-
Mount Britton. Annual and final reports for the period 19/10/97 to 18/10/99.
Limited percussion drilling (2 holes, total 446 m) of inferred dipolar aeromagnetic anomalies in the vicinity of Ross Creek, 140 km north-east of Marla, and subsequent mineralogical examination of heavy mineral concentrates obtained from the drilled...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Todmorden area. Progress reports for the period 4/10/89 to 3/4/91.
TARGET: Diamonds. EXPLORATION: Drilling (1 rotary hole totalling 306 m) over a possible buried kimberlitic diatreme identified from seismic and gravity surveys. RESULTS: No kimberlite was intersected.-
Document
Published: 22 May 1991
-
The Alberga Diamond Project. Joint progress and annual reports to licences' joint surrender, for the period 19/3/1998 to 16/6/2000.
Kimberlite-seeking loam sampling and soil geochemistry, undertaken in the vicinity of 28 selected magnetic targets distributed within eight separate licence areas extending from 150 km west-northwest of to 120 km north of Oodnadatta, only yielded a...-
Document