-
South Vivian [Homestead]. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2007 to 11/6/2009.
An area located on the northern Stuart Shelf between Olympic Dam and Prominent Hill, approx. 50 km south-southwest of the latter, has been explored for possible Olympic Dam type iron oxide - associated copper-gold (IOCG) deposits and for Canadian...-
Document
Published: 17 Oct 1909
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Data release [made at SA Director of Mines' discretion] : Mullaquana. Annual reports for the period 20/11/2006 to 19/11/2009.
A tenement area located close to and along the eastern seaboard of the Eyre Peninsula, and which extends from Whyalla southwards for approximately 60 km, has been taken up to explore for possible economic buried primary, hard rock hosted uranium and...-
Document
Published: 20 Jun 1910
-
Mount Arden (part of the Six Mile Hill Project). First annual report, plus second annual/final report to licence expiry/full surrender, for the period 13/10/2014 to 12/10/2016.
An irregular area covering pastoral land ~15 km to the immediate west and north-west of Port Augusta has been explored for possible economic buried IOCG and other significant metallic mineralisation, which could have formed in the vicinity of the...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-36, Roopena area copper/gold mineral prospects. Project interim and final reports.
Three previously untested, significant gravity anomalies were the targets for 4 exploratory vertical RC drillholes totalling 750 m, put down in areas west and north-west of Whyalla by Minotaur Exploration with funding assistance from PIRSA through its...-
Document
-
Maitland. First partial surrender report, for the period 25/8/2008 to 24/8/2015.
58 square km of the Area C southernmost sub-block of EL 5320 have been relinquished to compensate for a shortfall in exploration spending against commitments. During the past seven years, the only work performed on the relinquished ground was the...-
Document
Published: 20 Mar 1916
-
Data release - as updated : Crystal Brook and Port Pirie (the Wandearah Project). Joint annual reports to licences' respective full surrenders, for the period 2/8/2008 to 26/4/2018.
Buried basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation of either Moonta-Wallaroo or Olympic Dam style is the target of ongoing exploration on the two adjacent subject tenements. In addition, the current holder considers that...-
Document
Published: 29 May 1918
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-18 - Phoenix Copper Limited Yorke Peninsula Project. Drilling project final report.
Phoenix Copper is exploring tenements which cover an area of approximately 802 square km on the west coast of the Yorke Peninsula, the company's prime objective being to discover an economic iron oxide - associated copper-gold-uranium (IOCGU) deposit...-
Document
Published: 13 Nov 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Mount Gunson and Mount Moseley (part of the Mount Gunson JV Project). Partial surrender reports, for the overall tenure period 15/7/1994 to 25/5/2021.
No exploration work has been undertaken on either of the recently relinquished portions of the two subject licences. Within the JV project tenements, exploration targets being addressed are: (1) possible economic buried IOCG (iron oxide-associated...-
Document
Published: 17 Oct 1918
-
Port Hughes. Annual reports and final report to licence full surrender, for the period 29/11/2010 to 17/8/2017.
A licence consisting of three separate small sub-blocks that cover a large number of freehold broad-acre farms in the Bute - Agery - Moonta South district has been explored for possible buried economic IOCG mineralisation, which may have formed on or...-
Document
Published: 31 Aug 1917
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
RB 2022/00007 40Ar/39Ar geochronology from AuScope National Argon Map samples, Gawler Craton, South Australia.
The National Argon Map was an AuScope-funded pilot project (2020–2021). The project aimed to compile a national-scale map of and to analyse new samples to fill the gaps in national coverage in 40Ar/39Ar geochronology. This report provides the results...-
Document
Published: 01 Jul 2022
-
Oak Dam (part of the Gawler Craton Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 17/7/2006 to 16/7/2011.
EL 3603, located on the Stuart Shelf approximately 50 km south of Olympic Dam, was taken under licence to explore for possible economic iron oxide - associated copper-gold-uranium (IOCG-U) deposits of Olympic Dam style that may have formed in...-
Document
Published: 28 Sep 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Winjabbie. Annual reports to licence expiry/renewal, for the period 20/10/2005 to 19/10/2010.
An almost wholly sand dune - covered area of the west-central Stuart Shelf, centred about 15 km north-northeast of Woomera township, is being explored for possible economic buried IOCGU mineralisation that may be hosted by Mesoproterozoic basement...-
Document
Published: 14 Dec 1910
-
PACE 2020 Initiative : PACE Targeting, Year 1 partnership no. 4 - western Yorke Peninsula versatile time domain electromagnetic (VTEM) airborne geophysical survey. Project PT1-04 final report.
During November-December 2011 a helicopter-borne VTEM survey was flown over the northern portions of Phoenix Copper Ltd’s (Phoenix) ELs 4031 and 4312 on western Yorke Peninsula to test for Cu-Au mineralisation in Hiltaba Suite rocks (host to the...-
Document
Published: 22 Feb 1912
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 1 of 2].
An area on the Stuart Shelf which is centred ~45 km north-northwest of Mount Gunson and 70 km south-east of Olympic Dam was taken up to explore primarily for possible economic buried Mesoproterozoic basement-hosted copper-gold deposits, perhaps of...-
Document
Published: 15 Nov 1913
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-02, evaluation of the Vulcan IOCGU mineralised system. Project final report.
Tasman Resources has discovered a new potential iron oxide - associated copper-gold-uranium (IOCGU) ore deposit at the Vulcan prospect, located 30 km north-northeast of Olympic Dam. The prospectivity of the Mesoproterozoic basement rocks in this...-
Document
Published: 28 Sep 1910
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 2 of 2].
In March 2010, once the terms of the joint venture agreement had been finalised, Argo passed its complete data sets to Xstrata, who immediately commenced a re-logging of Argo's drill cores besides conducting comprehensive unconstrained 3-D modelling...-
Document
Published: 15 Nov 1913