Data release - as updated : Goode Hill. Annual reports and final report to licence expiry/full surrender, for the period 27/6/2002 to 28/8/2015.
Exploration of an area of Neoproterozoic metasedimentary rocks bordering, and in part intruded by, Ordovician plutons of the Anabama felsic intrusive complex, has targeted possible analogues to the Blue Rose copper-gold skarn mineralisation...-
Document
Published: 04 Nov 1915
-
Data release - as updated [made at SA Director of Mines' discretion] : Outalpa (part of the Curnamona Project). Annual reports for the period 10/6/2012 to 9/6/2018.
The Outalpa (EL 3472) licence area, comprised of two separate sub-blocks respectively centred ~30 km north-northeast and ~45 km north-northwest of Manna Hill, is one of five adjacent tenements held by PepinNini Minerals within the eastern Adelaide...-
Document
-
Iron Peak. Progress reports and final report to licence expiry/full surrender, for the period 12/3/1986 to 11/3/1987.
Stratabound gold in rocks of the Adelaidean metasedimentary sequence was the target of exploration undertaken on Manunda Station, about 45 km south-east of Yunta. No significant gold values were detected in a programme of stream sediment bulk...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Wadnaminga and Outalpa (the Olary JV Project, later renamed the Blue Rose Project). Joint annual reports for the period 19/7/2008 to 18/7/2018.
During Year 12 of the Olary JV Project (2008-2009), field work was undertaken only on EL 3849 Outalpa to make up for the earlier underspending on that licence relative to commitments. In early 2009, a ground radioactivity survey was acquired using a...-
Document
Published: 27 Nov 1918
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Victor. Annual reports for the period 30/7/2012 to 29/7/2018.
A large area of the south-eastern Flinders Ranges piedmont plains lying ~50 km north-west of Manna Hill, and centred on Mount Victor, is being explored for possible economic buried Neoproterozoic stratabound iron ore of low grade but probable high...-
Document
-
Olary (part of the Braemar Iron Project). First partial surrender report, for the period 21/1/2008 to 20/1/2014.
A small, north-western part of a licence located immediately south of Olary township has recently been relinquished due to it having perceived minimal iron ore potential. The only work undertaken on the relinquished ground was the acquisition along...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Devonborough Downs (part of the Olary Project). Annual reports to licence expiry/renewal, for the period 22/10/2007 to 21/10/2012.
An area centred ~30 km south-east of Olary township is being explored for possible buried economic porphyry copper-gold deposits, as well as for any other substantial either Carlin-type, skarn-hosted, Telfer-style, or mesothermal gold mineralisation....-
Document
Published: 16 Nov 1912
-
Yunta. Progress reports to licence expiry/full surrender, for the period 12/11/1970 to 11/11/1971.
Exploration of an area that surrounds Yunta township, seeking possible economic hydrothermal gold or base metal deposits, has consisted of regional and detailed (1:4800 scale) geological mapping, plus stream sediment geochemical sampling (514...-
Document
Published: 05 May 1971