-
Lake Cadibarrawirracanna. Progress and final reports to licence expiry/full surrender for the period 3/6/1980 to 2/12/1980.
Thirty-two shallow auger holes up to 2.76 m deep were drilled into the floor of Lake Cadibarrawirracanna, situated 70 km west of William Creek, in a search for possible potash-rich brines trapped by the lake sediments. The lacustrine sediments were...-
Document
-
RB 77/00077 Coober Pedy town water supply. Groundwater prospects and completion report. Stuart Range bores 7-10.
Groundwater of salinity lower than 5000 mg/l was found to occur north of Coober Pedy at a distance of 20-30 km. Four holes (cumulative depth 274 m) were drilled and encountered water of salinity 4000-9000 mg/l. A production well will commence in the...-
Document
Published: 01 Jan 1977
-
RB 77/00059 Coober Pedy town water supply. Completion report. Stuart Range bores 5 and 6.
Two production water wells were drilled during March-May, 1974. The wells are located about 1 km apart within the Coober Pedy town area, and both draw upon the Cadna-Owie Formation. Salinity is uniformly high in both holes, at 16,600 - 16,700 mg/l....-
Document
Published: 01 Jan 1977
-
RB 90/00014 Explanatory Notes for the TALLARINGA 1:250 000 geological map.
There is no abstract created for this record-
Document
Published: 01 Mar 1991
-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Mabel Creek. Annual and final progress reports to licence expiry/full surrender for the period 3/12/1999 to 2/12/2003.
As part of an exploration project targeting possible large-scale opal occurrences hidden at depth beneath marine shale outcrops in the Stuart Range 'Breakaway' country, the subject licence was taken up to cover certain ground lying adjacent to the...-
Document
Published: 25 Jun 1903
-
Mount Willoughby. Annual reports to licence expiry/full surrender for the period 11/1/2001 to 10/1/2005.
Exploration for opal, carried out in an area of the Stuart Range located approximately 130 km north-northwest of Coober Pedy, has included a compilation of geological and opal occurrence data, photogeological interpretation of aerial photographs,...-
Document
-
Wintinna Coalfield hydrogeological study.
This report presents a description of the hydrogeology of the Wintinna coal deposit proposed mine site area, and of the investigative work performed to acquire specific data on aquifer properties and groundwater behaviour. Two production bores were...-
Document
Published: 14 Sep 1983
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
Ouldburra Hill. First annual and final report for the period 25/6/2002 to 24/6/2003.
A small area of opal workings examined near Ouldburra Hill, 35 km south-east of Marla, was thought to indicate local potential for finding and developing larger scale deposits. Research and review of available historic data showed that the area holds...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Starvation Lake. Progress reports and final report on regional exploration programme at licence surrender, for the period 13/1/1972 to 31/7/1972.
In a search for possible economic roll-front, blanket style uranium deposits within Tertiary sediments in part of the eastern Frome Embayment, the licensee undertook 1:75,000 scale geological mapping and exploratory auger drilling of the Quaternary...-
Document
-
Water resources assessment for Lake Phillipson, South Australia.
The Lake Phillipson coal deposits currently under consideration by Utah Development Company as a potential mine, are located in a remote and arid region of Australia. Surface water sources simply do not exist in this area and any development will...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-47 - [prospecting for] water in Permian palaeochannels draining the Mount Woods Inlier. Project final report.
Development of the Prominent Hill copper-gold deposit in the Mount Woods region will require an adequate source of water to support planned mining and ore processing operations, currently estimated to involve at least 6 million tonnes of ore per year....-
Document
Published: 10 Jun 1905
-
Data release - as updated : England Hill, Arckaringa and Copper Hill (the Arckaringa Coal Project). Joint annual reports and joint final report to licences' expiry/full surrender, for the period 7/6/2005 to 6/6/2019.
Under a new strategic focus, three licence areas covering three Early Permian buried coal deposits located at Wintinna, Westfield and Murloocoppie in the northern part of the Arckaringa Basin, ~120 km north of Coober Pedy, have been evaluated both for...-
Document
Published: 29 Aug 1919
-
Data release - as updated : Boundary Dam. Annual reports to licence expiry/full surrender, for the period 30/7/2007 to 29/7/2016.
A small area centred ~130 km north of Marla, and abutting the Northern Territory border along the northern side of Tieyon Station, has been explored for possible economic buried secondary uranium deposits, which Tianda Uranium (Tianda) thought could...-
Document
-
Coober Pedy. Annual reports to licence expiry/full surrender, for the period 1/11/2016 to 31/10/2019.
A large area situated on the north-eastern side of the Stuart Range, comprising three separate sub-blocks that taken together are centred ~20 km north of Coober Pedy township, has been explored for possible economic near-surface accumulations of the...-
Document
-
Conference poster - [Phanerozoic] Geology of the Peake and Denison Ranges area.
This poster was exhibited to accompany a talk presented by the authors at the 1st Eromanga Basin Symposium, Adelaide, 9-11 November 1982 (the talk abstract is indexed separately).-
Document
-
Coober Pedy. First partial surrender report, for the period 1/11/2016 to 31/10/2018.
An area located immediately east and north-east of Coober Pedy is being explored for possible economic near-surface accumulations of the evaporite industrial mineral epsomite. Historic drilling and costeaning in this area performed by CRA Exploration...-
Document
-
Mount Morgan and Tent Hill (Stuart Creek Project). Progress and final reports from 8/1/82 to 7/1/84.
Negative heavy mineral sampling results and a lack of magnetic anomalies suggest that two areas located south-west of Lake Eyre South have little potential for diamonds and / or kimberlites.-
Document