-
RB 78/00117 Bumbarlow 1 - Well completion report.
Bumbarlow 1 (TD 720.33 m) aimed to test the lithology and petroleum potential of the Cambrian section in the central part of the eastern Arrowie Basin. It continuously cored a sequence over 300 m thick of flat-lying Proterozoic sediments interbedded...-
Document
Published: 01 Sep 1978
-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Lake Coontayunta. Progress reports and final report to licence full surrender, for the period 4/1/1979 to 18/12/1979.
An exploration licence area covering the projected northerly trending, buried portion of the Precambrian Benagerie Ridge basement was taken up by CRA to explore principally for possible secondary sandstone-hosted uranium mineralisation in Tertiary and...-
Document
Published: 30 Nov 1979
-
Data release - as updated [made at SA Director of Mines’ discretion] : Wooltana. Annual reports for the period 8/8/1997 to 23/9/2009.
Exploration for possible economic buried sedimentary uranium mineralisation within a large portion of the north-western Frome Embayment located immediately south of the Beverley uranium deposit and covering the southern end of the Poontana Sub-basin,...-
Document
Published: 23 Nov 1909