-
RB 97/00057 Gawler Craton excursion guide - September 21-26, 1997.
This 5-day field excursion was mounted by the GSSA to inform government and industry participants about significant newly identified geological features within the central Gawler Craton which are the subjects of ongoing study. The itinerary chosen...-
Document
Published: 19 Sep 1997
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 3 partnership no. DPY3-55, Glenloth Goldfield mineral prospects. Project final report.
Historical workings at the Glenloth Goldfield were the target for 10 exploratory RC drillholes put down by Minotaur Exploration during May-June 2006 as a PACE Initiative Year 3 project. Their accepted proposal was to drill a series of RC percussion...-
Document
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
Glenloth (part of the Tarcoola Joint Venture Project). First partial surrender report, for the period 11/7/2003 to 2/11/2009.
When exploring for nickel sulphide mineralisation within buried ultramafic rocks of the Archaean Lake Harris Greenstone Belt, over TEMPEST aerial EM anomalies lying ~16 km north-west of Yerda Outstation, Mithril Resources carried out a ground EM...-
Document
-
Data release [made at SA Director of Mines' discretion] : Lake Labyrinth West - Lake Harris West area (the Glenloth JV Project). Annual reports to licence expiry/renewal, for the period 25/5/1998 to 10/7/2008.
Continued exploration for Archaean lode-style gold and Mesoproterozoic Hiltaba Suite granite-related hydrothermal Cu-Au within the retained southern former subarea 'B' of EL 2518 located ~40 km south-east of Tarcoola, where there is also potential...-
Document
Published: 08 Oct 1908
-
RB 2003/00017 Gawler Craton 2003. State of play - The Excursion.
Following on from the highly successful Gawler Craton - State of Play 2002 conference held by PIRSA in Adelaide in December 2002, the Gawler Craton Team of PIRSA's Geological Survey Branch has recently undertaken a major excursion across the craton....-
Document
Published: 01 Sep 2003
-
RB 2002/00011 Harris Greenstone Domain bedrock drilling, May-August 2001.
The Harris Greenstone Domain bedrock drilling program - Phase 1, carried out during May to August 2001, has determined depths to basement, the basement lithology, and has outlined areas of anomalous gold, nickel and chromium geochemistry within...-
Document
Published: 01 Jul 2002
-
Lake Labyrinth (part of the Gawler and the Labyrinth Joint Venture Projects). Data release at second partial relinquishment : project licences' combined annual reports for the period 27/8/1999 to 28/9/2008.
In a continuation of exploration for economic deposits of gold and base metal mineralisation in the Lake Labyrith area, joint venture operator MIM Exploration carried out a proprietary 'MIMDAS' geophysical survey (utilising combined dipole-dipole IP...-
Document
Published: 18 Mar 1909