-
Botenella Range (now part of the Wilcherry Hill JV Project). Progress, annual and final reports to the commencement of the project licences' combined reporting status, for the period 14/2/1991 to 18/9/2002.
Exploration of an area lying west of Lake Gilles concentrated initially on assessing its potential for hosting syngenetic Palaeoproterozoic stratiform base metal deposits along perceived stratigraphic extensions of the beds containing the recently...-
Document
Published: 16 Oct 1903
-
Partridge Range (part of the Gibraltar Joint Venture Project). Annual reports and final report to licence full surrender, for the period 4/3/1997 to 3/12/2008.
Exploration of an area with poor basement outcrop, located approximately 45 km north-east of Tarcoola, primarily sought possible fault or breccia-hosted mesothermal gold +/- base metal mineralisation in likely multiphase Mesoproterozoic felsic...-
Document
Published: 12 Aug 1908
-
Data release - as updated : Lake Gilles (part of the East Eyre [Peninsula] Project). Annual reports to licence expiry/full surrender, for the period 22/12/2005 to 28/11/2016.
Exploration aimed primarily for economic buried Menninnie Dam - style base and precious metals mineralisation hosted by Palaeoproterozoic metasedimentary basement has been conducted on a licence located in the Lake Gilles district. The subject area...-
Document
Published: 11 Jan 1917
-
Data release [made at SA Director of Mines' discretion] : Lake Gilles. Annual reports submitted until the commencement of the Eurilla JV Project licences' joint reporting, for the period 30/1/2007 to 29/1/2010.
A sparsely drill-tested area centred about 10 km west of Lake Gilles is being explored for a variety of buried, possibly economic basement-hosted polymetallic mineralisation occurrences, including deposits of Menninnie Dam style Pb-Zn-Ag (Cu-Au),...-
Document
Published: 30 Mar 1910
-
Roopena and Iron Knob. Joint progress reports, joint annual reports and final report to licences' joint full surrender, for the period 22/4/1992 to 23/2/2000.
Exploration for Mount Isa style, Fe-oxide associated Cu-Au mineralisation has targeted Whyalla Group metasediments and associated Hiltaba Suite granitic intrusions within a 110 km long x 15 km wide, north - south aligned corridor situated west of...-
Document
-
Lake Gilles (part of the East Eyre Peninsula Project). Second partial surrender report, for the period 22/12/2005 to 13/9/2016.
Approximately one-third of the southernmost sub-block 'D' of the subject EL 5109 has been relinquished to comply with expenditure commitments made for the East Eyre Peninsula Project. Activities within the now relinquished area have consisted of...-
Document
Published: 10 Oct 1916
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Double. Annual reports for the period 24/11/2005 to 28/9/2018.
Exploration is being conducted for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the south-central Gawler Ranges. During the first licence year, Minotaur's activities focussed on completing a...-
Document
Published: 22 Nov 1912
-
Data release [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 17/10/2003 to 19/2/2010.
Paleoproterozoic metasediments of the Hutchison Group, and Lincoln Complex granitoids, were the targets of exploration for gold, base metals, and granite dimension stone in an area 40 km south of Kimba. In reporting year 3 for EL 2858, no field work...-
Document
Published: 04 Mar 1910
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Data release - as updated [made at SA Director of Mines’ discretion] : Middleback Range and Moonabie Hills. Joint annual reports for the period 1/2/2007 to 30/1/2019, plus surrender reports to 9/7/2023.
Project Connelly is designed to target haematite mineralisation on OneSteel's mining and exploration leases, including EL 3516 Middleback Range, with the aim of adding to the haematite reserve. In addition to the exploration programme, reserve...-
Document
Published: 29 Mar 1918
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-31 - Peterlumbo Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources (IVR) applied on 30/1/2015 to participate in the PACE Initiative Year 8 (2015) collaborative drilling grant program between industry and government being administered by DSD. The application for subsidy funds submitted by IVR...-
Document
Published: 20 Jan 1916
-
Cleve West. Progress reports and final report to licence full surrender, for the period 25/9/1979 to 27/1/1985.
The target within an area centred ~35 km north-west of Cleve was massive stratiform Broken Hill and Aggenys style base metals mineralisation associated with the Lower and Upper Middleback Jaspilite units of the Hutchison Group. A world class sized...-
Document
-
Mount Double. First partial surrender report for the period 24/11/2005 to 23/11/2007.
Exploration for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the subject relinquished area of the south-central Gawler Ranges utilised existing regional gravity data to attempt to identify...-
Document
-
Conical Hill. First partial surrender report for the period 18/1/2006 to 17/1/2008.
Work done for EL 3486 during the first two years of tenure comprised reviews of existing geological and geophysical information conducted independently by Minotaur Exploration and Toro Energy. EL 3486 was partly covered by a major government-funded...-
Document
-
Gibraltar Rocks. Annual reports and final report to licence full surrender, for the period 30/4/2001 to 24/11/2008.
Exploration of an area with poor basement outcrop located approximately 40 km north of Tarcoola, primarily sought possible fault or breccia-hosted mesothermal gold +/- base metal mineralisation in likely multiphase Mesoproterozoic felsic volcanic and...-
Document
Published: 14 Aug 1908
-
PACE 2020 Initiative : PACE Targeting, Year 1 partnership no. 8 - Central Gawler Project area, Eurilla Dam, Uno, Peterlumbo and Mount Miccollo airborne magnetic/radiometric geophysical survey. Project PT1-08 final report.
Since late 2007, Trafford Resources has been exploring for possible buried economic IOCG or skarn style metallic mineral deposits within the four subject licences located in the southern Gawler Ranges, as part of the larger Wilcherry Hill Project...-
Document
Published: 21 Nov 1911
-
Data release - as updated : Caralue. Annual reports and final report to licence expiry/full surrender, for the period 6/11/2006 to 5/11/2013.
An area centred 40 km west of Kimba has been explored initially for basement gold and nickel mineralisation, and following a joint venture, for possible IOCG and palaeochannel uranium mineralisation. During the first year of tenure, reconnaissance...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release at the third renewal / partial relinquishment of the latter licence : progress and annual reports for the period 14/2/1989 to 30/8/2003. [Index Part 2 of 2].
Abstract continued : During January-February 1993, five traverses spaced 800 m apart of RAB drillholes put in 50 m apart (57 vertical holes for a total penetration of 2688 m) were completed at Death Adder prospect by Aberfoyle Resources to appraise...-
Document
Published: 16 Oct 1903