Data release - as updated [made at SA Director of Mines' discretion] : Outalpa (part of the Curnamona Project). Annual reports for the period 10/6/2012 to 9/6/2018.
The Outalpa (EL 3472) licence area, comprised of two separate sub-blocks respectively centred ~30 km north-northeast and ~45 km north-northwest of Manna Hill, is one of five adjacent tenements held by PepinNini Minerals within the eastern Adelaide...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo mine, Bonython Hill, Mutooroo West, Oratan [Rock] and Cutana (the Curnamona South Project). Joint annual reports for the period 1/1/2014 to 31/12/2015.
Several separate areas that cover ground straddling the major tectonic boundary between the Olary and Broken Hill domains of the southern Curnamona Province are being explored for possible economic buried stratabound Proterozoic iron ore, epithermal...-
Document
-
Mutooroo (latterly part of the Border JV Project). Second partial surrender report at licence expiry/renewal, for the period 16/1/1997 to 18/4/2017.
Four separate large portions of a long-held licence area abutting the SA/NSW state border in the vicinity of Mutooroo have been relinquished as part of statutory requirements. The following summary prepared by Minotaur Exploration describes work done...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Wadnaminga and Outalpa (the Olary JV Project, later renamed the Blue Rose Project). Joint annual reports for the period 19/7/2008 to 18/7/2018.
During Year 12 of the Olary JV Project (2008-2009), field work was undertaken only on EL 3849 Outalpa to make up for the earlier underspending on that licence relative to commitments. In early 2009, a ground radioactivity survey was acquired using a...-
Document
Published: 27 Nov 1918
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Victor. Annual reports for the period 30/7/2012 to 29/7/2018.
A large area of the south-eastern Flinders Ranges piedmont plains lying ~50 km north-west of Manna Hill, and centred on Mount Victor, is being explored for possible economic buried Neoproterozoic stratabound iron ore of low grade but probable high...-
Document
-
Olary (part of the Braemar Iron Project). First partial surrender report, for the period 21/1/2008 to 20/1/2014.
A small, north-western part of a licence located immediately south of Olary township has recently been relinquished due to it having perceived minimal iron ore potential. The only work undertaken on the relinquished ground was the acquisition along...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mutooroo West. Annual reports for the period 15/11/2005 to 14/11/2009.
There is no abstract created for this record-
Document
Published: 26 Nov 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Cutana. Annual reports for the period 25/7/2007 to 15/8/2013, and the "Curnamona South Project" annual report for the period 1/1/2017 to 31/12/2018.
During licence year 6, the commencing year of renewed EL 3895 Cutana, no work took place because Havilah's RC drilling rig, along with all company personnel, were fully occupied on completing the mining feasibility evaluation drilling programmes...-
Document
Published: 15 Apr 1919