Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 1906
-
ELs 4678 - 4689 (the Oodnadatta Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 22/2/2011 to 9/9/2014.
The Oodnadatta Project consisted originally of twelve exploration licenses covering 7125 square km in far northern South Australia, this mainly being ground situated to the south and south-east of Oodnadatta. Uranium Equities Limited (UEQ) believed...-
Document
Published: 28 Oct 1914
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Lake Frome Project. Individual licence annual reports, joint annual reports and final reports to various constituent licences' joint full surrenders, for the period 16/4/2009 to 5/6/2015.
An area centred ~36 km west of Quinyambie Homestead has been explored for possible buried economic sedimentary uranium mineralisation of palaeochannel hosted roll-front style that may have formed in relatively more distal Tertiary basinal sediments,...-
Document
Published: 30 Mar 1915
-
Data release - as updated : Boundary Dam. Annual reports to licence expiry/full surrender, for the period 30/7/2007 to 29/7/2016.
A small area centred ~130 km north of Marla, and abutting the Northern Territory border along the northern side of Tieyon Station, has been explored for possible economic buried secondary uranium deposits, which Tianda Uranium (Tianda) thought could...-
Document
-
Rawlinson Hill, Mount Sabine, Snow Hill and Billa Kalina Homestead (Stuart Shelf / Arckaringa Basin). Joint progress reports to licence expiry/full surrender, for the period 12/2/1981 to 28/4/1987.
Over the report period Agip Australia completed the drilling and geophysical logging of 39 open rotary holes totalling 3845 m to investigate if economic coal seams occur within Permian sediments of the southern Arckaringa Basin. Although the Permian...-
Document
-
ExpNotes WINTINNA: Explanatory Notes WINTINNA
A new generation, first edition WINTINNA 1:250 000 scale geological map and explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's geological mapping program undertaken in the...-
Document
-
Mundowdna, Wilpoorinna, Dalarinna Hill and Calcutta (the Marree Project). Combined annual reports plus final reports to licences' respective expiry or surrender, for the period 21/6/2006 to 29/5/2014.
The Marree Project consists of four adjacent exploration licences, ELs 3574, 3577, 3578 and 3579, which together cover 3909 square km. Work performed on the project was governed by the Eromanga Basin joint venture agreement made between Eromanga...-
Document
Published: 30 May 1914
-
Billa Kalina, Welcome Creek, Millers Creek, Margaret Creek and Francis Swamp (the Billa Kalina G2 Diamond Project). Data release made at remaining licences' joint partial surrender: joint annual reports for the period 25/2/2006 to 29/8/2012.
As part of continuing diamond exploration on the subject five licences, more of the first pass sampling program was completed by Flinders Diamonds in August 2006 via aircore drilling of 47 vertical holes for an aggregate 1852 m aimed at penetrating to...-
Document
Published: 10 May 1912
-
Calcutta (subject to the Marree JV Project). First partial surrender report at licence expiry/renewal, for the period 21/6/2006 to 20/6/2011.
An area located along the southern margin of the Eromanga Basin 53 km east-northeast of Farina, which is crossed by part of the Strzelecki Track, has been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones,...-
Document
-
Francis Swamp, Stuart Creek, Binda Bounda and Margaret Creek (part of the Lake Eyre Project). Final report at licences' joint full surrender, for the period 4/4/2011 to 29/5/2012.
A project area comprising four mineral exploration tenements located south-west of Lake Eyre South, between Marree and William Creek, has been targeted for possible sandstone-hosted uranium deposits that might have formed within Cretaceous strata of...-
Document
Published: 15 Jun 1912
-
The Lake Eyre Project. Joint first annual report plus final report to project licences' joint full surrender, for the period 3/5/2011 to 7/3/2013.
A large area surrounding the southern end of Lake Eyre, which is known to be underlain by a thinning succession of Cretaceous basinal sediments, was taken up to explore for possible economic secondary sandstone-hosted uranium mineralisation. No field...-
Document
Published: 27 Mar 1913
-
Data release - as updated : Phar Lap Outstation. Annual reports plus final report to licence expiry/full surrender, for the period 27/8/2007 to 26/8/2017.
An area centred ~85 km south-southeast of Coober Pedy, at the southern margin of the Lake Phillipson Trough, a long active tectonic feature now occupied by deep sedimentary fill, was taken up by a wholly-owned subsidiary to Monax Mining Ltd primarily...-
Document
Published: 24 May 1917
-
Data release - as updated [made at SA Director of Mines’ discretion] : Wooltana. Annual reports for the period 8/8/1997 to 23/9/2009.
Exploration for possible economic buried sedimentary uranium mineralisation within a large portion of the north-western Frome Embayment located immediately south of the Beverley uranium deposit and covering the southern end of the Poontana Sub-basin,...-
Document
Published: 23 Nov 1909
-
Blyth Creek. Annual reports and final report to licence surrender, for the period 2/1/2007 to 30/9/2013.
Exploration for possible economic IOCG type base and precious metal deposits in buried basement rocks, and for possible roll front style sedimentary uranium mineralisation in overlying Jurassic-Cretaceous Eromanga Basin sediments, within an area...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-26 - Energia Minerals Limited Gawler Craton Project, IOCG-prospective Blyth Creek BC4 gravity anomaly. Drilling project final report.
During July 2012, at a location approximately 90 km south-east of Oodnadatta, EL 3680 licensee Energia Minerals completed the drilling at the BC4 gravity anomaly target of a single vertical rotary mud/diamond tailed hole to a total depth of 144.3 m...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-05 - Areva Resources Australia Pty Ltd, Denison Range Project, eastern flank Mesozoic sandstone-hosted uranium targets. Drilling project final report.
Areva's Denison Range Project is targeting possible economic sandstone-hosted uranium mineralisation that may have formed within the Mesozoic sandstones located to the east of exposed uranium-rich basement rock sequences of the Palaeo- to...-
Document
Published: 29 Aug 1913
-
Balta (part of the Edward Creek Project). Annual reports and final report to licence expiry/full surrender, for the period 9/10/2000 to 17/7/2010.
An area located approximately 35 km west and south-west of Anna Creek Homestead, straddling the Coober Pedy - William Creek Road, was taken up to explore for possible buried diamondiferous kimberlite intrusions that could be the source(s) of the...-
Document