-
RB 55/00006;Amdel 00126 Accessory minerals of South Australian granites.
The purpose of the work described was to compare and contrast the petrography, accessory minerals, and absolute ages of 25 granitic and allied rock samples collected from widely scattered localities in South Australia. The processes that are...-
Document
Published: 01 Aug 1961
-
RB 92/00037 Review of mineral exploration, KINGOONYA 1:250 000 map area.
This report was prepared as a summary of all open file mineral exploration data from the KINGOONYA 1:250000 mapsheet area that are held in the SADME records management Envelope system. The aim of the holdings review was to describe past exploration,...-
Document
Published: 29 Nov 1991
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-22, Lake Gilles - Corunna North area (north-western margin of Spencer Domain) IOCG mineral prospects. Project final report.
Potential Carrapateena or Prominent Hill style IOCG targets represented by newly recognised gravity anomalies in the eastern Lake Gilles area were the reason for a PACE Initiative Year 4 drilling funds proposal submitted to PIRSA by InterMet...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-14, Pernatty Lagoon area (eastern Gawler Craton) IOCG mineral prospects. Project final report.
PACE proposal DPY3-14 aimed to discover a new iron oxide - associated copper-gold (IOCG) mineralised magmatic centre, similar to the Olympic Dam setting, within the eastern margin of the Gawler Craton. The Pernatty Lagoon project is located less than...-
Document
Published: 20 Sep 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-46, western Gawler Range Volcanic Province mineral prospects. Project interim and final reports.
An area of the Gawler Range Volcanic Province that straddles the southern portion of the Yarlbrinda Shear Zone, 80 km south of Kingoonya, and which contains mylonitised and sericite-altered Palaeoroterozoic intrusive rocks, was the target for three...-
Document
-
Partridge Range (part of the Gibraltar Joint Venture Project). Annual reports and final report to licence full surrender, for the period 4/3/1997 to 3/12/2008.
Exploration of an area with poor basement outcrop, located approximately 45 km north-east of Tarcoola, primarily sought possible fault or breccia-hosted mesothermal gold +/- base metal mineralisation in likely multiphase Mesoproterozoic felsic...-
Document
Published: 12 Aug 1908
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Data release [made at SA Director of Mines' discretion] : The Twins (part of the South Mount Woods Joint Venture). Annual reports to licence expiry/renewal, for the period 7/3/2002 to 6/3/2007.
An area covering ground adjacent to the southern boundary of current EL 3056 (formerly EL 2483), on which licence the newly discovered (in November 2001) Prominent Hill IOCG deposit is situated, is being explored for similar style buried...-
Document
Published: 03 Apr 1907
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-28 - Cultana district, Eyre Peninsula, Extension Tank shear-hosted Mesoproterozoic IOCG-U or porphyry type Au and base metal prospect. Drilling final report.
An area centred approximately 50 km south-west of Port Augusta is being explored for buried economic occurrences of gold, base metals and uranium primary mineralisation which may be genetically associated with the past emplacement there of the Gawler...-
Document
-
Heartbreak Hill. First partial surrender report, for the period 27/9/1996 to May 1999.
Regional and infill calcrete sampling over two now relinquished licence sub-areas lying respectively 10 km north and 25 km south-east of Tarcoola identified minor, slightly elevated Au and Cu values in both areas. Follow-up rock chip sampling and...-
Document
-
Roopena and Iron Knob. Joint progress reports, joint annual reports and final report to licences' joint full surrender, for the period 22/4/1992 to 23/2/2000.
Exploration for Mount Isa style, Fe-oxide associated Cu-Au mineralisation has targeted Whyalla Group metasediments and associated Hiltaba Suite granitic intrusions within a 110 km long x 15 km wide, north - south aligned corridor situated west of...-
Document
-
Minnipa. Data release made in lieu of submitting a first partial relinquishment report : annual reports for the period 7/6/1996 to 6/6/1999.
Within an area spanning the Eyre Highway between Pygery and Karcultaby, acquisition of an airborne magnetic/radiometric survey was followed by calcrete geochemical sampling. Twenty-eight aircore holes (total 1616 m) were drilled at three prospects to...-
Document
Published: 15 Nov 1999
-
Tarcoola. Data release made in lieu of a 25% first partial relinquishment at licence renewal: [Part 2 of 2] progress reports for the period 19/7/1984 to 6/12/1990. Part 1 of 2 also included.
Exploration of the Tarcoola Gold Field by Aberfoyle Resources began in mid-1984, following a partial relinquishment of other ground at licence renewal, when some promising gold assay values were detected from rock and mine dump sampling. Geological...-
Document
-
Yardea. Annual reports to licence expiry/full surrender, for the period 7/6/1996 to 6/6/1998.
Regional calcrete geochemical sampling carried out approximately 140 km north-east of Streaky Bay has outlined a northeasterly-trending 5 km x 1.5 km area containing weakly anomalous gold values of 3-9 ppb Au (Toondulya prospect), which appear to be...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-13, Gemini mineral prospect. Project final report.
The Mount Woods South Joint Venture (Adelaide Resources Ltd and Perilya Ltd) successfully made application for a share of the SA Government's PACE Initiative funding in 2004 to test geophysical anomalies located on EL 2901 which were defined by...-
Document
-
Data release - as updated : Bulgunnia. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
An area centred approximately 70 km north-northeast of Tarcoola has been explored for possible economic buried basement-hosted IOCG style or other (e.g. Menninnie Dam and/or Mount Gunson type) altered rock facies - hosted metallic mineralisation,...-
Document
Published: 27 Oct 1922
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Data release : Yeltacowie, Pernatty [Station] and Whittata (the Punt Hill IOCG Project). Joint annual reports, plus final report to expiry of EL 5774 Punt Hill, for the period 7/1/2012 to 6/1/2017.
During the eighth, 2012-2013 year of tenure of the Pernatty EL area, now being explored in concert with two other adjoining Punt Hill IOCG Project licences, Monax reviewed its past drillhole data, undertook further processing of the project's amassed...-
Document
Published: 29 Aug 1917