-
RB 62/00140;Amdel 00485 SADM/Amdel Project 1/1/69 : Greenpatch iron ore beneficiation. Stage 3 - Progress reports 1 to 6, 1964-1965.
Three mineralogically distinct areas within the iron ore occurrence at Greenpatch have been diamond drilled, and small samples of representative portions of the drill cores were submitted for laboratory investigations aiming to upgrade the...-
Document
Published: 01 Apr 1966
-
Pinerow. Annual and final reports to licence expiry/full surrender for the period 2/10/2004 to 9/11/2008.
To continue the assessment of the dimension stone and ornamental stone potential of granitic basement outcrops present on EL 2851, a 5-year Retention Lease, RL 116, was taken out on 7/2/2006 to cover 5.9 ha of the Middle Camp granite pluton. Several...-
Document
Published: 08 Jan 1909