-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-12, Chianti mineral prospect. Project final report.
The subject report describes the results of drilling two fully cored rotary holes totalling 1161.10 m at the Chianti prospect, an unusually-shaped residual gravity anomaly located in Gunson Resources' EL 3264, 20 km north-east of the Mount Gunson...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 30/7/2003 to 6/10/2009.
The subject EL 3112 ground represents the continuation of tenure by Gunson Resources, over the same area, from its former EL 2516 Yeltacowie (for which see the relevant licence reports previously released in Envs 9530 and 9715). This replacement...-
Document
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Oak Dam North-east, Lake Torrens, Glenside, Winjabbie and Trimmer Inlet; plus Shore Hill and Red Swamp (initially the UXA Stuart Shelf South JV Project; then OZ Minerals' Stuart Shelf Project). Joint annual reports for the period 1/11/2010 to 6/1/2017.
In continued exploration for possible economic buried Olympic Dam or Prominent Hill type IOCG style mineralisation that may exist within Proterozoic bedrock, joint venture operator Straits Resources undertook the following work on the project...-
Document
Published: 06 Mar 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Island Dam, Stuart Shelf and Andamooka Ranges (the Stuart Shelf Project). Joint annual reports for the period 11/10/2009 to 30/6/2018.
Exploratory drilling carried out by BHP Billiton (BHPB) during the 2009-10 project reporting year took place at six prospects thought to have good IOCG mineralisation potential, based in part on earlier drilling results and also on refined target...-
Document
Published: 30 Aug 1918
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty Lagoon. Annual reports for the period 27/6/2007 to 22/7/2018.
Continuing exploration for possible buried economic IOCG mineralisation on the western side of an area located between Lake Torrens and Pernatty Lagoon, under tenure of renewed EL 3854, was focussed on determining mineral systems geochemical...-
Document
Published: 23 Aug 1918
-
Mount Gunson and Mount Moseley (part of the Mount Gunson JV Project). Partial surrender reports, for the overall tenure period 15/7/1994 to 25/5/2021.
No exploration work has been undertaken on either of the recently relinquished portions of the two subject licences. Within the JV project tenements, exploration targets being addressed are: (1) possible economic buried IOCG (iron oxide-associated...-
Document
Published: 17 Oct 1918
-
Woordlemmie (aka the Mount Gunson South Project). First partial surrender report, for the period 22/6/2011 to 21/6/2018.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings is being explored for possible buried economic base metal deposits that may exist in a variety of geological settings and...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release - as updated : Woordlemmie. Annual reports to licence full surrender, for the period 22/6/2011 to 22/11/2019.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings, covering ground adjacent to the south-western and southern margins of Pernatty Lagoon, has been explored for possible buried economic...-
Document
Published: 26 Nov 1919
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1998 to 17/10/2008 [ Index Part 2 of 4 ].
Stuart Metals is primarily exploring EL 1946 for stratiform copper mineralisation of the various styles known to be present in the Mount Gunson district. In addition, the company regards the largely unknown Mesoproterozoic basement to have strong...-
Document
-
Lake Torrens South, Beda Arm and Carrapateena Arm (latterly the Lake Torrens Joint Venture Project). Annual reports (singular and combined) to licences' respective expiry/renewal, for the period 21/2/1996 to 7/1/2008.
Economic Olympic Dam style iron oxide - associated copper-gold (IOCG) mineralisation has been the target of exploration carried out in three adjoining areas which together extend for about 55 to 170 km north of Port Augusta, covering southern Lake...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium for the period 11/10/1996 to 10/10/2009 [ Index Part 1 of 2 ].
The four Stuart Shelf Joint Venture Project exploration licences collectively cover approximately 2668 square km of semi-arid pastoral land surrounding the Olympic Dam mine and extending east and south-eastwards as far as Lake Torrens [the Olympic Dam...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 7/10/2009 to 6/10/2013.
New work undertaken on EL 4187 during the 2009-2010 licence year has included: • Ongoing documentation and interpretation of MGD 55 & 56 • Drilling of MGD57 to 1243 m at Emmie Bluff prospect • Down hole EM and IP logging of MGD57 •...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby and Acropolis South. Joint annual reports, plus EL 3762 fifth annual report to licence sale, for the period 4/5/2009 to 3/5/2012.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 3761 (North Roxby) and EL 3762...-
Document
-
Pernatty. Annual reports to licence expiry/full surrender, for the period 20/3/2018 to 19/3/23.
The Pernatty Project is located approximately 20 km SSE of the IOCG deposit at Carrapateena, within Exploration Licence 6137. The area was initially targeted by Tasman Resources Ltd due to available geophysical data, the possibility of reasonable...-
Document
Published: 25 Mar 1923
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-07 - Intercept Hill JV Project, central Stuart Shelf area - Oak Dam South Proterozoic basement IOCG mineral prospects. Drilling project final report.
The Intercept Hill Project area is located in the central part of the Stuart Shelf. Gawler Craton basement rocks in the project area comprise leucocratic granite of the Hiltaba Suite, volcanic rocks of the Gawler Range Volcanics and metasediments of...-
Document
-
Mount Gunson (part of the Mount Gunson Project). Fourth partial surrender report, for the period 16/6/1994 to 30/06/2012.
No field work has been conducted by the project JV partners on the now relinquished southern portion of the subject licence, as no IOCG or other mineral targets had been identified there. A discussion of previous exploration highlights, i.e. drilling...-
Document