-
RB 45/00118 Final report on iron ore prospecting, Corunna area, Iron Knob district.
In an area of limited basement outcrop located between 2 and 5 miles north-northwest of Iron Knob township, the Department's surface traverse channel sampling (969'), percussion boring (643’) and diamond drilling (1270’) tested a low grade...-
Document
Published: 04 Dec 1957
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-40 - western Middleback Range region - Stony Hill area Archaean to Proterozoic stratabound iron ore mineral prospects. Project final report.
Banded iron formation (BIF) rock outcrops and an associated 15 km long aeromagnetic anomaly located about 20 km west of Iron Baron were chosen by Centrex Metals as high quality targets deserving of exploration for economic iron mineralisation...-
Document
Published: 28 Nov 1908
-
Data release [made at SA Director of Mines' discretion] : Mount Hill - Tod River area. Annual reports [to the commencement of the Northern Eyre Peninsula Project licences' combined reporting status] for the period 13/3/2002 to 12/3/2005.
An area which has had little exploration for iron ore done previously was taken up by Centrex Metals Ltd to cover potentially magnetite-rich Early Proterozoic banded iron formation (BIF) strata outcrops and subcrop located within the Lincoln Uplands...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Pondooma / Ironstone Hut (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 3/12/2002 to 24/9/2015.
An area originally granted as Exploration Licence 3048 Pondooma, which consisted of two separate sub-blocks centred ~60 km south-west of Whyalla, was applied for to cover a poorly exposed belt of banded iron formation (BIF) strata identified on...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat, Cummins, Strawberry Hill and Tarlinga (the Gum Flat Iron Ore Project). Joint annual reports for the period 1/7/2008 to 30/6/2010.
An area of southern Eyre Peninsula consisting of two separate tenement subgroups located in the Port Lincoln west and Cummins districts respectively is being explored for possible economic shallowly buried stratabound occurrences of haematite and...-
Document
Published: 01 Aug 1910
-
Data release - as updated : Gum Flat, Wanilla, Cummins, Tarlinga and Yeelanna (the Gum Flat Iron Ore Project). Joint annual reports submitted until the joint full surrender of remaining project licences, for the period 1/7/2010 to 18/01/2022.
During 2010-2011, the third year of the Gum Flat Iron Ore Project, owner Lincoln Minerals' exploration activities included: - Planning, site preparation and supervision of an RC and aircore drilling program; - Surveying and vegetation clearing for...-
Document
Published: 09 Jan 1920
-
The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 1918
-
Kimba Gap [South] (part of the Middleback Range Iron Ore Joint Venture Project). Annual reports [to the commencement of the Northern Eyre Peninsula Project licences' combined reporting status] for the period 17/9/2003 to 16/9/2006.
A small exploration licence area centred approximately 50 km west-northwest of Whyalla, which is mainly covered by Quaternary sediments, has been taken up by the South Australian Iron Ore Group (SAIOG) to explore for possible concealed economic...-
Document
-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Green Patch. Annual reports for the period 3/12/2001 to 30/5/2006, plus the last six years of tenure' combined annual reports/final report ('no work' letter only) to licence expiry/full surrender, for the period 1/2/2015 to 31/8/2021.
An area centred on the hamlet of Green Patch, located ~10 km north-west of Port Lincoln, was taken up to appraise the iron ore potential of known near surface BIF magnetite mineralisation occurring at the Greenpatch (sic) prospect that had been...-
Document
Published: 16 Oct 1921
-
Data release - as updated [made at SA Director of Mines’ discretion] : Pondooma. Annual and combined annual reports for the period 3/12/2002 to 2/12/2005.
Exploration Licence 3048 Pondooma, consisting of two separate sub-blocks that are centred ~60 km south-west of Whyalla, is located immediately west of the Middleback Range and 5 km west of Onesteel’s Iron Duke mine. This licence was granted to SA...-
Document
-
Data release [made at SA Director of Mines’ discretion] : [Coastal Magnetite Project] Iron ore prospects, eastern Eyre Peninsula. Project operator's report re. the prospects' 2002-2003 evaluation programme.
The key advantages of location and simple metallurgy of coastal Eyre Peninsula magnetite ores presented Portman Mining Ltd with an opportunity to enter a major under-explored and under-developed iron ore province and develop a new export business....-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Data release [made at SA Director of Mines' discretion] : Middleback Range. Progress reports and annual reports to licence expiry/renewal, for the period 6/6/1990 to 5/6/1995.
A licence area consisting of two separate sub-blocks that cover ~460 square km of Palaeoproterozoic BIF ironstone outcrops in the northern and southern parts of the Middleback Range on north-eastern Eyre Peninsula was taken up by The Broken Hill Pty...-
Document
-
Mount Hill (part of the Gum Flat Iron Ore Project). Final report at licence full surrender, for the period 25/2/2008 to 27/8/2015.
A small part of the Lincoln Uplands on east-central Eyre Peninsula, which is centred ~20 km north-east of Cummins, has been explored for possible economic buried graphite and/or base metal mineralisation that may have formed in metamorphosed...-
Document
Published: 22 Jun 1915
-
Data release [made at SA Director of Mines’ discretion] : Wanilla. Annual reports submitted until the commencement of the multi-licence Southern Eyre Peninsula JV Project, for the period 28/10/2004 to 27/10/2006.
A narrow north-south aligned area centred approximately 25 km west-northwest of Port Lincoln, which is mainly covered by Quaternary ferricrete, has been taken up by Centrex Metals Ltd to explore for possible concealed economic deposits of iron ores...-
Document
-
Ironstone Hill (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 17/9/2003 to 17/9/2015.
During the majority of its tenure term, very little field work was conducted on the subject ground. Initially, office studies of available geophysical and open file geological data were performed during 2005 to try to identify possible drilling...-
Document
-
Kooralla. Annual reports and final report to licence expiry/full surrender, for the period 18/1/2002 to 17/1/2005.
EL 2888 was applied for to cover prospective magnetic anomalies thought to be underlain by magnetite-rich banded iron formations (BIF), that exist close to Cowell on the eastern Eyre Peninsula. One geological interpretation of the magnetic anomalism...-
Document