-
North Fowlers Bay - Chundaria. Annual reports and progress reports for the periods 15/9/1993 to 14/9/1998, and 28/10/1998 to 12/3/1999.
North Ltd's Barton Project commenced in 1990 across a number of licences progressively taken out over the western Gawler Craton, which eventually came to include EL 1865. Initial exploration for heavy mineral sand in the Barton-Ooldea area, 100-200...-
Document
Published: 06 May 1999
-
Carnding. Data release made in lieu of submitting a second partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 29/9/1994 to 16/1/2005.
Renewed brownfields gold exploration in an area situated 20-40 km north and west of the Tarcoola Goldfield, previously held in part by the licensee as EL 1848, was prompted by the May 1995 success of the Samantha/Resolute/Dominion corporate joint...-
Document
Published: 28 Jul 1905
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-46, western Gawler Range Volcanic Province mineral prospects. Project interim and final reports.
An area of the Gawler Range Volcanic Province that straddles the southern portion of the Yarlbrinda Shear Zone, 80 km south of Kingoonya, and which contains mylonitised and sericite-altered Palaeoroterozoic intrusive rocks, was the target for three...-
Document
-
Partridge Range (part of the Gibraltar Joint Venture Project). Annual reports and final report to licence full surrender, for the period 4/3/1997 to 3/12/2008.
Exploration of an area with poor basement outcrop, located approximately 45 km north-east of Tarcoola, primarily sought possible fault or breccia-hosted mesothermal gold +/- base metal mineralisation in likely multiphase Mesoproterozoic felsic...-
Document
Published: 12 Aug 1908
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
ELs 4653 - 4661 (the Marla Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 25/1/2011 to 9/9/2014.
Nine licence areas occupying a 70 km x 30 km region overlying a west-northwest trending structural corridor situated along the northern margin of the Gawler Craton, have been explored for possible buried large-scale deposits of iron oxide - associated...-
Document
Published: 23 Oct 1914
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-28 - Cultana district, Eyre Peninsula, Extension Tank shear-hosted Mesoproterozoic IOCG-U or porphyry type Au and base metal prospect. Drilling final report.
An area centred approximately 50 km south-west of Port Augusta is being explored for buried economic occurrences of gold, base metals and uranium primary mineralisation which may be genetically associated with the past emplacement there of the Gawler...-
Document
-
Roopena and Iron Knob. Joint progress reports, joint annual reports and final report to licences' joint full surrender, for the period 22/4/1992 to 23/2/2000.
Exploration for Mount Isa style, Fe-oxide associated Cu-Au mineralisation has targeted Whyalla Group metasediments and associated Hiltaba Suite granitic intrusions within a 110 km long x 15 km wide, north - south aligned corridor situated west of...-
Document
-
Seven Mile Swamps (part of the Euria Project). Annual report and progress report to licence full surrender, for the period 31/5/1996 to 10/2/1998.
Calcrete sampling, mapping, and RAB and aircore drilling (211 holes, total 7334 m) were carried out 20 km north of Penong, in an area underlain by Hiltaba Suite granitoids, Archaean gneisses and a major associated shear zone. Although geochemical...-
Document
Published: 18 Dec 1997
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-36, Roopena area copper/gold mineral prospects. Project interim and final reports.
Three previously untested, significant gravity anomalies were the targets for 4 exploratory vertical RC drillholes totalling 750 m, put down in areas west and north-west of Whyalla by Minotaur Exploration with funding assistance from PIRSA through its...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-18 - Phoenix Copper Limited Yorke Peninsula Project. Drilling project final report.
Phoenix Copper is exploring tenements which cover an area of approximately 802 square km on the west coast of the Yorke Peninsula, the company's prime objective being to discover an economic iron oxide - associated copper-gold-uranium (IOCGU) deposit...-
Document
Published: 13 Nov 1912
-
The Gawler Craton Project [Part]. Data release made in lieu of partial surrender/joint annual reports for the period 3/2/2010 to 1/2/2019, plus letters giving permission to release owed licence partial relinquishment and surrender reports.
As part of a regional search for possible major deposits of IOCG type mineralisation, Golden Cross Resources took up six exploration tenements in the northern Gawler Craton that lie to the north and north-east of Coober Pedy, and which are within or...-
Document
Published: 23 Jun 1915
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Morgans (part of the East Eyre Peninsula Project). Annual reports for the period 17/1/2012 to 16/1/2019.
An area of mainly covered bedrock consisting of two separate sub-blocks bordering the south-eastern Gawler Ranges, which is considered prospective for finding buried hypogene IOCG mineralisation and possible stratiform and metamorphic base metals in a...-
Document
Published: 21 Mar 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Iron Baron. Annual reports for the period 4/4/2011 to 3/4/2019.
An attenuated licence area centred ~80 km south-west of Port Augusta is being explored for possible buried IOCG-U mineralisation and shear-hosted uranium deposits that may be associated with parts of the Roopena Fault and the Kalinjala Mylonite Zone....-
Document
Published: 16 Apr 1919
-
Data release [made at SA Director of Mines’ discretion] : Cocata and Warramboo (part of the Eyre Peninsula Project). Annual reports and joint annual reports to licences' joint expiry/renewal, for the period 7/6/1996 to 5/6/2001.
Two adjacent licence areas forming part of a contiguous set of project tenements in the central Eyre Peninsula region are being explored by Adelaide Resources (AR) primarily for gold and base metals, which it is thought may occur in buried deposits...-
Document
Published: 28 Aug 1901
-
Cultana. Annual reports to licence expiry/full surrender, for the period 13/9/2012 to 12/9/2017.
An area centred ~50 km south-west of Port Augusta has been explored for possible economic buried VHMS or porphyry style copper mineralisation and for primary uranium mineralisation hosted by basement rocks within this part of the southern portion of...-
Document
Published: 28 Nov 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 31/5/2010 to 31/12/2014.
A large part of the Harris Greenstone Domain basement tectonostratigraphic block, extending from 10 km to 130 km west of Kingoonya, is being explored for possible buried economic gold, nickel and other base metal mineralisation which may be associated...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports for the period 17/2/2010 to 20/6/2015.
During the sixth licence year, in February 2011, new licence owner Marmota Energy Limited ('Marmota') undertook a reconnaissance biogeochemical survey at the Pundinya prospect, collecting 54 x 30 g grab samples of vegetation of Mulga trees, in the...-
Document
Published: 06 Oct 1915
-
Kokatha prospect final report.
27 rotary drill holes (total 213m.) tested for copper-nickel mineralisation associated with a gabbro margin. It was concluded that copper-nickel values of several hundred parts per million is restricted to a small area near the gabbro/hornfels...-
Document
Published: 01 Jan 1969