic and ultramafic rocks of the Proterozoic Giles Complex, which have intruded highly metamorphosed basement units of the Musgrave Block in an area 300 km WNW of Marla, were considered to have potential to host massive Ni sulphide mineralisation,...-
Document
Published: 02 Apr 1903
-
East Deering Hills. Annual reports to licence surrender for the period 27/4/1994 to 25/9/2003.
Mafic and ultramafic rocks of the Proterozoic Giles Complex, which have intruded highly metamorphosed basement units of the Musgrave Block in an area 360 km WNW of Marla, were considered to have potential to host massive Ni sulphide mineralisation,...-
Document
Published: 02 Apr 1903
-
Mount Chandler (Musgrave Ranges Project). Annual and final reports for the period 11/11/1996 to 10/11/1999.
Cu-Au-U prospects associated with shear zones and Kulgeran age granites have been identified in an area approximately 60 km north-west of Marla. Best assay results were obtained from the Indulkana Shear Zone, where rock chip sampling returned up to...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Davies (part of the Central Giles / Wingellina Nickel Project). Annual reports for the period 24/9/2009 to 23/9/2018.
Field work performed on the subject tenement during licence Year 8 included the conduct of Aboriginal heritage clearance surveys by the APY Traditional Owners to grant access for geological mapping and the acquisition of a trial seismic survey, as...-
Document
Published: 23 Nov 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Claude Hills. Annual reports for the period 31/5/2006 to 19/6/2017.
An area comprising three adjacent but separate sub-blocks in the Mount Davies district of the central Musgrave Ranges within South Australia was taken up afresh by the Metals X Group, through its wholly owned subsidiary Austral Nickel Pty Ltd, because...-
Document
Published: 15 Aug 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Caroline, Mount Harcus and Pine Ridge (the Musgrave Project). Joint annual reports for the period 1/7/2011 to 31/12/2018.
Three Exploration Licences spread across the central and eastern Musgrave Ranges are now being explored by NiCul Minerals Limited (a wholly owned subsidiary of PepinNini Minerals Limited) which currently owns 100% of each tenement. The ground held is...-
Document
Published: 28 Feb 1919
-
Data release [made at SA Director of Mines' discretion] : Hanging Knoll (part of the Central Giles Nickel Project). Annual reports to licence expiry/renewal, for the period 18/3/2002 to 17/3/2007.
A licence area located at the south-eastern end of the Mann Ranges in South Australia's Far North-west Aboriginal Lands, approximately 90 km south-southwest of Ayers Rock (Uluru), is being explored by Rio Tinto Exploration (RTE) and Delta Gold, as...-
Document
Published: 12 Apr 1907
-
The Musgrave Project. Joint annual reports for the period 5/10/2007 to 31/1/2012 [as later updated, to include additional licences, to 31/1/2017], plus respective successive full surrender final reports for individual licences.
The multi-licence Mithril - Barrick JV Musgrave Project area is centred 600 km south-west of Alice Springs, within the APY Lands of north-western South Australia. It is considered to be prospective for buried economic Ni-Cu-PGE sulphide mineral...-
Document
Published: 09 Oct 1917
-
Data release [made at SA Director of Mines' discretion] : Mount Hardy (part of the Central Giles Nickel Project). Annual reports to licence expiry/renewal, for the period 18/3/2002 to 17/3/2007.
A licence area located at the eastern end of the Deering Hills in South Australia's Far North-west Aboriginal Lands, approximately 150 km south-west of Ayers Rock (Uluru), is being explored by Rio Tinto Exploration (RTE) and Delta Gold, as part of...-
Document
Published: 12 Apr 1907
-
RB 2003/00020 MANN map sheet bedrock drilling program.
After two years of negotiation with traditional owners and the Anangu Pitjantjatjara Land Council, the Geological Survey Branch of PIRSA's Minerals, Petroleum and Energy Division (MPE) commenced stratigraphic drilling on the 15th May 2002, in the...-
Document
Published: 01 Dec 2003
-
RB 2003/00021 Musgrave Province - Geological summary and exploration history.
The Musgrave Province is largely incorporated within the Anangu Pitjantjatjara Lands and includes cratonic crystalline middle Proterozoic basement rocks of the Musgrave Province proper, as well as mantling younger sedimentary rock successions...-
Document
Published: 01 Nov 2003
-
RB 2003/00030 Hydrogeochemical assessment of the Musgrave Block.
The results of a 1982 State-wide hydrogeochemical survey showed the Musgrave Block to be anomalous and potentially mineralised. In 1997 a groundwater quality survey was undertaken for the remote communities in the Anangu Pitjantjatjara Lands. Water...-
Document
Published: 01 Dec 2003
-
RB 2012/00008 Abminga bedrock drilling program 2001.
The Abminga bedrock drilling program was initiated in 1999 as part of the Targeted Exploration Initiative of South Australia (TEISA) strategy conceived by the SA Government and implemented through PIRSA's Mineral Resources Group. Drilling was proposed...-
Document
Published: 01 May 2012
-
RB 2013/00010 Sm-Nd and Hf isotopic data of the Tieyon (5645) 1:100 000 mapsheet.
This report presents whole rock Sm-Nd and Hf in zircon results for 31 samples from the Tieyon 1:100 000 mapsheet area of the Musgrave Province, South Australia, acquired over the period 2007–2012 as part of the Musgrave Province mapping program. It is...-
Document
Published: 01 Aug 2013
-
RB 2012/00012 PACE Geochronology: Results of collaborative geochronology projects, 2011-2012.
This report presents the results of geochronology from projects completed during 2011 and 2012, which addressed rock samples collected from a number of different geological provinces within South Australia. The Musgrave Province in northern South...-
Document
Published: 01 Sep 2012