-
RB 78/00117 Bumbarlow 1 - Well completion report.
Bumbarlow 1 (TD 720.33 m) aimed to test the lithology and petroleum potential of the Cambrian section in the central part of the eastern Arrowie Basin. It continuously cored a sequence over 300 m thick of flat-lying Proterozoic sediments interbedded...-
Document
Published: 01 Sep 1978
-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
1981 and 1982 seismic surveys, Wertaloona and Christmas Creek-ARR, final report.
Wertaloona Seismic Survey - AIM:The 1981 Wertaloona Seismic Survey programme was designed by the PELs 5 and 6 Arrowie Block partners to provide the first high quality, multifold seismic reflection data in the area of likely preserved thick Cambrian...-
Document