-
1979 Moonlight Flat Seismic Survey. Final report.
AIM: To mature several large structural leads, map possible stratigraphic traps on the flanks of regional highs and extend the regional Vibroseis coverage. METHODS: Survey dates: 10/4/79 - 23/11/79. Energy source: Vibroseis. CDP coverage: 1200%....-
Document
-
1978 seismic survey, Perigundi, final report.
AIM:The 1978 Perigundi Seismic Survey was the fourth modern, digital Vibroseis survey conducted in the Cooper Basin, and was based on similar concepts to the 1973 Mudlankie, 1975 Tooroopie and 1976 Callamurra regional surveys, namely: 1) to further...-
Document
-
Log anomalies and DST results.
Hydrocarbon pool productivity as indicated from wireline logs, compared to that proven by drill stem testing, for the majority of wells drilled in PELs 5 and 6 since early 1990, has been reviewed by the licences' operator, with a view to complementing...-
Document
Published: 22 May 1992
-
Delineation and correlation of the pre - Patchawarra Formation sediments of the greater Daralingie and Wooloo Trough.
Reports on a study aimed at improving the delineation and correlation of pre - Patchawarra Formation sediments in the greater Daralingie and Wooloo Trough area, since a clearer understanding of this stratigraphic section is needed in order to pursue...-
Document